Methodology for the IWT LAB report

Analysis based on the deep dive

processes

07/03/2012 EnnsLP - Plimsoll

Page 2: Methodology for the IWT LAB report Analysis based on the deep dive processes 07/03/2012 Enns LP - Plimsoll.

Deep dive matrix

1.1 place of the next visit

1.2 date of the next visit1.3 members of the visiting group (participants)

Page 3: Methodology for the IWT LAB report Analysis based on the deep dive processes 07/03/2012 Enns LP - Plimsoll.

TG1 TG2 TG3 TG4 TG5

ENNSMarch 6-8

BAY-L, VUK Galati M. APDM PP, NS PP,LP

BRATJune 6-7

BAY-L APDF APDM PP, NS PP, LP

DUNAÚJVÁROSJune 6-7

VUKOVSeptember 10-12

BAY-L APDF EHOO PP, NS PP, LP

NOVI SADSeptember 10-12

GIUR23-25 April

BAY-L, VUK MUN. GAL EHOO PP, NS PP, LP

GALATI23-25 April

APDM

VIDIN ?

SILISTRAMay 30-31

BAY-L MUN. GAL (not sure)

VUK PP, NS PP, LP

Page 4: Methodology for the IWT LAB report Analysis based on the deep dive processes 07/03/2012 Enns LP - Plimsoll.

3. Methodology for deep dive process (manual for analysis process)

Status quo Report to be prepared and distributed by e-mail latest one week before IWT Lab visit. (Ennshafen: already done)Galati and Giurgiu: 16th April 2012 Bratislava and Dunaújváros 30th May 2012 Novi Sad, Vukovar and Vidin : 3rd September 2012

Elaboration of Status Quo Reports to be done by each Port individually. Report to be based on „Methodology of the IWT Lab Reports”.

Suggested travel routings to be advised by ports latest together with Status Quo reports. List of available accommodations to be forwarded 1 month before visit of experts. All hosts kindly requested to assist in booking of accommodation.

Page 5: Methodology for the IWT LAB report Analysis based on the deep dive processes 07/03/2012 Enns LP - Plimsoll.

At IWT Lab following basic agenda suggested (Deep dive analysis):

1. Questions on Status quo report:

• Location (general map of the port)• Proprietorial status• Management structure (regulatory framework)• Brief history • Total port area (incl. land, water, warehouses – open and covered

- / silo and industrial sites/ - public / private / municipality)• Water depth (at anchorage/fairway/entrance/port/dock/etc• Length of the quay(s) / jetty(s)

Page 6: Methodology for the IWT LAB report Analysis based on the deep dive processes 07/03/2012 Enns LP - Plimsoll.

2. Cargo handling processes of port from one gate to other. To be shown for all type of cargoes.

• General data – throughput of the port (total cargo handled by type for the period of 2007-2011)

• Container terminal data• Cargo handling service data (number of cranes/forklifts,

lifting capacity, silo capacity, loading rate for main products handled; reefer capacity if any) data

• 2.5.6.Rail service/network data if any• 2.5.7.RO-RO / RO-LA service data

if any

Page 7: Methodology for the IWT LAB report Analysis based on the deep dive processes 07/03/2012 Enns LP - Plimsoll.

Cont nr. 2.

• Passenger service if any• Heavy cargo handling if any• Any service not described (tug, custom,

pilot, bunkering, etc)• Running development/expansion

Page 8: Methodology for the IWT LAB report Analysis based on the deep dive processes 07/03/2012 Enns LP - Plimsoll.

Cont nr.2.

• TG 5 information (logistics, hinterland connections, feeder, RIS, navigability)

• Environmental status

Page 9: Methodology for the IWT LAB report Analysis based on the deep dive processes 07/03/2012 Enns LP - Plimsoll.

Visit of the port(s)

Page 10: Methodology for the IWT LAB report Analysis based on the deep dive processes 07/03/2012 Enns LP - Plimsoll.

Discussing of impressions and preparing SWOT analysis of the port together.

Strengths: characteristics of the project that give it an advantage over others

Weaknesses (or Limitations): are characteristics that place the project at a disadvantage relative to others

Opportunities: external chances to improve performance (e.g. make greater profits) of the project

Threats: external elements in the project that could cause trouble for the business or project

Page 11: Methodology for the IWT LAB report Analysis based on the deep dive processes 07/03/2012 Enns LP - Plimsoll.
Page 12: Methodology for the IWT LAB report Analysis based on the deep dive processes 07/03/2012 Enns LP - Plimsoll.
Page 13: Methodology for the IWT LAB report Analysis based on the deep dive processes 07/03/2012 Enns LP - Plimsoll.

4. Table of Contents of IWT Lab Report (minimal version!)

•Short version of Status Quo Report, including comments

•Cargo handling process(es)

•Swot analyses

•Detailed findings of port visit for TG1, TG2, TG3, TG4, TG5.