Board Workshop July 26, 2018 METRONext Vision & Moving Forward Plans DRAFT 07.26.2018 - For Preliminary Discussion Only

Transcript of METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg...

Page 1: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Board WorkshopJuly 26, 2018

METRONext

Vision & Moving Forward Plans

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 2: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Disclaimer

2

This presentation is being provided solely for preliminary discussion purposes by the Board of Directors of the Metropolitan Transit Authority of Harris County, Texas (METRO) during a workshop session on July 26, 2018. It includes draft alternative transit plans, which utilize a range of modes of transportation based on different funding scenarios, including a draft long-term plan that provides a vision of future transit in the service area assuming unconstrained financial resources. The draft plans are based on various financial estimates, economic forecasts and other assumptions, which are subject to change. As a result, the final proposed plan could differ materially. Additionally, any proposed plan or project conducted by METRO is subject to certain approvals and authorization, including approval by the METRO Board of Directors.

METRO makes no claim, promise or guarantee of any kind, including with respect to the feasibility or future implementation of any proposed plans or projects discussed herein.

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 3: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

› Overview of METRONextprocess

› Presentation of Draft Vision & Moving Forward Plans

› Financial Forecast

› Next Steps

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 4: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Why METRONext? A Critical Plan for a Dynamic, Changing Region

4

› A bold, transformative vision

› Support a more resilient Houston region

› First major capital planning effort since

METRO Solutions 2003

› Regional transit framework

› Build on success of New Bus Network

and light rail expansion

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 5: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Project Milestones

5DRAFT 07.26.2018 - For Preliminary Discussion Only

We are here

Page 6: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Inputs to the Vision Development

6

Board & Executive

Leadership Team

Community & Stakeholder Input

Existing Conditions Assessment &

Technical Analysis

Agency Partners & Technical

Stakeholders

Vision

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 7: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Board Goals and Priorities

7DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 8: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

8

Public Involvement

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 9: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

• Connections

› Better serve major activity centers› Connect airports› Link region to jobs, education, and

services› Expand commuter network› New Transit Oriented Development

(TOD) hubs» Retail, residential, and employment

development at transit hubs

Community Stakeholders: Four Emerging Themes

9DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 10: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

• Speed and Reliability

› Exclusive right-of-way for transit

› Expanded two-way HOV/HOT and all-day service

› Rail and BRT expansion

› Traffic signal priority for transit vehicles

› Bus stop improvements and optimization

» Stop consolidation, access improvements, and far side stops

Community Stakeholders: Four Emerging Themes

10DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 11: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

• Customer Experience

› Safe, clean, accessible & attractive facilities

› First/last mile access› More & better shelters› Real-time passenger information› Safety improvements

Community Stakeholders: Four Emerging Themes

11DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 12: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

• Innovation

› New and emerging technologies › Autonomous vehicles› Transportation Network Company

(TNC) integration› Mobile applications and tools

Community Stakeholders: Four Emerging Themes

12DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 13: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

• Technical Stakeholders Advisory Committee

• Potential Implementation Partners› TxDOT› City of Houston› Harris County› Multi-cities› H-GAC› Others

Coordination with Regional Partners

13DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 14: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Technical Analysis

14

Major Investment Corridors

Development Density

Travel Patterns

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 15: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

The METRONextLong-TermVision Plan

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 16: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

16

METRONextLong-TermVision Plan

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 17: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Building the METRONextLong-Term Vision

17

Regional Express

Core Rapid: LRT

Core Rapid: BRT

BOOST Corridors

Bus SystemEnhancements

VISION

Existing Network

17

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 18: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Core Rapid Transit: LRT› Fast and reliable

network backbone

› Extends the existing Red, Green, and Purple Lines

› Focused on dense, higher-ridership corridors, and key destinations

› Connects major destinations including airports

› Provides Downtown-NWTC link

18METRONext Vision Plan

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 19: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

19

Core Rapid Transit: BRT› Serves dense, high-

ridership corridors, and key destinations, especially in the Southwest area

› Allows multiple routes to use the same busway

› Integrates with HOV/HOT lanes

METRONext Vision Plan

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 20: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

20

BOOST Network(Bus Operations Optimized System Treatments)

› Improves speed and reliability on high frequency, high ridership bus routes

› Toolbox includes:» Transit signal priority» Stop optimization/

relocation » New shelters » Access improvements» Queue jumps - transit

vehicle moves through intersection first

» Bus-only lanes» Enhanced passenger

information

METRONext Vision Plan

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 21: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

21

Local Bus System Enhancements› Improvements

identified on nearly every existing route

› New routes and expanded coverage

› Enhances frequency, span, and route alignments

› Expands late-night service

› Improves connectivity

› Fast to implement

METRONext Vision Plan

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 22: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

22

Regional Express(Park & Rides)

› Fast regional trips between activity centers and major destinations

› All-day, all-week service, including weekends

› Utilizes expanded two-way HOV/HOT

› Expands commuter service to new destinations

METRONext Vision Plan

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 23: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Customer Experience

23

First/Last MileUniversal Accessibility Safety

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 24: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Customer Experience

24

Transit Oriented Development Fleet and FacilitiesResiliency

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 25: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

25

Major Activity Centers’ Operations and System Improvements

Rail Capacity and OperationsBus Operations

Programs

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 26: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

26

PartnershipOpportunities› Partner projects

serving major destinations outside METRO service area

› Assumes partnership commitment from an outside entity

› High Capacity Transit Task Force integration

METRONext Vision Plan

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 27: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

27

The METRONextLong-TermVision Plan

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 28: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Vision Plan Investments

28

Fleet & Operational Investments:

200 mi

100 mi

90 mi

Service & Access Improvements:

211

448

New light rail vehiclesTwo-way HOV

Extended LRT lines

New BRT system

New buses

Major Investments:

PARTNERSHIP PROJECTS

NEW SERVICE

BOOST Network500 mi

BOOST corridors33

IMPROVED BUS SERVICE AND BUS STOPS

UNIVERSAL ACCESSIBILITY

RESILIENCY PLANNING

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 29: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Key Long-Term Vision Plan Benefits

29

Delivers faster, more reliable connections

Access for 440% more low-income households to LRT/BRT network; improved service for all Complete Communities

New two-way Regional Express Network

460% increase in people served and 120% increase in employment covered within ½ mile of LRT/BRT network

Speed, reliability and access improvements

Expanded late-night service

More Bus Shelters with Better Access

Innovate with new technologies in vehicles and passenger communications

29DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 30: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Applying Financial Assumptions

30DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 31: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Key Assumptions & Conclusion

31

Key Financial Assumptions:

Conclusion:

• No increase in sales tax rate (remains 8.25%) and no property tax increase• Net Sales Tax Revenues available to METRO are based on the annual growth rates (FY2019 – FY2040)

formulated by Dr. Robert W. Gilmer, University of Houston – C.T. Bauer College of Business as of June 2018• General Mobility Program continues through 2040• Bus and Light Rail infrastructure projects are financed using 45% debt/55% grant funds• Bus system enhancements and optimization projects are financed using debt and local funds• Forecasted expenditures include operating and maintenance costs for all METRONext projects• METRO’s Board approved cash reserve requirements (25% of operating expenses plus $10MM) are met

Under the above financial constraints, approximately 3 -8 percent of the $35 billion in METRONextVision Projects can be completed during the FY2019 through FY2040 period.

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 32: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

METRONext

Moving Forward Plan A

DRAFT 07.26.2018 - For Preliminary Discussion Only 32

Page 33: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Forward Plan

Plan A

LRT Extensions› Red Line to Hobby Airport › Purple Line to Bellfort/Hobby Airport › Red Line North to Tidwell

BRT› University BRT › Inner Katy BRT› Uptown BRT Extension

BOOST Network› 10 Corridors

Bus Network Improvements› Route improvements including 4

Community Connectors

› Universal Accessibility

Regional Express› IH 45 from Downtown to

Greenspoint and IAH

Facilities› Fairfield Park & Ride › Gulfton Transit Center › Tidwell/Fulton Transit Center › 3 Vanpool lots

33

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 34: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

34

Service & Access Improvements:

12 mi Extended LRT

34 mi New BRT

174 mi BOOST Network

Park & Rides, Transit Centers3

4 Community Connectors

DRAFT 07.26.2018 - For Preliminary Discussion Only

Moving Forward Plan A

RESILIENCY PLANNING

UNIVERSAL ACCESSIBILITY

PARTNERSHIP PROJECTS

IMPROVED BUS SERVICE AND BUS STOPS

Increase in Bus Service10%

Highlights and Benefits

Page 35: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

METRONext

Moving Forward Plan B

DRAFT 07.26.2018 - For Preliminary Discussion Only 35

Page 36: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Forward Plan

Plan BLRT Extensions› Red Line North to Tidwell with

new Transit Center

BRT› Inner Katy BRT› Uptown BRT Extension

BOOST Network› 10 corridors

Bus Network Improvements› Route improvements including 4

Community Connectors

› Universal Accessibility

Regional Express› IH 45 from Downtown to

Greenspoint and IAH Airport

Partnership Projects› Expansion of Two-way HOV

Network

36

DRAFT 07.26.2018 - For Preliminary Discussion Only

Page 37: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Increase in Bus Service

Moving Forward Plan B

37

Service & Access Improvements

RESILIENCY PLANNING

UNIVERSAL ACCESSIBILITY

1 mi Extended LRT

174 mi BOOST Network

Transit Center1

10%

4 Community Connectors

PARTNERSHIP PROJECTS

Highlights and Benefits

IMPROVED BUS SERVICE AND BUS STOPS

DRAFT 07.26.2018 - For Preliminary Discussion Only

11 mi New BRT

Page 38: METRO Next Vision v11 07252018 FINAL · %xv 2shudwlrqv 2swlpl]hg 6\vwhp 7uhdwphqwv ¾,psuryhv vshhg dqg uholdelolw\ rq kljk iuhtxhqf\ kljk ulghuvkls exv urxwhv ¾7rroer[ lqfoxghv

Next Steps

38DRAFT 07.26.2018 - For Preliminary Discussion Only