Mezzanines & Tiered Flooring - Thistle Systems · Mezzanines & Tiered Flooring – MAX THE CUBE....

4
inspiring solutions from thistle systems Mezzanines & Tiered Flooring www.thistlesystems.co.uk – MAX THE CUBE

Transcript of Mezzanines & Tiered Flooring - Thistle Systems · Mezzanines & Tiered Flooring – MAX THE CUBE....

Page 1: Mezzanines & Tiered Flooring - Thistle Systems · Mezzanines & Tiered Flooring – MAX THE CUBE. Mezzanine and Tiered Flooring Whether you are looking for additional office space

inspiring solutions from thistle systems

Mezzanines & Tiered Flooring

www.thistlesystems.co.uk – MAX THE CUBE

Page 2: Mezzanines & Tiered Flooring - Thistle Systems · Mezzanines & Tiered Flooring – MAX THE CUBE. Mezzanine and Tiered Flooring Whether you are looking for additional office space

Mezzanine andTiered Flooring

Whether you are looking for additional office space or a mezzanine that consists of thousands of square metres, our highly experienced design and project management teams can help you maximise the full potential of your space.

We can take care of every aspect of the mezzanine including the access stairs, lifts, and additional storage facilities.

UP TO

100%Additional Floor Space with

Mezzanine or Tiered Flooring

Page 3: Mezzanines & Tiered Flooring - Thistle Systems · Mezzanines & Tiered Flooring – MAX THE CUBE. Mezzanine and Tiered Flooring Whether you are looking for additional office space

Mezzanine Creates Additional Production Space

POTENTIAL APPLICATIONS

www.thistlesystems.co.uk – MAX THE CUBE

Mezzanine Creates Additional Storage Space

Mezzanine Creates Additional Office Space WIth Secure Storage Mezzanine Creates Additional Office Space WIth Integrated Boardroom

Multi-Tiered Flooring with Record Storage Mezzanine Floor to Create Storage Area Above Retail Space

Mezzanine Flooring and Tiered Flooring cab deliver more than additional storage capacity. We have extensive experience in designing, manufacturing and installing mezzanines and tiered flooring solutions which can increase production capacity, improve warehouse performance, provide secure storage space or create additional office space.

Check out a few examples or head to our website for more details.

KEY COMPONENTS OF A MEzzANINE

Chipboard or Mesh Flooring Up and over pallet gate Staircase with Handrails

Our team of experts will guide you through the process to optimise the column grid, determine the relevant building and fire regulations and specify the required loading requirements.

Whilst each mezzanine floor will be designed to meet the exact requirements of the individual project, there are a number of key components in its construction.

Contact us now to discuss your requirements.

Structural Beams on Column Column with base plate Secondary Beam

Page 4: Mezzanines & Tiered Flooring - Thistle Systems · Mezzanines & Tiered Flooring – MAX THE CUBE. Mezzanine and Tiered Flooring Whether you are looking for additional office space

FULL PROJECT MANAGEMENT AND INSTALLATION SOLUTION

Our innovative Max the Cube design solutions are backed up by a comprehensive installation and project management solution to provide a complete turnkey solution.

Our team of experienced project management team will oversee the entire process from initial meeting through to final commissioning and sign off.

We can also advise on building warrants and organise as necessary, as well ensuring the design and specification meet the required health and safety regulations.

Safety is paramount at every stage of the process and our Project Managers are fully qualified to SMSTS as well as holding the Achilles, CHAS, Safe Contractor and Constructionline accreditations.

NAVIGATING YOU THROUGH THE CDM REGULATIONS

Depending on the size and scope of works in your mezzanine or tiered flooring project, you may find your mezzanine floor project falls under the CDM regulations.

These now play a major role in the construction industry and are designed to ensure every notifiable project is carried out in accordance with the latest health and safety legislations.

The 2015 changes have stipulated new responsibilities and roles in the delivery of a CDM project.

With extensive experience in the full process from design through to completion, we can carry out all roles in the process from Principal Designer through to Contractor.

Whatever your objectives, we will design the optimum solution to maximise capacity and dramatically reduce your costs. Contact us now to find out more.

INSTALLATION EXPERTISE

Thistle Systems GroupGlasgow Office: 2 Deerdykes Court North, Cumbernauld, G68 9FL | T: 01236 453888 F: 01236453999

Aberdeen Office: Riverside House, Riverside Drive, Aberdeen, AB11 7LH | T: 01224 673088

www.thistlesystems.co.uk – MAX THE CUBE