MG PR 10 Proses Perencanaan dan Desain 2016 ENGLISH
Transcript of MG PR 10 Proses Perencanaan dan Desain 2016 ENGLISH
10/18/2016
1
MK DASAR DASAR ARSITEKTUR LANSKAPMK. DASAR‐DASAR ARSITEKTUR LANSKAP
(ARL 200)
WEEK 10
PlanningPlanning is systematical tools which’s used to define required condition from the site and the way to achieve it. (Simonds & Starke, 2006)
Commiss‐ioning
Planning process (Simonds & Starke, 2006)
InventoryAnalysisSynthesis
Concept‐Planning
DesignConstruction
AnalysisS h i
Commiss-ioning Inventory
Synthesis
Concept‐Planning
DesignConstruction
DESIGN/PLANNINGDesigning is an extend process site planning where this process concern about design components selection, elements, structure, the plants and it’s combinations as problem solving for the site problem.
(Laurie, 1994)
Design process should give logic thought and good team work to create any design, can give clear information about design, give the best alternative solutions, and explain that solutions to client. (Booth, 1983)
Design Process (1)Design process by Booth (1983)1. (Project acceptance)2. (Research and analysis) Base map preparing Inventhory and analysis Client interviewing Program developmentProgram development
3. (Design) Function diagram Site relation diagram Concept plan Design form study Preliminary design Schematic plan Master plan Design development
Design Process(2)4. (Construction Drawings)
Layout plan
Grading plan
Planting plan
Construction details
5. (Implementtion)
6. (Post-Contruction Evaluation Maintenance)
7. (Maintenance)
10/18/2016
2
Booth Model (1988)
Pro
ject Acceptance
Rese
arch/A
nalysis
Conce
pt
(Planning‐D
esign)
Implementation
Post‐C
onstru
ction
Evaluation
Maintenance
Constru
ction
Drawings
Commissioning
Rese
arch/Inve
nto
ry
Analysis‐Synth
esis
Conce
pt
(Planning‐D
esign)
Constru
ction
Operation
SimondsModel (2006)
THE MOST IMPORTANT PART OF LANDSCAPE PLANNING/DESIGN PROCESS
INVENTHORY
By planning and design process based on Simonds andBooth, we can see that every single process contain important part which are:
INVENTHORY
ANALYSIS
SYNTHESIS (concept making till site pan)
CONSTRUCTION DETILE
The result of planning/design process are compiled, reported and presented to clients for next to be done(CONSTRUCTION)
CASE 1: BATAM BIOISLAND
DEVELOPMENT PLAN
Exp for inventhory map
BATAM BIOISLAND
DEVELOPMENT PLAN
ADMINISTRATION BOUNDARY MAP
BATAM BIOISLAND
DEVELOPMENT PLAN
CONTOUR MAP
BATAM BIOISLAND
DEVELOPMENT PLAN
SLOPE MAP
10/18/2016
3
BATAM BIOISLAND
DEVELOPMENT PLAN
SOIL MAP
BATAM BIOISLAND
DEVELOPMENT PLAN
DRAINAGE MAP
BATAM BIOISLAND
DEVELOPMENT PLAN
HYDROLOGY MAP
BATAM BIOISLAND
DEVELOPMENT PLAN
RIVER MAP
BATAM BIOISLAND
DEVELOPMENT PLAN
VEGETATION MAP
BATAM BIOISLAND
DEVELOPMENT PLAN
ANIMAL MAP
10/18/2016
4
BATAM BIOISLAND
DEVELOPMENT PLAN
VISUAL MAP
CASE I: BATAM BIOISLAND DEVELOPMENT PLAN
Exp for synthesis Space Concept
BATAM BIOISLAND
DEVELOPMENT PLAN
SPACE CONCEPT
BATAM BIOISLAND
DEVELOPMENT PLAN
SPACE ZONATION
BATAM BIOISLAND
DEVELOPMENT PLAN
GREEN SPACE ZONATION
CASE 1: BATAM BIOISLAND DEVELOPMENT PLAN
Exp for SynthesisMaster Plan
10/18/2016
5
BATAM BIOISLAND
DEVELOPMENT PLAN
LANDSCAPE PLAN
BATAM BIOISLAND
DEVELOPMENT PLAN
MASTER PLAN
CASE 2: SITE PLANNING FOR WATER
CONSERVATION IN SITU SAWAH BESAR AREA DEPOK
Exp for Inventhory
BESAR AREA, DEPOK
Base map
Land use map
CASE 2: SITE PLANNING FOR WATER
CONSERVATION IN SITU SAWAH BESAR AREA DEPOK
Exp for Synthesis Concept
BESAR AREA, DEPOK
10/18/2016
6
Space usage concept BLOCK PLAN
CIRCULATION PLAN GREEN SPACE PLAN
CASE 2: SITE PLANNING FOR WATER
CONSERVATION IN SITU SAWAH BESAR AREA DEPOK
Exp for SynthesisSite Plan
BESAR AREA, DEPOK
SITE PLAN
10/18/2016
7
CASE 3: MASTERPLAN OF PAKUWON
SPICE PLANT SCIENTIFIC TOURISM AREA, PARUNGKUDA, SUKABUMI
Site Orientation Map
Kebun Induk Kelapa (KIKS)
Kebun Induk Kelapa (KIKS)
Areal KWI
Penelitian Cengkeh
Pembibitan
Kebun Induk Jarak (KIJP)
Skala 1:7500
Inventhory Map
ConceptConcept
Space Concept Circulation Concept
10/18/2016
8
MASTERPLAN
Illustration to explain MasterplanIllustration to explain Masterplan
Sections
3D Perspective Exp for Landscape Design
GREENING BIODIVERSITY GRAND DESIGN ARRANGING AND DEVELOPING
IN AREA ORF PT. Pertamina Hulu Energy‐West Madura Offshore
10/18/2016
9
Designing steps:• Job Receiving• Site Survey • Site Analysis• Design Concept• Site Plan• 3D Perspective & Detil Design
(implementation)
GRAND DESIGN BIOLOGICAL DIVERSITYPT PERTAMINA HE WMO GRESIK
Foto existing Mangrove Rhozophora mucronataSumber: AAH
Foto existing dari udaraSumber: PT PHE WMO
This Activity is designing shoreline mangrove area in PT Pertamina HE WMO Gresik. Any site part has contain mangrove trees and existing animals. Design is oriented to new mangrove planting design, acces, sirculations and supporting facilitydan fasilitas for mangrove recreating and maintaining
Foto existing Satwa BurungSumber: AAH
Existing vegetation inventhory map
Survey Tapak
Animal inventhory mapSurvey Tapak
Space Concept
Circulations Concept
Site Plan
3D Perspective
10/18/2016
10
Detile illustration
Implementation phase 1 & Ceremonial29 Juni 2012
TASK 10 After attending this practice, explain what the meaning of:
Inventhory
A l i Analysis
Synthesis (Concept arranging till Site Plan/Masterplan)
In the process of landscape designing or planning
You guys can use any books about Landscape architecture in LA departement library.
TASK 10 Write the answer down at A4 paper with 2 cm margin‐line, PORTRAIT
Write your full name, NIM, and major in every single paperpaper
Submit it in 11th week.
GOOD LUCK !!!