S.no Description Type of material Code
1 Fire Addressable system
Main alaram panel
cabinet fabrication 2mm thick
electrogalvanized steel sheet, epoxy
powder coated (signal red in colour to BS
381c requirements) to a minimum
thickness of 60 microns.cabinet shall be
fitted with a lockable glass panel door.
BS EN 5889 & BS
EN 54 part 2 &
part4
2 Fire fighting system
wet main system Pipe Galvanized steel BS EN:10255:2004
FM 200 system MS seamless pipe
ASTM A 106 Gr. B
schedule 40
pecifications:
-
7/29/2019 Metro Material
2/13
FM-200 System Testing of fire suppression is too expensive ? For FM200 testing, Gas release is not requir
demonstrated during testing. However, the entire
process of cross zoning needs to be demonstrated
with electrical actuator getting active when fire
condition is met. In this process, if there is releaseof gas due to negligence or defect, the cost of
refilling will be borne by the vendor.
-
7/29/2019 Metro Material
3/13
ed to be
-
7/29/2019 Metro Material
4/13
Street light pole -GI
outside building box -galvanized cast iron or impact resistance molded plastic enclosures providing the
-
7/29/2019 Metro Material
5/13
inimum degree of protection of IP54.
-
7/29/2019 Metro Material
6/13
1 Vent Pipe( inside building )- Galvanized Steel Pipe Class B conforming to BSI Standard
2 Rain water pipes (inside building) - galvanized steel pipes medium weight, conforming to BSI
-
7/29/2019 Metro Material
7/13
and IS Standard
-
7/29/2019 Metro Material
8/13
Sl. No. Description Unit
Qty for
One
Station
Nos Of
Stations
TOTAL FOR FIRE HYDRANT SYSTEM
III PIPING WORKS FOR FIRE FIGHTING SYSTEM
1
Supply, Installation, Testing & Commissioning of G.I.
pipe conforming to IS : 1239/3589 (heavy class) with
mechanical groove coupling/ screw fittings (for pipe
size 80 mm and above and screw fitting for pipe size
65mm and below) including cutting, making grooves,
screwing, providing all required necessary fittings
(grooved/screw) like bends, elbows reducers etc,
clamps, hangers, supports, cutting holes in brick or
RCC walls/slabs and making good the same
complete, painting with one coat of primer and two ormore coats of synthetic enamel paint of approved
make and shade.
a) 15 mm dia RM 6 8
b) 20 mm dia RM 20 8
c) 25 mm dia RM 195 8
d) 32 mm dia RM 50 8
e) 40 mm dia RM 130 8
f) 50 mm dia RM 26 8
g) 65 mm dia RM 15 8
h) 80 mm dia RM 75 8i) 100 mm dia RM 145 8
j) 150 mm dia RM 2415 8
k) 200 mm dia RM 6 8
2
Supply, Installation, Testing & Commissioning of
Underground G.I. pipe conforming to IS : 1239/3589
(heavy class) with mechanical groove fittings viz.
tees elbow, bends, flanges, reducers. etc including
excavation (upto 1.5M deep), rubble soling, sand
filling, back-filling with excavated earth, removal of
surplus soil and providing anti-corrosive treatment
with 'Pypkote' as per I.S : 10221 complete asrequired.
a) 80 mm dia RM 6 8
b) 100 mm dia RM 10 8
c) 150 mm dia RM 30 8
VI GAS GLOODING SYSTEM
BILL OF QUANTITIES
FIRE FIGHTING SYSTEMS
TOTAL FOR AUTOMATIC SPRINKLER
-
7/29/2019 Metro Material
9/13
The Inert Gas Flooding System, all equipments,
Instruments, Gas containers, Gas etc. specified
herein, must comply with the requirements of NFPA -
2001, in addtion to the description given in respective
items of BOQ,
All the items / parts not specifically mentioned here in
BOQ but necessary to make the system complete
and to conform to NFPA-2001 shall be deemed to be
included in the quoted rates, unless specifically
excluded.
1
Design, Supply, Installation and Testing of Gas
flooding system based on Clean gas (Novec 1230)
for Fire protection of following rooms.The system
shall be designed at minimum design concentration of
4.2% but less than NOAEL of 10% as per NFPA2001
and consist of gas cylinders of 67/80 liters filled with
Novec 1230 at 42 bar.
The system must designed accordance with NFPA
2001. The price shall include cylinder, gas filled (at
min. design concentration) piping, required nos. of
discharge nozzles, dedicated fire alarm system to
activate the system, control panel with manual
discharge and abort switches, safety signs, interface
with SCADA and all other accessories and saftey
features.
a)
Singelling Equipment room, C01 (appro.volume 175
cu.m. including void volume between false & true
ceiling and volume between false & true floor) Set 1 8
b)
Communication Equipment room, C03 (appro.volume
250 cu.m. including void volume between false & true
ceiling and volume between false & true floor)Set 1 8
c)
Communication Equipment room, C04 (appro.volume
125 cu.m. including void volume between false & true
ceiling and volume between false & true floor)Set 1 8
d)
Communication Equipment room, C06 (appro.volume
230 cu.m. including void volume between false & trueceiling and volume between false & true floor)
Set 1 8
e)
Telecommunication/ Signelling Maintenance room,
C07 (appro.volome 40 cu.m. including void volume
between false & true ceiling and volume between
false & true floor)
Set 1 8
f)33 kv switch gear room, P01 (appro.volome 550
cu.m.)Set 1 8
-
7/29/2019 Metro Material
10/13
g)LV switch gear room, P02 (appro.volome 550 cu.m.)
Set 1 8
h)Main switch gear room, P07 (appro.volome 250
cu.m.)Set 1 8
i) Traction room, P08 (appro.volome 550 cu.m.) Set 1 8
2
Design, Supply, Installation , Testing and
Commissioning of Clean gas (Novec 1230) bases
Fire protection (with min gas concentration 4.2 %) of
Electrical Panels by gas flooding within the Panels
a) Secure Suite, A-01 Set 1 8
b) Signelling Control Panel (in C02) Set 1 8
c) Tele-Com Closet (C08) Set 1 8
GAS FLOODING SYSTEM
-
7/29/2019 Metro Material
11/13
Total Qty
48
160
1560
400
1040
208
120
6001160
19320
48
48
80
240
SYSTEM
-
7/29/2019 Metro Material
12/13
8
8
8
8
8
8
-
7/29/2019 Metro Material