A Proposal for Updating the MWSS Master Plan
i
Metropolitan Waterworks & Sewerage System
A proposal for updating the MWSS 2005 Master Plan
Prepared for DENR and MWSS
January 2011
A Proposal for Updating the MWSS Master Plan
ii
Economic Development Services Pty Ltd PO Box 125, Unley BC 5061, South Australia +61 (0)408 853 376 (mobile) +61 8 7226 6169 (office) [email protected] www.edsfirst.com
A Proposal for Updating the MWSS Master Plan
iii
Table of Contents
Page
Table of Contents iii
Abbreviations & Glossary iv
Introduction 6
Sections in Master Plan to Update 8
Section 1: Summary of land use status 8
Section 2: Population and demographic data 8
Section 3: Metro Manila water quality 9
Section 4: Forecast of sewage volumes 10
Section 5: Assessment of sewerage technologies 11
Section 6: Development of policies, standards and procedures 11
Section 7: Inventory and associated data on S&S systems 13
Section 8: Restate the strategy for the provision of S&S 13
Section 9: Priorities and new projects and activities to reduce pollution loads 15
Draft Outline of Headings for the Updated Master Plan 16
Expected Contributions from Agencies 19
A Proposal for Updating the MWSS Master Plan
iv
Abbreviations & Glossary
ADD Average Day Demand ADR Appropriate Discount Rate AIC Average Incremental Cost AO Administrative Order BOD Biological Oxygen Demand BOT Build-Operate-Transfer (mode of project delivery) BSWM Bureau of Soil and Water Management CA Concession Agreement CAS Conventional Activated Sludge CO Corporate Office CWA Clean Water Act CWA-IRR Clean Water Act-Implementing Rules and Regulations DA Department of Agriculture DAO Departmental Administrative Order DBP Development Bank of the Philippines DENR Department of Environment and Natural Resources DOE Department of Energy DOH Department of Health DPWH Department of Public Works and Highways EIRR Economic Internal Rate Return EIS Environmental Impact Statement EMB Environmental Management Bureau EUFS Environmental User Fee System FIES Family Income and Expenditure Survey FIRR Financial Internal Rate of Return GDP Gross Domestic Product GIS Geographic Information System HDI Human Development Index HEPP Hydro-Electric Power Plant HLURB Housing and Land Use Regulatory Board IEC Information Education and Communication IRR Implementing Rules and Regulations JICA Japan International Cooperation Agency LGU Local Government Unit LLDA Laguna Lake Development Authority MCA Multi-criteria Analysis
A Proposal for Updating the MWSS Master Plan
v
MCSS Manila Central Sewerage System MDU Mobile Dewatering Units METROSS Metro Manila Sewerage and Sanitation MM Metro Manila MMDA Metro Manila Development Authority MSSP Manila Second Sewerage Project MTSP Manila Third Sewerage Project MWCI Manila Water Company, Inc. MWSI Maynilad Water Services, Inc. MWSS Metropolitan Waterworks and Sewerage System NCR National Capital Region NEUFS National Environmental Users Fee System NGO Non-Government Organization NHA National Housing Authority NPC National Power Corporation NPV Net Present Value NRW Non Revenue Water NSO National Statistics Office O&M Operation and Maintenance PEMSEA Partnership in Environmental Management for the Seas of East Asia PD Presidential Decree PRRC Pasig River Rehabilitation Commission RO Regulatory Office RR Rate Rebasing SAP Strategic Action Paper SME Small and Medium Enterprises SpTP Septage Treatment Plant S&S Sanitation and Sewerage SSMP Sewerage System Master Plan STAMP Septic Tank Management Program STED Septic Tank Effluent Disposal STP Sewerage Treatment Plant TA Technical Assistance WTP Water Treatment Plant WQMAs Water Quality Management Areas WWTP Wastewater Treatment Plant
A Proposal for Updating the MWSS Master Plan
6 of 22
Introduction
The purpose of this report is twofold. First, to outline a process for selectively updating the MWSS
Master Plan of 2005. Second, to identify the likely components that will form part of the Updated
Master Plan. The original Master Plan provided a comprehensive plan from 2005 to 2025 for the Metro
Manila area and the development of water supply, sewerage and sanitation services. The Updated
Master Plan is not intended to replace this but rather to provide a focus on specific parts of the 2005
Master Plan with the intention of providing additional information and a strategic problem solving
approach to several key issues.
At least three major events are continuing to influence the objectives and strategies laid out in the
original Master Plan. The first of these events is the extension in 2009 of the concessionary agreement
for the delivery of services. The original concessionary agreements have been extended from 2022 to
2037. The original Master Plan’s investment priorities need to be reconsidered in light of the extension.
Second, the Philippine Clean Water Act of 2004 (Republic Act No. 9275) continues to exert pressure on
lead agencies. The Clean Water Act provides for a comprehensive and integrated strategy to prevent
and minimize pollution through a multi-sectoral and participatory approach involving all stakeholders.
The Clean Water Act identifies substantial roles for DENR and NWRB, and has significant implications for
MWSS and the concessionaries.
Third, the December 2008 Supreme Court Order for all concerned government agencies to coordinate
the clean-up, restoration and preservation of the water quality of the Manila Bay, mentions directly
DENR and MWSS and has implications for the concessionaries, as well as, many other agencies.
These major events, combined with the ongoing low rates of sewerage provision in the Metro Manila
area, means the Updating of the Master Plan will focus on environmental issues. The increased concern
with environmental issues will relate specifically to the provision of sanitation and sewerage (S&S)
services and pollution loading to the Metro Manila river systems, the Manila Bay and the Laguna Lake
area. More specifically, the interrelated purposes (objectives) of selectively updating the Master Plan
are as follows:
i. Reduce water pollution to the Metro Manila river systems and the Manila Bay;
ii. Improving S&S services in the Metro Manila area;
iii. Inform the 2012 rate rebasing exercise;
iv. Identify priorities and provide strategic basis for future plans and programs; and
v. Resolve technology and policy issues affecting future plans and programs.
A Proposal for Updating the MWSS Master Plan
7 of 22
The production of this report is the first step in a process for updating and achieving the above
objectives. This report outlines what should be updated and how to update the Master Plan. It divides
the work into specific sections.
The next step, through a process of consultation, is to agree on what to update and for lead agencies to
provide, were possible, more details and guidance. The consultation process, as dictated by the terms of
reference, will occur through a workshop with key stakeholders. Ideally, a small number of key decision
makers from DENR, MWSS, MWSI and MWCI will attend the workshop. The aim of the workshop is to
provide key stakeholders an opportunity to guide and direct the MTSP Team in relation to the sections
of the Master Plan to be updated and what the Updated Master Plan should look like.
The third step is to identify for each section of the proposed Updated Master Plan one or more contact
points within each agency. These contact points will be a critical part of the process. Since much of the
information and input for the selective updating of the Master Plan will come from the key agencies of
DENR, MWSS, MWSI and MWCI and from a variety of different sources, it is important to have contact
points that can act as facilitators between the MTSP Team and the relevant and various sources within
each organisation.
Following the three step approach, this report is divided into three main “chapters”. The first chapter
outlines the nine sections proposed for updating. For each of these sections the report provides a
description of: a) what will be updated; b) why it should be updated; c) how we propose to update it,
and; d) who will need to provide the necessary information. The second chapter provides a chapter and
subsection outline of the proposed Updated Master Plan. The chapter outline corresponds to the nine
sections set out in chapter one of this report. The third section provides a table for identifying key
contact points within each agency and for each of the nine sections. This table should be filled in at the
proposed consultative workshop.
A Proposal for Updating the MWSS Master Plan
8 of 22
Sections in Master Plan to Update
As mentioned in the introduction, the nine sections to be updated in the Master Plan are outlined here.
Some of them relate directly to chapters or sections in the 2005 Master Plan, others are an
amalgamation, and do not have a direct equivalent in the existing Master Plan. Instead, they reflect the
shift in focus to environmental issues and a more strategic problem solving approach. As mentioned in
the introduction, the proposed sections for updating the Master Plan are not meant to replace the
Master Plan of 2005. Rather, they are intended to add and provide a more strategic focus to issue of
pollution abatement. The nine sections presented here should be read in conjunction with the following
chapter which provides a chapter outline for the proposed selective updating of the Master Plan.
Section 1: Summary of land use status What: The summary of land use status provides the contextual setting for discussing the S&S
requirements for Metro Manila. In the Existing Master Plan, this was covered in Chapter 4
(part 4.1). The Updating exercise will examine the previous Master Plan’s information and
predictions and examine if these have substantially changed, and if so, describe in detail those
changes. The update will include:
i. Information on changes to existing and proposed land use since the 2005 MWSS Master
Plan, and;
ii. Changes in urban development trends and existing vacant land.
Why: It’s important to examine whether the previous data is still valid, and if it has changed how it
has changed and what the implications are for Metro Manila’s S&S requirements.
How: Data will be collected from LGUs, MMDA and NSO. Other relevant government agencies may
be identified for additional information.
Who: The MTSP consultants’ will collect the information from the relevant agencies.
Section 2: Population and demographic data What: Together with section 1: Summary of land use status, the population and demographic data
provides the necessary contextual information essential for updating the MWSS Master Plan.
Information on population will include:
A Proposal for Updating the MWSS Master Plan
9 of 22
i. Update of demographic trends and whether they have changed since the MWSS Master
Plan was done, and;
ii. Changes that have occurred in population density in cities/municipalities.
Why : Demographic trends and population distribution are essential for planning S&S requirements.
How: Data will be collected from LGUs, MMDA and NSO. Other relevant government agencies may
be identified for additional information. The previous data will be extended from 2025 to 2037,
in line with the concession extension.
Who: The MTSP consultants’ will collect the information from the relevant agencies.
Section 3: Metro Manila water quality What: The Updated Master Plan will provide an overview of water quality across Metro Manila
catchment areas. This will cover the river systems flowing into Metro Manila Bay and covered
by the concessionaries. The precise project boundaries are yet to be finalised, but until then, it
provisionally includes the Pasig-Laguna River Basin, as well as, the sub-basin Parañaque (Las
Pinas) River System. The river basins are divided into the following Water Quality Management
Areas (WQMAs):
1. San Juan-MM River System;
a. Quezon City
b. San Juan
c. Mandaluyong City
2. Navotas, Malabon, Tullahan-Tenejeros River System including:
a. Quezon City
b. Malabon City
c. Caloocan City
d. Municipality of Navotas (dependent on final NMTT boundary)
3. Parañaque-Zapote River System, including:
a. Pasay City
b. Parañaque City
c. Las Piñas City
d. Bacoor (not included in Metro Manila)
Drawing on the modelling work being done by the MTSP Team, the intention is to provide
existing figures and trends in water quality. The modelling will allow predictions to be made
about the impact of various interventions. Depending on government agencies taking
ownership, various scenarios of interventions and expected impacts may be generated.
A Proposal for Updating the MWSS Master Plan
10 of 22
Why: The modelling and measurement of water quality is essential for identifying various pollution
loads across the two concessionary areas and in planning strategic interventions for reducing
those pollution loads.
How: MTSP has an international consultant currently developing a partial water quality model for
the Metro Manila catchment river system. A second MTSP international consultant is working
on a harmonised monitoring program for the Manila Bay catchment area. A third long term
project being managed by PEMSEA within DENR is also working on modelling and measuring
pollution loads in the Greater Metro Manila area. By December 2010, PEMSEA is expecting to
have a first run of their model and identified indicative pollution loads. Capacity development
is also being carried out by the MTSP Team in order to enable DENR, or agencies within DENR,
to manage the model and monitoring functions.
Who: In updating the Master Plan, the MTSP team will rely on DENR and MWSS to generate and
provide the raw data needed for the analysis. While the MTSP international consultants are
developing the modelling and harmonised measuring systems, it will be DENR or agencies
within it, or MWSS, which will manage the model and generate the required data.
Section 4: Forecast of sewage volumes What: The updated Master Plan will identify current sewage and septage loads and forecast them to
2037. If possible, further breakdown of these figures will be done by geographical area or
other criteria. The analysis will include targets for 100 per cent coverage and include likely
alternative low and high scenarios of coverage. Specifically this section will:
i. Identify and plot exiting loads for sewage and septage;
ii. Forecast sewage and septage loads to 2037;
iii. Identify current level of services for treating sewage and septage; and
iv. Forecasted targets for sewage services to achieve 100% coverage 2018.
Why: The forecast of sewage and septage loads will provide a guide to the size of the challenge
faced. And, in conjunction with section 7, identify the necessary physical infrastructure and
financial targets needed to meet the challenge (see Section 7).
How: The projections will be done from current sewage and septage data and projected population
growth. These will then be used to calculate sewage and septage targets.
Who: Data for sewage and septage will need to be supplied by MWSS and MWSI and MWCI. They
may also provide available forecasted volumes. Targets will be derived in consultation with
DENR, MWSS, MWSI and MWCI.
A Proposal for Updating the MWSS Master Plan
11 of 22
Section 5: Assessment of sewerage technologies What: The existing technologies identified in the Master Plan will be updated. This will include an
assessment of sewage collection, transport and treatment technologies and sludge
management (collection, treatment and disposal) options. The work will be linked with the
Septage Management Framework. The assessment will specifically focus on the technology
and practical aspects of using a combined gravity drainage (stormwater and sewage) system.
The policies, regulations and institutional requirements related to the use of a combined
system will be identified here and covered in the next section. Other related technological
development since 2005 that may have applications for Manila will also be reviewed.
Specifically, the Updated Master Plan will revisit the following three findings, quoted verbatim
from the 2005 Master Plan (Volume 3, Chapter 7, Section 7.3.6 (page 7-15)):
i. A Combined Drainage System (i.e. storm drainage and dirty water) should
be mostly employed where possible for conveyance of dirty water to a
treatment plant. The combined system should be gradually passed out in
favor of a separate system for the protection of human health.
ii. The separate sewerage system that should be combined sewerage should
be small bore and STED / STEP systems.
iii. The appropriate sewerage design should be suited for each drainage
catchment.
Why: It is important to verify that the technological choices presented in 2005 are still valid today,
and if they have changed, how have they changed. Moreover, the experience and lessons
learned from operating a combined gravity drainage system should be identified and
incorporated in future planning.
How: DENR, MWSS, MWSI and MWCI will be asked to share their experience in regards to
technology choice and functions. The MTSP international and national consultants will also
gather information from independent experts in Manila and from outside of the Philippines.
Based on this information, the MTSP Team will adjust or confirm the findings in the 2005
Master Plan. Where appropriate, the analysis will, in addition to the technical analysis,
included financial considerations.
Who: DENR, MWSS, MWSI and MWCI will be expected to contribute their technical knowledge and
experience. The MTSP international and national consultants will also gather information from
independent experts, and carry out their own analysis.
Section 6: Development of policies, standards, procedures and
institutional arrangements
A Proposal for Updating the MWSS Master Plan
12 of 22
What: Section 6 will identify the necessary and complimentary policies, standards, procedures and institutional arrangements necessary. It will do so by building on the assessment of sludge management options (e.g. collection, treatment and disposal) and more generally in line with the recommendations for improving S&S services and reducing pollution loads, as identified in the rest of the Updated Master Plan. The MTSP Team proposes developing some or all of the following:
i. Guidelines for Operation of Combined System
ii. Pre-treatment Standards
iii. Effluent Standard
iv. DENR-DILG DAO on LGU Ordinance
v. Guidelines in Classifying Water Bodies
vi. Standards and design of septic tanks
vii. Guidelines for Bio-solids
viii. Septage Management Framework
ix. Guidelines on Harmonized Water Quality Management System for Metro Manila
x. Data Classification Standard for PIC
xi. Guidelines for Sewerage System Under Rehabilitation
xii. Guidelines for Low Cost Sanitation
xiii. An Information Education and Communication (IEC) strategy for implementing the MP
Why: The implementation of specific technology options such as the combined gravity drainage
system and other investments in pollution abatement, requires complimentary policies and
regulations. In addition, additional policies and regulations are required to support the role of
LGU’s, as well as, other government agencies, in the delivery of S&S services. Moreover,
institutional arrangements will need to be reviewed and enhanced. The objective of listing the
policy and institutional requirements and discussing them in the Updated Master Plan is to
highlight the importance and their complementary nature in a strategic and comprehensive
approach to improving S&S services and reducing the pollution levels in the Manila Bay.
How: The MTSP Team has initially identified a number of specific policies, standards and procedures
required to improve S&S service delivery and reducing the pollution load into Manila Bay (see
above). In consultation with DENR, DOH, MWSS, LLDA, PRRC and other organisations, these or
other policies and procedures will have to be confirmed. An agreed number of these policies,
standards and procedures will be developed and will be appended to the Updated Master
Plan. The importance of key institutions, particularly the LGUs and MMDA, working with
concessionaries in a combined Drainage System (i.e. storm drainage and dirty water), will also
be reviewed. To obtain inputs, the MTSP team will hold one or more workshops focused on
specific policies or procedures.
Who: In consultation and cooperation with DENR, DOH, MWSS, LLDA, PRRC, as well as, other
stakeholders, the MTSP Team will develop the agreed policies, standards and procedures.
Additional policies, procedures and standards that are required but not developed under the
A Proposal for Updating the MWSS Master Plan
13 of 22
MTSP program, will be identified and listed in the Updated Master Plan for future
development.
Section 7: Inventory and associated data on S&S systems What: With a focus on the next five year rate rebasing period (2012 to 2017) and in regards to an
inventory of S&S systems, the Updated Master Plan will synthesize the plans and strategy laid
out in: a) the 2005 Master Plan; b) the Concession Extension agreement to 2037; c) the
Rebasing Agreements since 2005; and d) the concessionaries’ own Master Plans, Business
Plans and Capex documents. Together, these plans and strategies will provide:
i. A baseline inventory of what S&S systems currently exist;
ii. A description of what is planned with specific focus on S&S systems and services being
proposed for the period 2012 to 2017; and
iii. A comparison of projected S&S systems, including their required infrastructure
investments, with the likely coverage of sewage and septage this will provide (Section
4).
In the process of carrying out the above three points, specific emphasis will be given to
evaluating the concessionaries business and development plans. This will include carrying out,
as necessary, financial and economic analysis of the development plans or its components. The
analysis of these plans will also compare the proposed projects of the two concessionaries
against the targets set out in Section four.
Why: By providing an updated inventory of what systems have been implemented and what has
been planned, we are able to gage to what extend we are on target to achieve the objectives
for the provision of S&S services. This, then, allows DENR and MWSS, MWCI and MWSI to
consider what needs to be done to further reduce pollution levels.
How : The MTSP Team will use a range of available documents to provide a unified inventory of what
has been achieved and planned in terms of S&S systems. The documents will be provided
primarily by MWSS, MWCI and MWSI. The MTSP Team will, were appropriate or necessary,
carry out financial and economic analysis of the development plans or its components.
Who: The MTSP Team will be reliant on MWSS, MWSI and MWCI to provide data. Drawing on this
data the MTSP Team will carry out the analysis for updating the Master Plan.
Section 8: Restate the strategy for the provision of S&S What: Drawing on the 2005 Master Plan, the concessionaries Business Plans and the preceding
analysis in the Updated Master Plan, it is now possible to restate the strategy for the provision
A Proposal for Updating the MWSS Master Plan
14 of 22
of S&S services. The intention here is to focus on the environmental aspect and identify specific parts of the 2005 Master Plan that would benefit from a restating in terms of providing greater focus on reducing pollution loads and identifying the related investments. The restating will also link to components 3 and 4 (innovative financing and market based incentives) of the MTSP Program and being carried out in parallel to this exercise. The following are the key elements in a restated strategy:
i. Restate the broad long term strategy and how the concessionaries’ business plans
should align with the delivery of S&S services for Metro Manila (Chapter 10 in the
Master Plan).
ii. To reduce pollution loads, prioritise what technologies and where they should be
employed.
iii. Re-evaluate, identify and address issues around the use of combined gravity drainage
(stormwater and sewage) system.
iv. Revisit and restate the strategy for encouraging customers to connect to sewerage
systems. Included in the review will be incentives for the concessionaries and the role of
LGU’s and MMDA. The policy recommendations will be tied to MTSP Component 3 and
4 (innovative financing and market based incentives).
v. Revisit and restate the strategy for encouraging customers to use septic tank desludging
services. Include incentives for the concessionaries and the role of LGU’s and MMDA.
The policy recommendations will be tied to MTSP Component 3 and 4 (innovative
financing and market based incentives).
vi. Restate the pricing strategy and policy for S&S (Chapters 11 and 12).
vii. Restate the role and importance of coordination of key agencies. Particular emphasis
will be on the role of LGUs and MMDA working with concessionaries in a combined
Drainage System (i.e. storm drainage and dirty water).
Why: This section and the next are the central parts of the Updated Master Plan. The above seven key elements relate to environmental concerns flagged since the 2005 Master Plan was produced. In restating the strategy for delivery of S&S services we provide DENR, MWSS and the concessionaries with a strategic document for helping to reduce the pollution loads in the Metro Manila river systems and Manila Bay, as well as, improving S&S services.
How: A significant part of the information for this section will come from the analysis carried out in
previous sections of this report. However, it will also need direct input from relevant
stakeholders such as DENR, MWSS, MWCI, MWSI, MMDA etc. The MTSP Team will closely
liaise with these agencies to seek their inputs.
Who: This core element of the Updated Master Plan will require a joint effort and inputs from the
MTSP Team, DENR, MWSS, MWCI, MWSI, MMDA. During the workshop, contact points
A Proposal for Updating the MWSS Master Plan
15 of 22
should be identified from each relevant agency against each of the major points from i to vi
listed in this Section.
Section 9: Priorities and new projects and activities to reduce pollution
loads What: Following on from the previous Section’s restatement of the strategy for the provision of S&S,
Section 9 will prioritise projects and identify specific new projects that should be considered to
reduce the pollution load. These projects and priorities will reflect the foregone analysis in the
Updated Master Plan and the consultation process with key stakeholders. Specifically, the
water quality modelling results for NMTT, San Juan and Paranaque-Las Pinas catchment areas,
plus the action plans formulated by the WQMAs will be used as inputs into the updating of the
Master Plan. Also, the updated Master Plan will incorporate the concessionaries’ development
plans (based on their Business Plans) for sewerage projects by catchment and sub-catchment
areas. The focus of the new and prioritised projects will be on reducing the pollution load and
improving S&S services. Projects may include infrastructure investments, policies, regulatory
frameworks and institutional development etc. For reducing pollution load and improving S&S
services, the Projects will be divided into two categories:
i. Priority and new projects for infrastructure development and capital expenditure.
ii. Priority and new projects that are non-capital expenditure (IEC, policies, initiatives and
regulations etc.).
Why: In order to accelerate the reduction in pollution load and improve services, existing projects
need to be prioritised and were possible new projects identified. This will help inform the next
rate rebasing. It will also provide DENR and MWSS with a consolidated and updated list of
preferred projects for improving S&S services and reducing pollution loads.
How: Prioritisation and possible new projects will be identified through the analysis carried out for
the Updated Master Plan and through a consultative process with DENR, MWSS, and the
concessionaries.
Who: The contact points identified by each of the key agencies in Section 8, can also be the same
person to act as the contact point for Section 9.
A Proposal for Updating the MWSS Master Plan
16 of 22
Draft Outline of Headings for the
Updated Master Plan
As previously mentioned, the proposed chapter outline presented here and intended for the Updated
Master Plan, reflect the nine sections in the above chapter. The following is a brief description of how
the nine chapters fit together. Chapter 1 provides an introduction, background and explanation to the
Master Plan. Chapter 2 provides the background population and land use data. Chapter 3 describes the
existing water quality in Manila and models of how the rivers are affected by various activities. Chapter
4 estimates sewage volumes and forecasts these over the life of the concession agreement. These first
four chapters provide the context essential for considering later the various options.
Chapter 5 examines the existing sewerage technologies and places emphasises on issues related to using
a combined gravity drainage (stormwater and sewage) system. Chapter 6 identifies the standards,
policies and regulations needed to support improvement in S&S services. Chapter 7 identifies and
analyses the gap between the planned S&S inventory and what is needed to meet the required service
targets. These three chapters provide the technical and policy guidance for future plans and programs.
Finally, the last two chapters, informed by the foregone analysis and stakeholder consultation process,
provide the strategic direction for the future. Chapter 8 restates the overall strategy with a specific
emphasis on S&S services, while chapter 9 list priorities and new activities for achieving a reduction in
water pollution to the Metro Manila river systems and improving S&S services to the Metro Manila area.
The following, then, is the proposed chapter outline for selectively updating the Master Plan:
Executive Summary (include summary of recommendations)
Chapter 1: Introduction
Section 1.A: Objectives (reduce pollution, provide input for MWSS etc.)
Section 1.B: Background - Clean Water Act, Supreme court Ruling
Section 1.C: Selected update of the Master Plan – description of why and how
A Proposal for Updating the MWSS Master Plan
17 of 22
Chapter 2: Metro Manila Key Data
Section 2.A: Land Use and Urban Development (Section 1)
Section 2.B: Demographic Trends projected to 2037 (Section 2)
Chapter 3: Metro Manila water quality (Section 3)
Section 3.A: Description of the Metro Manila catchment area and Description of the data
sources
Section 3.B: Pollution loads across the Metro Manila catchment area
Section 3.C: Predicted future loads and results from different interventions proposed
Section 3.D: Implications for S&S planning
Chapter 4: Forecast of sewage volumes (Section 4)
Section 4.A: Current and forecasted sewage loads to 2037
Section 4.B: Forecasted targets for 100% sewage coverage by 2037
Chapter 5: Assessment of sewerage technologies (Section 5)
Section 5.A: Update of technology options
Section 5.B Review of combined system options
Section 5.C Recommendations
Chapter 6: Development of policies, standards, procedures and
institutional arrangements (Section 6)
Section 6.A: Discussion of required policies, standards and procedures
Section 6.B: A proposed management, technical and regulatory framework for septage
management
Section 6C: Discussion of institutional arrangement and cooperation needed for the MP
to succeed
A Proposal for Updating the MWSS Master Plan
18 of 22
Chapter 7: Inventory and associated data on S&S systems (Section 7)
Section 7.A: A baseline inventory of S&S systems
Section 7.B: Summary of the planned sewerage systems for the period 2012 to 2017
Section 7.C: An evaluation of proposed investments for the period 2012 to 2017
Chapter 8: Restating the strategy for the provision of S&S (Section 8)
Section 8.A: Restatement of the broad long term strategy for S&S
Section 8.B: Technology priorities
Section 8.C: Combined gravity drainage (stormwater and sewage) system
Section 8D. Revisit and restate the strategy for encouraging customers to connect to
sewerage systems
Section 8E. Revisit and restate the strategy for encouraging customers to use septic tank
desludging services
Section 8F. Restate the pricing strategy and policy for S&S
Chapter 9: Priorities and new projects and activities to reduce pollution
loads (Section 9)
Section 9A. Priority projects for infrastructure development and capital expenditure
Section 9B. Priority projects for non-capital expenditure projects (IEC, policies and
regulations etc.).
List of Annexes
A Proposal for Updating the MWSS Master Plan
19 of 22
Expected Contributions from Agencies
The quality of the final Updated Master Plan will greatly depend on the contributions made by the
various agencies. For each of the 9 Section and each key agency, one or more contact persons need to
be identified. For some Sections some agencies are not responsible and may not need to nominate a
person. Similarly, an agency may nominate the same person for more than one Section or more than
one person for a section. At the workshop or prior, the MTSP Team will seek commitment from each
key agency to identify one or more relevant contact points. The above table is indicative only and will be
expanded for the workshop to allow various agencies to provide multiple contact points.
Agency Contact point(s) Related Section
DENR, MWSS, MWSI, MWCI etc.
Section 1: Summary of land use status
Section 2: Population and demographic data
Section 3: Metro Manila water quality
Section 4: Forecast of sewage volumes
Section 5: Assessment of sewerage technologies
Section 6: Development of policies, standards and procedures
Section 7: Inventory and associated data on S&S systems
Section 8: Restating the strategy for the provision of S&S
Section 9: Priorities and new projects and activities to reduce pollution loads
A Proposal for Updating the MWSS Master Plan
20 of 22
Attachment 1: Terms of Reference (for international consultant)
Roles and Responsibilities:
1. Provide inputs in updating the MWSS Master Plan outlining information requirements and
information sources. 2. Prepare detailed proposal for updating MWSS Master Plan. 3. Assist the Project Team and involved agencies in updating selected parts of the MWSS
Master Plan. Selection will be done with the Project Team and involved agencies based on relevance.
4. Conduct consultations and workshops with MWSS, DENR, and other pertinent government agencies and offices to develop action plans and investment programs.
5. Provide input on the financial viability of all subcomponent designs, particularly in improving investment conditions in areas covered by the project scope.
6. Provide inputs to the preparation of manual on strategic water management planning where relevant.
7. Lead the following workshops and training: o Workshop on updating the MWSS Master Plan o Workshop on proposed Action Plans and Investment Programs o Training on strategic water management planning
Deliverables:
1. Proposal for updating the MWSS Master Plan 2. Report on the updating of the MWSS Master Plan and on the updated Master Plan with
focus on the selected parts 3. Proposed Action Plans and Investment Programs 4. Reports on results of workshops and training
A Proposal for Updating the MWSS Master Plan
21 of 22
Attachment 2: Main government agencies in Manila involved in
sewerage and sanitation sector
Level of functions Agency Main responsibilities in relation to sewerage and sanitation sector in Metro Manila
Oversight DENR As the lead agency in environmental protection and improvement of water quality in the Manila Bay and its contributing river systems.
DOH As the lead agency in public health management and promotion.
NEDA As the country's economic development and planning agency, NEDA is responsible for the evaluation and approval of sewerage and sanitation projects (including ODA projects).
Imp
lem
enta
tio
n
Sewerage and sanitation service provision
MWSS Provision of sewerage and sanitation services within its service area (Metro Manila) through its concessionaires (MWCI and MWSI).
Supporting service/ infrastructure/ land provision
MMDA Provision and maintenance of drainage systems in Metro Manila; - Provision of solid waste services in Metro Manila.
LGUs Review/approval of sanitation plans for every new house/building prior to construction or issuance of building permit; - Provision of land and access to treatment facilities.
DPWH Provision and maintenance of drainage systems in areas outside Metro Manila.
PRRC Rehabilitation of the Pasig River and its tributaries, including preparation of master plans, coordinating with other implementing agencies, relocation of informal • settlers and abate wastewater discharge to the Pasig River.
Monitoring and enforcement
DENR-EMB
Water quality and discharge/effluent monitoring and enforcement for areas outside LLDA jurisdiction.
LLDA Water quality and discharge/effluent monitoring and enforcement for the Laguna de Bay Region.
DOH Formulation of guidelines and standards for the collection, treatment and disposal of sewage and septage. - Regulation of septic tank desludging companies.
DA Formulation of standards for the reuse of treated sludge for agriculture purposes and its enforcement (in collaboration with DOH).
MMDA Prevention and abatement of solid waste disposals to the drainage systems and control/relocation of informal settlers.
LGUs Enforcement of sewerage/sanitation requirements for all existing/new building and periodic desludging of septic tanks.
PRRC Monitoring of water quality for the Pasig River.
A Proposal for Updating the MWSS Master Plan
22 of 22
Attachment 3: Local Government Units within the Project Boundaries
1. Caloocan City
2. City of Manila
3. Las Piñas City
4. Makati City
5. Malabon City
6. Mandaluyong City
7. Marikina City
8. Municipality of Navotas
9. Municipality of Pateros
10. Municipality of San Juan
11. Muntinlupa City
12. Paranaque City
13. Pasay City
14. Pasig City
15. Quezon City
16. Taguig City
17. Valenzuela City
Local Government Units