MGBS

download MGBS

of 27

Transcript of MGBS

  • 8/21/2019 MGBS

    1/27

    Mahatma Gandhi Bus Station(M.G.B.S),Hyderabad.

  • 8/21/2019 MGBS

    2/27

    LOCATION MAP

  • 8/21/2019 MGBS

    3/27

    T

    SITE PLAN

  • 8/21/2019 MGBS

    4/27

    3D VIEWS

  • 8/21/2019 MGBS

    5/27

    3D VIEWS

  • 8/21/2019 MGBS

    6/27

    SITE ANALYSISSITE AREA:30 ACRES CLIMATIC CONDITIONS:

    CLIMATE ZONE: TROPICAL HOT AND DRY

    CLIMATE THAT BORDERS ON A SEMI-ARIDCLIMATE,( IE.) TYPICAL HYDERABAD MACROCLIMATE.)

    WIND DIRECTION: SW -NE (INDIANMONSOON DIRECTION)

    VEGETATION: THERE WERE SMALL SHRUBS

    ALONG THE SIDE WAYS ,THERE WAS ABEAUTIFUL LANDSCAPE PROVIDED AT THEMAIN ENTRANCE .THE SITE IS SOURROUNDEDBY MUSI RIVER

  • 8/21/2019 MGBS

    7/27

    Mahatma Gandhi Bus Station(M.G.B.S),Hyderabad.

    M.G.B.S Front Facade

    Geographical Location

    M.G.B.S is Located in the southern Partof Hyderabad., On the island of River musi

    Mahatma Gandhi Bus Station [MGBS]earlier known as Imlibun.

    It is unofficially known as the Imlibunbus station.

    This bus terminus is situated at Imlibunisland on the Musi River and is ownedby Andhra Pradesh State Road TransportCorporation(APSRTC).

    Many buses from other states likeChhattisgarh,Odissa, Karnataka, Madhya Pradesh,Maharashtra,Goa and Tamil Nadu arrive andDeparture at this bus station Daily.

    M.G.B.S. is the one of the 2ndlargest terminalin Asia.

    Site is situated between the twobranches of musi river .

    `Mahatma GandhiBus Station(M.G.B.S)

    River musi

    River musi

  • 8/21/2019 MGBS

    8/27

    It is provided at a central imposing location.

    M.G.B.S is surrounded by Residential zone, Public Buildings,commercial zone , Tourism zone etc.,

    High court of Andhra Pradesh Salargunj museum

    Musi river HyderabadCentral LibraryHyderabad

  • 8/21/2019 MGBS

    9/27

    Connectivity:

    2

    4

    3

    2

    1

    1

    4

    3

    Mahatma Gandhi Bus Station(M.G.B.S),

    Hyderabad Railway Station4.4 Km From M.G.B.S.

    Secunderabad Railway Station8.6 Kms From M.G.B.S.

    Rajiv Gandhi International Airport24 Kms From M.G.B.S.

  • 8/21/2019 MGBS

    10/27

    M.G.B.S. Estate.

    The Mahatma Gandhi Bus Station was started in the year 1989and completed in two phases till 1996.It is completed at a cost ofRs 13 crores.

    This terminal is designed by Uppel Ghosh.Total site area is 30Acres.

    Mahatma Gandhi Bus Station(M.G.B.S)

    River musi

    River musi

    Site is situated between the two branches of musi river .

    Plantation was done mainly to act as a visual barrier to Musi

    There are 74 platforms for incoming and outgoing buses

  • 8/21/2019 MGBS

    11/27

    PedestrianTraffic

    Bus ArrivalCirculation

    Non BusTraffic

    ConflictPoints

    Bus DepartureCirculation

    Circulation in M.G.B.S

    Aerial view of Bus terminal

    View of Bus Boarding Point

    Bus Idleparking

  • 8/21/2019 MGBS

    12/27

    The planning and design were totally done in accordance withthe site and its location. The land around that is properly utilizedwithout any wastage.

    2

    The Design and Planning of the Terminal.

    The site is approached through abridge from the main roaddue to its location in an island.

    1

    1

    Bus Exit

    3

    4

    5

    BusEntry

    1

    1

    6

  • 8/21/2019 MGBS

    13/27

    The left wing of the entrance foyer leads to the departuralplatforms.

    The corridor leading to the departural platforms contains allthe important public facilities and Current Ticket Counters .

    The Main Entry leads to the double height entrance porchwhich in turn leads to enquiry and reservation counters.

    The main entrance foyer leads to the administration office inupper levels.

    Main entrance2 Reservation Counter3

    Departural Platform.4

    5 Current Ticket Counters.Departural platforms:

    All the bays are at45angle.

    Ticket counters are availablewith each 11-15 bus bays.

    Height of the platform fromroad is 12

    Bus Bay @45 Angle.

  • 8/21/2019 MGBS

    14/27

    The Administration work is carried out within executive directors

    who control the executive offices and chief accountants office. Thefunctions of this are basically

    -To take all the complaints.

    -Take cares of the transportationfacilities within the state.

    -Ensures the proper functioning of thebuses.

    Dispatch office: Dispatch office controls all bus

    movements and is located onthe concourse so that it can

    observe all loading berths. The location of the dispatchoffice is such that it can havecontrol over all the platforms.

    It is hexagonal and glasswalled structure.

    Dispatch office:6

    Administration office:

    The administrative works are carried out zonal wise mainlywithin three zones .They are:1. Hyderabad - Karimnagar Region.

    2. vijayawada-vijayanagaram Region.

    3.Cuddapah-Nellore and Ranga reddy region.

    Admin.office7

  • 8/21/2019 MGBS

    15/27

    Water supply The overhead tank at the 3rdlevel

    acts as a main source for drinking

    and other facilities. The capacity of this tank is 20,000 liters. The rain water drain pipes are directly connected to the

    musi river.

    Electricity: Artificial lighting is used to the maximum extent in theadministration offices and few counters due to insufficient naturalventilation.

    Sanitary:

    About 23 toilets are provided in terminal at different points forthe easy accessibility.

    The sanitary pipelines are connected to the musi river.

    Horizontal & vertical connectivities are given by corridors,stairs

    and ramps.

    Services :

    Toilets Drinking Water FirstAid

    Snacks

  • 8/21/2019 MGBS

    16/27

    Structure

    Foundation: as the type of soil available at the site is blackcotton soil, pile foundation of 15 m deep is laid.

    Columns: box columns of 50cm size at 7m spacing are used.

    The space in between the columns is properly utilized as thefixed public seating with the side table for luggage .

    The connecting wall between the columns have a inverted vshaped arch which blends with the elevation.

    Slab:the architect used two way cantilever slab in thisstructure.

    The total height of the slab above platform is 7-8m.

    Elevation: The rhombus shaped voids and inverted v arches inthe elevation act as main source of ventilation.

    Rhombus shaped shading devices are used to blend with theelevation.

  • 8/21/2019 MGBS

    17/27

    Materials:

    Bricks: used for the interior & separation walls.

    Stone: compound walls.

    Marble & Tandur Stone: for platform flooring.

    Glass :for the counters and windows.

    Pavement tiles: for the corridors, ramps, pathways.Wood: used for doors , windows,frames,partitions,furniture

    in the offices.

    Concrete: parking, bus depots and at the entrances.

    Pvc: for the counters with computers.

    Rcc : slab s, beams &columns.

    Acrylic sheets: for the sky lights.

    Marble: in the offices,stairs,seating for the columns upto 2m height.

    Concrete Road Concrete Road

    Marble Flooring

    Pavement Tile Flooring

    Acrylic Sheets

    Marble & TandurStone Flooring

  • 8/21/2019 MGBS

    18/27

    Rest rooms provided forpassengers.

    Police station

    Office interiorsAutomated TellerMachine

    Other facilites:

    Other facilities within theterminal which are properlyaccessible to the public are

    Atm , Police outstation Security Rest rooms and dormitory Restaurants Shops, telephone booths Drinking water & toilets

    Restuartant.

    Drinking WaterFountain

  • 8/21/2019 MGBS

    19/27

  • 8/21/2019 MGBS

    20/27

    SHOPS RGROUND FLOOR PLAN

  • 8/21/2019 MGBS

    21/27

    ENTRANCE LOBBY

    SHOPS

    RESERVATION COUNTER

    ANALYASIS:The Main Entry leads to the double height entrance porchwhich in turn leads to enquiry and reservation counters.As we enter we have an information counter in front of entrance,it make easy to public to move around comfortableThere are shops and atms located in ground floor we have goodample amount of light coming in ground floor as its left side isopen for bus baysit has separate counters depending upon the region

  • 8/21/2019 MGBS

    22/27

    FIRST FLOOR PLANOFFICE

  • 8/21/2019 MGBS

    23/27

    LOBBY ADMINSTRATIVE OFFICE

    CORRIDOROFFICE

    ANALYSIS :Admistrative department was placed on the first floorThere was no proper natural ventilation

  • 8/21/2019 MGBS

    24/27

    SECOND FLOOR PLAN

    STAIRCASE

    LOBBY

  • 8/21/2019 MGBS

    25/27

    PARKING:

    2 WHEELER PARKING : 3Capacity (3000 Vehicle )

    CAR PARKING : 2 Capacity (150

    cars ) AUTO STAND : 25 Autos

    2-WHEELER PARKING 2-WHEELER PARKING

    AUTO STAND CAR PARKING

  • 8/21/2019 MGBS

    26/27

    Merits:

    Site is located in the centre of the city having good roadnetwork.

    Parking facilities provided are well designed giving sufficientspace for all types of vehicles .

    Platforms, counters, seating arrangements are designedaccording to user comforts .

    Double height structure creates a good ambience at theentrance.

    Accessibilities to platforms from entrance is designed in such away so that handicapped people can use comfortably.

    Enquiry counters are placed near the platform.

    Cloak room is located at well-secured place with sufficient racks.

    Toilets are placed wherever necessary.

    Seating arrangements is around the box columns.

    Facilities like Atms, bookstalls etc. Are provided.

    Demerits:

    Island in musi river.

    Placement of platforms is far from the Main Entrances.

    Placement of drinking water fountains near to toilets.No horizontal growth is expected only vertical growth is

    expected.

    Rainwater harvesting is not designed.

  • 8/21/2019 MGBS

    27/27

    THANK YOU

    BY,MOHD.KHIAM (50 )

    MAHENDER (46)

    NAGENDER(43)

    RASHID(59)