    S.no Description Type of material Code

    1 Fire Addressable system

    Main alaram panel

    cabinet fabrication 2mm thick

    electrogalvanized steel sheet, epoxy

    powder coated (signal red in colour to BS

    381c requirements) to a minimum

    thickness of 60 microns.cabinet shall be

    fitted with a lockable glass panel door.

    BS EN 5889 & BS

    EN 54 part 2 &

    part4

    2 Fire fighting system

    wet main system Pipe Galvanized steel BS EN:10255:2004

    FM 200 system MS seamless pipe

    ASTM A 106 Gr. B

    schedule 40

    pecifications:

  • 7/29/2019 Metro Material

    2/13

    FM-200 System Testing of fire suppression is too expensive ? For FM200 testing, Gas release is not requir

    demonstrated during testing. However, the entire

    process of cross zoning needs to be demonstrated

    with electrical actuator getting active when fire

    condition is met. In this process, if there is releaseof gas due to negligence or defect, the cost of

    refilling will be borne by the vendor.

  • 7/29/2019 Metro Material

    3/13

    ed to be

  • 7/29/2019 Metro Material

    4/13

    Street light pole -GI

    outside building box -galvanized cast iron or impact resistance molded plastic enclosures providing the

  • 7/29/2019 Metro Material

    5/13

    inimum degree of protection of IP54.

  • 7/29/2019 Metro Material

    6/13

    1 Vent Pipe( inside building )- Galvanized Steel Pipe Class B conforming to BSI Standard

    2 Rain water pipes (inside building) - galvanized steel pipes medium weight, conforming to BSI

  • 7/29/2019 Metro Material

    7/13

    and IS Standard

  • 7/29/2019 Metro Material

    8/13

    Sl. No. Description Unit

    Qty for

    One

    Station

    Nos Of

    Stations

    TOTAL FOR FIRE HYDRANT SYSTEM

    III PIPING WORKS FOR FIRE FIGHTING SYSTEM

    1

    Supply, Installation, Testing & Commissioning of G.I.

    pipe conforming to IS : 1239/3589 (heavy class) with

    mechanical groove coupling/ screw fittings (for pipe

    size 80 mm and above and screw fitting for pipe size

    65mm and below) including cutting, making grooves,

    screwing, providing all required necessary fittings

    (grooved/screw) like bends, elbows reducers etc,

    clamps, hangers, supports, cutting holes in brick or

    RCC walls/slabs and making good the same

    complete, painting with one coat of primer and two ormore coats of synthetic enamel paint of approved

    make and shade.

    a) 15 mm dia RM 6 8

    b) 20 mm dia RM 20 8

    c) 25 mm dia RM 195 8

    d) 32 mm dia RM 50 8

    e) 40 mm dia RM 130 8

    f) 50 mm dia RM 26 8

    g) 65 mm dia RM 15 8

    h) 80 mm dia RM 75 8i) 100 mm dia RM 145 8

    j) 150 mm dia RM 2415 8

    k) 200 mm dia RM 6 8

    2

    Supply, Installation, Testing & Commissioning of

    Underground G.I. pipe conforming to IS : 1239/3589

    (heavy class) with mechanical groove fittings viz.

    tees elbow, bends, flanges, reducers. etc including

    excavation (upto 1.5M deep), rubble soling, sand

    filling, back-filling with excavated earth, removal of

    surplus soil and providing anti-corrosive treatment

    with 'Pypkote' as per I.S : 10221 complete asrequired.

    a) 80 mm dia RM 6 8

    b) 100 mm dia RM 10 8

    c) 150 mm dia RM 30 8

    VI GAS GLOODING SYSTEM

    BILL OF QUANTITIES

    FIRE FIGHTING SYSTEMS

    TOTAL FOR AUTOMATIC SPRINKLER

  • 7/29/2019 Metro Material

    9/13

    The Inert Gas Flooding System, all equipments,

    Instruments, Gas containers, Gas etc. specified

    herein, must comply with the requirements of NFPA -

    2001, in addtion to the description given in respective

    items of BOQ,

    All the items / parts not specifically mentioned here in

    BOQ but necessary to make the system complete

    and to conform to NFPA-2001 shall be deemed to be

    included in the quoted rates, unless specifically

    excluded.

    1

    Design, Supply, Installation and Testing of Gas

    flooding system based on Clean gas (Novec 1230)

    for Fire protection of following rooms.The system

    shall be designed at minimum design concentration of

    4.2% but less than NOAEL of 10% as per NFPA2001

    and consist of gas cylinders of 67/80 liters filled with

    Novec 1230 at 42 bar.

    The system must designed accordance with NFPA

    2001. The price shall include cylinder, gas filled (at

    min. design concentration) piping, required nos. of

    discharge nozzles, dedicated fire alarm system to

    activate the system, control panel with manual

    discharge and abort switches, safety signs, interface

    with SCADA and all other accessories and saftey

    features.

    a)

    Singelling Equipment room, C01 (appro.volume 175

    cu.m. including void volume between false & true

    ceiling and volume between false & true floor) Set 1 8

    b)

    Communication Equipment room, C03 (appro.volume

    250 cu.m. including void volume between false & true

    ceiling and volume between false & true floor)Set 1 8

    c)

    Communication Equipment room, C04 (appro.volume

    125 cu.m. including void volume between false & true

    ceiling and volume between false & true floor)Set 1 8

    d)

    Communication Equipment room, C06 (appro.volume

    230 cu.m. including void volume between false & trueceiling and volume between false & true floor)

    Set 1 8

    e)

    Telecommunication/ Signelling Maintenance room,

    C07 (appro.volome 40 cu.m. including void volume

    between false & true ceiling and volume between

    false & true floor)

    Set 1 8

    f)33 kv switch gear room, P01 (appro.volome 550

    cu.m.)Set 1 8

  • 7/29/2019 Metro Material

    10/13

    g)LV switch gear room, P02 (appro.volome 550 cu.m.)

    Set 1 8

    h)Main switch gear room, P07 (appro.volome 250

    cu.m.)Set 1 8

    i) Traction room, P08 (appro.volome 550 cu.m.) Set 1 8

    2

    Design, Supply, Installation , Testing and

    Commissioning of Clean gas (Novec 1230) bases

    Fire protection (with min gas concentration 4.2 %) of

    Electrical Panels by gas flooding within the Panels

    a) Secure Suite, A-01 Set 1 8

    b) Signelling Control Panel (in C02) Set 1 8

    c) Tele-Com Closet (C08) Set 1 8

    GAS FLOODING SYSTEM

  • 7/29/2019 Metro Material

    11/13

    Total Qty

    48

    160

    1560

    400

    1040

    208

    120

    6001160

    19320

    48

    48

    80

    240

    SYSTEM

  • 7/29/2019 Metro Material

    12/13

    8

    8

    8

    8

    8

    8

  • 7/29/2019 Metro Material

    13/13

    8

    8

    8

    8

    8

    8