A City of Edmonton graphic outlining predicted traffic delays associated with the opening of the new Metro LRT Line to NAIT.
Transcript of Metro Line traffic delays
KINGSWAY
105 STREET
106 STREET
104 STREET
Attachment 1: Duration of Traffic Impacts
105 AVENUE
106 AVENUE
107 AVENUE
111 AVENUE
PRINCESS ELIZABETH AVENUE
4 MINUTES (Traffic Signals Red)
4 MINUTES (Traffic Signals Red)
2 MINUTES (Traffic Signals Red)
2 MINUTES (Traffic Signals Red)
2 MINUTES (Traffic Signals Red)
12 to 16 minute wait time at peak hours. 3 to 4 signal cycles.
12 to 16 minute wait time at peak hours. 3 to 4 signal cycles.
2 to 4 minute wait time at peak hours. 1 to 2 signal cycles.
2 to 4 minute wait time at peak hours. 1 to 2 signal cycles.
2 to 4 minute wait time at peak hours. 1 to 2 signal cycles.