Methods brochure
-
Upload
sunaina-khanna -
Category
Business
-
view
177 -
download
1
Transcript of Methods brochure
A p p a r e l C o n s u l t a n c y >>>> seamless sewing solutions
methods
An International Solution Provider for Sewn Products
-Industry Specific Trainings -Software Solutions
-Lean Implementations -Consultancy Services
Software Systems - Pro-SMV: Standard Times - Pro-Man: Bar coded production tracking
- Pro-Cut: Fabric Reconciliation - Pro-Cut-SMV: Performance Monitoring
- Pro-Merchant: Lead Time Reduction - Pro-Plan: Under development
Industry Specific Training Courses - Production Management - Work Study
- Quality Control - Garment Engineering
- Merchandising - Supervisors
- Total Quality Management (TQM) - Sewing Machine Operator (SMO)
- Training of Trainers (TOT) - Roving Quality Checkers (RQC)
AUTOMATIC
PIECE RATE WAGES CALCULATIONS
SELF-DIRECTED TEAM WORK
FACTORY PERFORMANCE
BEST METHODS
Value for money LEAN PROGRAMS
10 visits over 10 weeks = 100% satisfaction - Cutting Room - Production floor
- Finishing - Merchandising
- Quality - Stores
‘LEAN is not just a program, it is our STRATEGY’
Consultancy Services - Turn Key Solutions
- Productivity, Cutting Room & Quality Improvement Programs
- Factory & Departmental Layouts
- Setting up Industrial Engineering Department
- Fabric Utilization Improvement
- Lean Implementation Programs
Management Dashboard All information, always at your fingertips - Output - Efficiency
- Loss Times - Work in Progress
- Attendance - Fabric Savings
- Late Deliveries - TNA Status
- Daily Profit & Loss
A round man... Cannot be expected to fit in a square hole right away,
He must have time to modify his shape! - Mark Twain
Pro-Man An 0rder tracking system that produces bar-
coded bundle tickets which travel with bundles
from the first to the last operation, Bar-coded
tickets are detached at each operation and
then scanned to produce a multitude of
important information.
KEY FEATURES: - Operator Efficiency
- Line Efficiency
- Factory Efficiency
- Work in Progress
- Lost Times
- Profit and Loss at every Scan
- Bottle Neck Identification
- In-built Incentive Schemes
- Automatic Skill Matrix
- And many more
Pro-SMV A system to establish fair and consistent
targets for every operations highlighting best
methods and promoting superior quality.
KEY FEATURES: - International Standard Times
- Equitable Targets
- Best Method Development
- Quality Through Standardisation
- Fast and Accurate Costing
- Easy to Learn and Apply
- Constant up-grading of Software
- Improves the Work Study Department
- Training Period 3 weeks
- Promotes Efficiency and Consistency
- Optimises Investment in Training
- Evaluation of Capital Equipment
- Controlled Management Information
- Effective Scheduling
MONITORING
PERFORMANCE
SETTING STANDARD TIMES
BAR-CODED
PRODUCTION TRACKING
Pro-Cut-SMV Sets standard times and produces bar-coded
tickets for the control of the labour and work in
progress in cutting room.
KEY FEATURES: - Monitor Cutting Room Performance
- Monitor Work in Progress
- Simplifying Cutting Procedures
- Operation Sequence per Style
- Data Card per Style
- Barcodes for every activity
- Monitor Operator Efficiency
- Establish Lost Times
- Cutting Room Efficiency
Pro-Cut Fabric represents 50 to 70% of your product
costs, it is essential to improve fabric
utilisation, this system will help you to achieve
at least a 3% improvement.
KEY FEATURES:
- Total Fabric Control
- Automatic Cut Order Planning
- Optimise Lay lengths & Ply heights
- Fabric Reconciliation for every order
- Establish your Profit or Loss on Fabrics
- Group width, shade and shrinkage
- Automatic Lotting Facility
- Improved Remnant Management
- Monitor Off-cuts and Panel Replacement
- Control Damages & Roll Variance
- Supplier Evaluation
Money is like manure… It's not worth anything, Unless you spread it around! - Junior Murchison
SAVING FABRIC
MANAGING
END-BITS
IMPROVING
EFFICIENCY
Pro-Merchant Vendor and buyer management for efficient
interdepartmental information flow which helps
to ensure on-time in-house of required ma-
terials and reduction in pre production lead
times, streamlining and improving file hand
over and delivery.
KEY FEATURES:
- Automatic TNA Development
- Fabrics/ Buyers specific Lead Times
- Integrated Stock Control System
- Creates To-do Lists
- Prioritises Critical Activities
- Alerts Indicating Future Milestones
- Integrated Costing System
- BOM Generation and Control
- Generate Purchase Orders
- Receive Goods in Stock
- Monitor Delivery Performance
- Merchant Performance Evaluation
- Supplier Performance Evaluation
- Improve Pre-Production Lead Times
- Facility to Re-plan Delayed Activities
Pro-Plan A Production Planning System that auto-
matically predicts order completion dates, com-
pares these dates to the requested delivery
date and indicates the number of days early or
late the order will be.
KEY FEATURES:
- Integrated with Pro-Man, Pro-Cut &
Pro-Merchant
- Automatic Re-planning based on File
Handover and Delivery Date Changes
- 12-months’ Advance Calendar
- Update Running Orders’ Status
- Planning Overtime
- Minimising Order Splitting
- Tracking of Outwork
- Vendors’ Delivery Commitment
- Automatic Alerts and Reminders
- Colours indicating Line & Order Status
- Data security: Authorization &
Authentication
Meeting the deadlines… Is not good enough, Beating the deadlines is my expectation! - Dhirubhai Ambani
Methods Apparel Consultancy India Pvt. Ltd.
Suite 247/ 248, Apparel House
Sector 44, Gurgaon - 122003
Haryana, INDIA
A Consultancy firm dedicated to the Sewn Products Industry
since 1981…
We offer complete solution to apparel companies, we are committed to constant up -gradation of
our products, incorporating the latest technologies and manufacturing concepts.
We have satisfied clients in 20 countries including India, Sri Lanka, Bangladesh, South -Africa,
Botswana, Lesotho, Jordan, Ethiopia…
Our team of experts comprise of skilled professionals with expertise in their areas. Our consultants
have hands on experience in their fields of specialization and have shown results in excess of 15%
productivity improvement in sewing department and 3% fabric savings in the cutting room.
As a first step, we suggest an exhaustive diagnostic surveys linked with a detailed report indicating
areas of potential improvement to show the way forward.
We are not ‘Quick Fix’ but believe in long and mutually beneficial relationships with our
clients. Our experience and expertise is there to help companies to become more
productive, competitive and most importantly more profitable.
ROGER THOMAS
Managing Director [email protected]
Mobile No. 9899011174
SUNAINA KHANNA Director
[email protected] Mobile No. 9899174466
Phone—0124-2708203
0124-2385247
Fax— 0124-2708203
Website— www.methodsapparel.com