    Basics of Signalling

    Methods of Block Working

  • 8/14/2019 Methods of Block Working

    2/19

    Key Statistics

    Route Kms : 63,028

    Number of Stations : 6,853

    Passenger Kms : 457,022m

    Tonne Kms : 312,371m

    Employees : 1,545.3m Revenue :Rs. 348,805m

    Expenditure :Rs. 346,673m

    Up-to 31.3.2001

  • 8/14/2019 Methods of Block Working

    3/19

    Systems of working

    Chapter VII of GR describes the Systems of

    working.

    Systems of working: The Absolute Block System,

    The Automatic Block System,

    The Following Trains System,

    The Pilot Guard System,

    The Train-staff and Ticket System, and

    The One Train Only System.

  • 8/14/2019 Methods of Block Working

    4/19

    Systems of working

    The Following Trains System

    Trains are despatched from one station to the next in

    succession in the same direction on the same line, witha time interval

    Station Master of next station will ensure that no train

    leaves his station towards the station in rear until all

    trains have reached his station and a fresh Direction of

    Traffic has been esteblished

    All trains should run at the same speed not exceeding

    25 kmph

  • 8/14/2019 Methods of Block Working

    5/19

    Systems of working

    The Pilot Guard System

    Trains are piloted by the Pilot Guard who shall travel

    on the foot plate of the EngineNo train shall leave a stationwithout the Pilot Guard

    All trains should run at the same speed not exceeding

    25 kmph and with a time interval of minimum 15

    minutes

  • 8/14/2019 Methods of Block Working

    6/19

    Systems of working

    The Train-Staff and Ticket System

    Trains may be worked under this system between two

    stations a single Train-Staff shall be kept at one of the stations

    Train shall not start from a station unless the Train-

    Staff has been handed over or shown to the driver

    Driver must be in possession of either Train-Staff orTrain-Staff Ticket

    All trains should run at the same speed not exceeding

    25 kmph and with a time interval of minimum 15

    minutes

  • 8/14/2019 Methods of Block Working

    7/19

    Systems of working

    The One Train Only System

    Trains may be worked under this system on short

    terminal branch lines on single line Only one Train shall work in the section, at any time

    If the train becomes disabled and requires assistance,

    the same will be arranged by the Station Master of the

    Base Station, after observing laid down precautions Guard of the disabled train will be responsible for safe

    working till normal working is restored

  • 8/14/2019 Methods of Block Working

    8/19

    The Absolute Block System

    Essentials:

    No train shall leave a Block Station unless LC has

    been received from Block Station in advance

    On double line, such LC shall not be given unless

    the last preceding train has arrived complete and

    signals have been put back to on behind the said train line is clear up-to FSS plus adequate distance

  • 8/14/2019 Methods of Block Working

    9/19

    The Absolute Block System

    Essentials:

    On single line, such LC shall not be given unless

    the last preceding train has arrived complete and

    signals have been put back to on behind the said train

    line is clear up-to FSS plus adequate distance AND it is clear of trains running towards the station to

    which LC is being given.

  • 8/14/2019 Methods of Block Working

    10/19

    The Absolute Block System

    Block Section

    Stn A Stn B

    Overlap

  • 8/14/2019 Methods of Block Working

    11/19

    The Absolute Block System

    Points to remember:

    Adequate distance is 400m for 2 aspect signals &

    180m for multi aspect signalsArrival of whole train is manually checked by

    verifying Tail Board / Lamp and exchange of

    Alright signal with Guard. It can also be done by

    Axle Counters or track circuits.

    Putting back of signals and clearance of overlap is

    checked by circuits

  • 8/14/2019 Methods of Block Working

    12/19

    The Automatic Block System

    Essntials for double line:

    Line must be continuously track circuited

    Line between stations is divided into Automatic

    Block Signalling Sections

    Entry into each Section is controlled by MACL

    stop signals

    Track Circuits control the aspect of signals OFF aspect only when line is clear up-to next signal

    plus overlap (120 m)

    Automatic replacement to ON with passage of train

  • 8/14/2019 Methods of Block Working

    13/19

    The Automatic Block System

    Essntials for single line:

    Line must be continuously track circuited

    Direction of traffic only after LC has been

    obtained from stn in advance

    Train to start from the stn only after direction of

    traffic has been esteblishedLC shall not be granted unless line is clear up-

    to FSS plus overlap (180m)

  • 8/14/2019 Methods of Block Working

    14/19

    The Automatic Block System

    Essntials for single line:

    Line between stations is divided into Automatic

    Block Signalling SectionsEntry into each Section is controlled by MACL

    stop signals in the direction of traffic

    Signals against the direction of traffic at ONTrack Circuits control the aspect of signals

    OFF aspect only when line is clear up-to next signal

    If next signal is manual, then overlap (180m) is also

    required

  • 8/14/2019 Methods of Block Working

    15/19

    The Automatic Block System

    Aspect Control: Yellow when one signalling section plus overlap is

    clear Green when two signalling sections plus overlap is

    clear (in 3 aspect territory)

    Double Yellow when two signalling sections plus

    overlap is clear (in 4 aspect territory) Green when 3 signalling sections plus overlap is

    clear (in 4 aspect territory)

    3 Aspect Signals 4 Aspect Signals

    http://c/My%20Documents/acosoa1111.exehttp://c/My%20Documents/Acosoa22.exehttp://c/My%20Documents/Acosoa22.exehttp://c/My%20Documents/acosoa1111.exe
  • 8/14/2019 Methods of Block Working

    16/19

    The Automatic Block System

    Minimum equipment of signals

    Manual stop signals at stations

    a Home

    a Starter

    an Automatic stop signal in rear of Home signal

    of the station one or more additional auto signals in

    between block stations

  • 8/14/2019 Methods of Block Working

    17/19

    The Automatic Block System

    Conditions for taking OFF manual signals

    in auto territories:

    Home signal except at terminal station Line to be clear upto Starter plus overlap (120m)

    Last stop signal

    Direction of Traffic has been esteblished Line is clear upto next signal (automatic) or

    Line is clear upto next signal (manual) plus overlap

    (180m)

  • 8/14/2019 Methods of Block Working

    18/19

    The Automatic Block System

    What happens if an Automatic signal isdefective:Signal can be at ON due to TC failure or some

    other defectDriver should stop and wait in rear of signal one minute during DAY

    Two minutes during NIGHT

    If signal remains ON, inform Guard by whistlecode & hand signal and proceed at restrictedspeed (15 kmph or less) till he reaches the nextsignal

    Then be guided by the aspect of next signal

  • 8/14/2019 Methods of Block Working

    19/19

    The Automatic Block System

    Points to remember:

    Track is continuously track circuited

    Signals diplay Off aspect normally when there

    are no trains

    Signals are replaced automatically to On with

    the passage of trains past themDrivers are authorised to pass automatic signals