    Background

    Passage of Proposition A provides necrevenue to restore service in St. Louand City of St. Louis

    Service enhancement and ex ansion frestoration

    FrequencyGeo ra hic covera e and Call-A-Ride acc

    April 16, 2010 M

    Some route re-design

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    3/19

    Impacts of Service Reduction

    MetroBus service initially reduced by o55% of reduced service restored August 3

    Ridership lost 21.1%

    MetroLink service reduced b one-fifthRidership loss 10.6%

    - -

    Conditions of eligibility enforced

    April 16, 2010 M

    Ridership loss 23.4%

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    4/19

    Vehicle Availability

    Two bus orders cancelled in 2008

    36 40-foot CNG buses retired March 30, 216 40-foot buses transferred to IL for SCCincrease in November 2009

    26 additional buses retired from fleet since

    50 buses available in Metros contingeservice restoration

    April 16, 2010 M

    e-ac va on o con ngency ee ages e

    25-50 additional buses needed for full rest

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    5/19

    Vehicle Availability

    Management and bus manufacturer wtogether to create opportunities for abuilds

    Existing contract could provide additional 4e ro

    Some options available for Metro to take ofrom other cities

    Metro will soon have the ability to obta

    April 16, 2010 M

    replacement program.

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    6/19

    Staff AvailabilityReductions on March 30, 2009 resulte

    significant layoffs of personnel requi

    All remaining laid-off operators recalledres ora on

    Some operators lost through attrition

    Approximately 120 operators required

    April 16, 2010 MFirst class of 40 operators begins in late A

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    7/19

    R il in

    April 16, 2010 M

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    8/19

    Service Restoration Approach

    Create the most effective service plan re ions diverse transit markets withprovided

    Incrementally address problems with servi

    Meet existing needs while providing opporrowth

    Restoration implemented across at lea

    April 16, 2010 M

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    9/19

    Sustaining Service

    Without a new source of revenue, Metservice would have been si nificantl2010

    All routes would have been significantly re

    Some routes would have been eliminated,

    #8 Bates Macklind #99 Downtown Circ

    #66 Clayton Airport

    #40X I-55 Mehlville Express

    #410 Eureka Expre

    April 16, 2010 M

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    10/19

    Service Restoration Plan

    Phase I (June 28, 2010)

    re-routingMetroLink # 70 Granda - - e

    # 11 Chippewa

    #34 Earth City

    # 90 ampton

    # 95 Kingshighway

    # 99 Downtown Circu

    # 49 North Lindbergh

    #58 Clayton Ballas

    #210 Fenton Gravois

    #240X Bissell Hills Ex

    -

    April 16, 2010 M

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    11/19

    Service Restoration Plan

    Phase II (September 6, 2010)

    route split# 10 Gravois-Lindell #47 North Ha#32 . . ng- outeau #57 anc es

    #34 Earth City # 61 Chambe

    #35 Rock Road Mills # 73 Caronde

    # 40 Broadway

    #44 Hazelwood

    #45 Fer uson Florissant

    April 16, 2010 M

    #47 North Hanley

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    12/19

    Service Restoration Plan

    Phase III (November 29, 2010)

    #1 Gold# 18 Taylor

    # 60 Midland

    April 16, 2010 M

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    13/19

    Restoration and the Elderly and Disabled

    Options currently under review:

    boundary with service offered at a higher rcurrent $4 ADA fare

    pp y ng a por on o e ropos on un sfares for all trips outside the -mile bound

    These fares would be mileage based, but lowcurrent rates that have proven to inhibit mobili

    significant portion of the disabled population

    April 16, 2010 M

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    14/19

    Community Engagement

    Engaging the community in Metros plarocess is essential for creatin effe

    and generating public support

    The level of engagement in the long-range

    Draft service restoration plan details wava a e o e pu c o ay

    Public meetings begin April 27

    April 16, 2010 M

    e-mail, hotline, and postal mail

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    15/19

    Community Engagement Opportunities

    April 27, 5:30 7:30 PM May 4, 5:30 7:30 PM

    Mehlville High School St. Louis Community Colle

    Library at Florissant Valley Multi-P

    3200 Lemay Ferry Road 3400 Pershall Road

    St. Louis, MO 63125 St. Louis, MO 63135

    , ,

    Riverview Transit Center Ballas Transit Center

    9000 Riverview Blvd. 790 S. Ballas Rd.

    St. Louis, MO 63147 St. Louis, MO 63141

    May 7, 12:00 1:30 PMSt. Louis City Hall, Kenned

    1200 North Tucker Blvd.

    April 16, 2010 M

    St. Louis, MO 63102

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    16/19

    Moving Beyond Service Restoration

    System productivity continually monito

    needed

    -

    Planning for BRT and light rail to be led byGateway with collaboration from Metro

    Additional passenger amenity and enhancprogram planning

    April 16, 2010 M

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    17/19

    MetroLink Rushhourfrequencywillbeimprovedfrom15minutesto12minutes,providing6

    minuteservicebetweenForestParkDeBaliviereStationandFairviewHeightsStation.

    CallARide

    Metroisconsideringoptionsforeitherexpandingthecurrent3/4mileADAservice

    area,or

    creating

    asecondary

    service

    area

    in

    which

    service

    would

    be

    offered

    at

    ahigher

    ratethanthecurrent$4ADAfare.Faresinthesecondaryareawouldbemileage

    based,butlowerthancurrentnonADAratesthathaveproventoinhibitmobility

    optionsforasignificantportionofthedisabledpopulation.

    #11Chippewa Weekdaydaytimeserviceimprovementfrom30minutesto20minutes.

    #34EarthCityWeekdaymorningservicewillbeimprovedfrom30minutesto20minutes. Afternoon

    servicewillbeimprovedfrom40minutesto30minutes.

    #48SouthLindbergh

    NewroutewillprovideservicebetweenBallasTransitCenter,SouthCountyMalland

    Veteran'sHospital. Thisroutewillreplacethesouthernportionofservicecurrently

    providedby#49Lindbergh.

    #49NorthLindbergh

    NewroutewillprovideservicebetweenBallasTransitCenterandNorthHanley

    MetroLinkStation. Thisroutewillreplacethenorthernportionofservicecurrently

    providedby#49Lindbergh.

    #58ClaytonBallasServicewillbeprovidedbetweenClaytonandBallasTransitCenter. Servicewestof

    Ballaswillbeprovidedbythenew#158HospitalConnector.

    #64LucasHunt Rushhourserviceimprovementsfrom1hourto30minutes.

    #70Grand Weekdayfrequencywillbeimprovedfrom12minutesto10minutes.

    #90HamptonFrequencyimprovementswillbeprovided. RoutewillnolongerserveForestPark

    duringthehoursthatnewForestParkCirculatorisoperating.

    #95KingshighwayRushhourfrequencywillbeimprovedfrom20minutesto15minutes;middayservice

    improvedfrom30minutesto20minutes.

    #99DowntownCirculator RoutingwillbechangedtoprovidebetterservicetoCityMuseumandWashingtonAvenue.

    #158HospitalConnector

    NewroutewillprovideservicetoMaryvilleUniversityandhospitalsbetweenBallas

    TransitCenterandChesterfield. ThisroutewillreplaceservicewestofBallascurrently

    providedby#58ClaytonBallas.

    #210FentonGravoisBluffsRoutewillprovideservicebetweenShrewsbury MetroLinkStationandI270at

    Gravois. ThenewroutewilloperateviaMackenzieRoadandGravois.

    #240XBissellHills Routewillberenamed#274XBissellHills.

    ForestParkCirculator ServicethroughForestParkwillbeginMemorialDayWeekend.

    ProposedServiceRestorationPhaseOne:June28,2010Preliminary Metro Service Restoration Plan

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    18/19

    #10GravoisLindell RushhourservicetoHeegeRoadwillbeprovidedbynewshuttle.

    #32M.L.KingChouteau

    NewroutewillprovideservicebetweenRockRoad,CivicCenter,andMaplewood

    MetroLinkStationsviaSt.CharlesRockRoadandChouteau/Manchester. Servicealong

    St.CharlesRockRoadwestofRockRoadMetroLinkStationwillbeprovidedbynew

    #35RockRoadMills. ServiceonManchesterwestofMaplewoodMetroLinkStation

    willbeprovidedbyrerouted#57Manchester.

    #34

    Earth

    City Line

    will

    be

    rerouted

    to

    service

    only

    Earth

    City,

    Riverport,

    and

    Harrah's

    Casino.

    #35RockRoadMills

    NewroutewillprovideservicewestofRockRoadMetroLinkStation,serving

    destinationssuchasDePaulHospital,Macy'sCallCenter,andSt.LouisMills,

    terminatingatNorthHanleyMetroLinkStation.

    #36SpanishLake LinewillbereroutedtoserveTrampeAvenue.

    #40BroadwayLinewillbereroutedtoserveConventionCenterMetroLinkStationviaBroadwayand

    4thStreet.

    #44Hazelwood

    Newroutewillreplaceservicecurrentlyprovidedby#45HazelwoodFergusonand#74

    FlorissantviaLindbergh,Shackleford,Patterson,andNewHallsFerrytoFlorissant

    ValleyCommunityCollege.

    #45

    Ferguson

    Florissant

    Thecurrent#45willbereroutedviaFlorissantRoad,Waterford,andDunnRoadto

    FlorissantValley

    Community

    College.

    #47NorthHanleyLinewillbereroutedtoprovideservicetoHallsFerry,Lindbergh,andWashington.

    #57Manchester

    ServicewillbeprovidedalongManchesterwestofMaplewoodMetroLinkStationto

    Wildwood,andreroutednorthalongClarkson,eastalongClaytonRoadtoBallas

    TransitCenter. ServiceeastofMaplewoodMetroLinkStationwillbeprovidedbynew

    #32M.L.KingChouteau.

    #61ChambersRoad Rushhourservicewillbeadded.

    #73CarondeletLinewillbereroutedtoserve12thStreetbetweenArsenalandCivicCenterMetroLink

    Station.

    #74Florissant

    RoutewillprovideservicebetweenFlorissantValleyCommunityCollegeandCivic

    Center;servicenorthandwestofFlorissantValleywillbeprovidedbyrealigned#44

    and#45.

    ProposedServiceRestorationPhaseTwo:September6,2010

  • 8/9/2019 Metro Transit Restoration 2010 Presented 04 16 10

    19/19

    #1Gold AlltripswillserveClaytonTransitCenter.

    #18Taylor Rushhourserviceimprovements.

    #56KirkwoodWebsterServicewillbeextendedtoDesPeresHospitalandMeramecCommunityCollege.

    #60MidlandRushhourservicebetweenBigBendMetroLinkStationandSt.CharlesRockRoad.

    ProposedServiceRestorationPhaseThree:November29,2010