METAPROJECT S.A. INDUSTRY INGENIERÍA E INNOVACIÓN … · DOMINIQUE VIERA PEÑAILILLO Business and...

13
INGENIERÍA E INNOVACIÓN PARA LA INDUSTRIA Y MINERÍA. METAPROJECT S.A. METAPROJECT S.A. 20 + YEARS Setting your Dreams and Ours in Motion. 1992- 2012 -2032 www.metaproject.cl Metaproject in its 20 years history totals more than 1000 successful projects to its credit, with an average of 50 projects per year, about 80,000 man / hours, demonstrating creativity, expertise and innovation. We provide engineering services for mining in the following disciplines: Open Pit Mining, Underground Mining, Economic Risk Analysis, Engineering, Integral Quality and Industrial Engineering. Implemented under international standards and applying the NFPA normative INDUSTRY FIREFIGHTING NETWORK SYSTEMS AND WET NETWORKS.

Transcript of METAPROJECT S.A. INDUSTRY INGENIERÍA E INNOVACIÓN … · DOMINIQUE VIERA PEÑAILILLO Business and...

Page 1: METAPROJECT S.A. INDUSTRY INGENIERÍA E INNOVACIÓN … · DOMINIQUE VIERA PEÑAILILLO Business and Clienting Manager Commercial Engineer, Universidad Adolfo Ibáñez. Master in Finances

INGENIERÍA E INNOVACIÓN PARA LA INDUSTRIA Y MINERÍA.

METAPROJECT S.A.METAPROJECT S.A.

20 + YEARS

Setting your Dreams

and Ours in Motion.

1 9 9 2 - 2 0 1 2 - 2 0 3 2 www.metaproject.cl

Metaproject in its 20 years history totals

more than 1000 successful projects to its

credit, with an average of 50 projects per

year, about 80,000 man / hours,

demonstrating creativity, expertise and

innovation.

We provide engineering services for mining

in the following disciplines: Open Pit

Mining, Underground Mining, Economic

Risk Analysis, Engineering, Integral Quality

and Industrial Engineering.

Implemented under international standards and

applying the NFPA normative

INDUSTRY

FIREFIGHTING

NETWORK SYSTEMS

AND

WET NETWORKS.

Page 2: METAPROJECT S.A. INDUSTRY INGENIERÍA E INNOVACIÓN … · DOMINIQUE VIERA PEÑAILILLO Business and Clienting Manager Commercial Engineer, Universidad Adolfo Ibáñez. Master in Finances

METAPROJECT www. metaproject.cl [email protected] Teléfono (562) 2642930

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K SY

STEMs

SYSTEM

s A

ND

WET N

ETWO

RK

S.A

ND

WET N

ETWO

RK

S.

Group Metaproject Entrepreneurship Tree. 1992 – 2012-2032

2

Values :

Passion for work.

Constant innovation.

Honesty.

Seriousness and respect, as

confidence generators in business

relationships.

Inventiveness to find innovative

solutions

Courage to face and demand

permanent changes in

the dynamics of globalization.

Mission: Efficiently increase productivity and Net Present Value (NPV) of our customers

in a happywork environment by implementing innovative techniques and

methodologies, improving competition, getting profitability in equilibrium with

humanbeings and the environment.

Vision:

Being leaders in engineering and management projects,

seeking to seduce our customers and those of the competition on

the basis of reliable and innovative solutions with the best

offer on the market.

Page 3: METAPROJECT S.A. INDUSTRY INGENIERÍA E INNOVACIÓN … · DOMINIQUE VIERA PEÑAILILLO Business and Clienting Manager Commercial Engineer, Universidad Adolfo Ibáñez. Master in Finances

METAPROJECT www. metaproject.cl [email protected] Teléfono (562) 2642930

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K SY

STEMs

SYSTEM

s A

ND

WET N

ETWO

RK

S.A

ND

WET N

ETWO

RK

S.

Mining is art, and art is transformed into a strategy, through intelligent and articulate mine plans that maximize profitability for the owners, protecting the integrity of workers with high standards of safety, with no accidents and respect for the environment and the local communities.

Manuel Viera Flores

Ph. D. Business Ciences , Universidad

Autónoma de Madrid.

Magister in Industrial Engineering

Universidad de Santiago de Chile.

Senior Mining Engineer

Universidad de Santiago de Chile.

Ceo & Managing Partner Metaproject

S.A.

Mining is the Best Country Brand.

The country brands join

characteristics that make them

unique. In some cases it may

be an artificial feature such as

the pyramids of Egypt or the

Great Wall of China or natural

such as Chilean copper.

Chile needs a business

strategy that maximizes our

mining brand , which leads us

to be the world champion in

both copper

production and clean, safe and

reliable production, with a proper

distribution of wealth. That`s

the task for the development of

the worldwide brand.

MINING BRAND

Page 4: METAPROJECT S.A. INDUSTRY INGENIERÍA E INNOVACIÓN … · DOMINIQUE VIERA PEÑAILILLO Business and Clienting Manager Commercial Engineer, Universidad Adolfo Ibáñez. Master in Finances

METAPROJECT www. metaproject.cl [email protected] Teléfono (562) 2642930

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K SY

STEMs

SYSTEM

s A

ND

WET N

ETWO

RK

S.A

ND

WET N

ETWO

RK

S.

For 20 years, focuses its services in engineering area using efficient management tools for mining and industrial sectors. Its experience enables customers to make the right decisions in scenarios of risk and uncertainty in an emerging and globalized economy.

Metaproject is a High Creativity Organization

We are an Engineering and

Innovation company in constant

search for business

opportunities.

Composed of a great team, men

and women of whom 87% are

engineers of different

specialties, among which

are: mining, mechanical,

electrical, structural metal,

industrial, computer, chemical,

environmental, trade and risk

prevention.

This powerful multi-

disciplinary staff is enriched with

psychologists, journalists,

accountants, designers and

drafters of the premium level.

Since 2006, Metaproject has a Quality Management

System certified according to ISO9001:2000, we

also consider the process of implementing the

System of Occupational Safety and Health under

the standards of OHSAS 18001.

METAPROJECT S.A.

4

Page 5: METAPROJECT S.A. INDUSTRY INGENIERÍA E INNOVACIÓN … · DOMINIQUE VIERA PEÑAILILLO Business and Clienting Manager Commercial Engineer, Universidad Adolfo Ibáñez. Master in Finances

METAPROJECT www. metaproject.cl [email protected] Teléfono (562) 2642930

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K SY

STEMs

SYSTEM

s A

ND

WET N

ETWO

RK

S.A

ND

WET N

ETWO

RK

S.

Metaproject owns ISO 9001:2008, ISO 14,001 and OHSAS 18,001 certifications, giving a high value on efficiency, sustainability and creativity in providing solutions to its customers especially in the mining area, which for years have favored us.

METAPROJECT S.A.

5 Industry Firefighting

Network Systems And

Wet Networks.

The fire risk management has become more

complex in modern industry in continuous

expansion and changes.

Progress in industrial processes has created

new dangers of fire and consequential loss

of property, financial, environmental and

above all risk of loss of life.

The fire risk assessment has become an

inherent part of the production process

involves the identification of fire hazards, fire

control and protection.

Through our expertise of years we help to

save lives and protect property from

dangerous fires with a wide range of fire

suppression solutions.

Our customers trust us to protect valuable

assets, but above all the lives of their

workers.

Metaproject is a High Creativity Organization

Page 6: METAPROJECT S.A. INDUSTRY INGENIERÍA E INNOVACIÓN … · DOMINIQUE VIERA PEÑAILILLO Business and Clienting Manager Commercial Engineer, Universidad Adolfo Ibáñez. Master in Finances

METAPROJECT www. metaproject.cl [email protected] Teléfono (562) 2642930

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K SY

STEMs

SYSTEM

s A

ND

WET N

ETWO

RK

S.A

ND

WET N

ETWO

RK

S.

SERVICES

Conceptual , Basic and Detail engineering.

Design-Based Foam Systems, Monitors, cameras

and sprinkler and cooling network. Accident Response Training in Hazardous Materials and Techniques for Emergency

Management. Development and implementation

of Emergency Plans. Training, education and

improvement of Emergency Brigades.

INDUSTRY FIREFIGHTING

NETWORK SYSTEMS AND

WET NETWORKS

Wet Network Systems and

Firefighting Networks are

the set of measures laid

down in to protect plants

against the action of fire.

6

With these measures it pretends to minimize

economic losses caused by the

incident and ensure that the activities of the

production process can be reassumed as

speedily.

Expertise

Page 7: METAPROJECT S.A. INDUSTRY INGENIERÍA E INNOVACIÓN … · DOMINIQUE VIERA PEÑAILILLO Business and Clienting Manager Commercial Engineer, Universidad Adolfo Ibáñez. Master in Finances

METAPROJECT www. metaproject.cl [email protected] Teléfono (562) 2642930

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K SY

STEMs

SYSTEM

s A

ND

WET N

ETWO

RK

S.A

ND

WET N

ETWO

RK

S.

Expertise

7 Mas información en www.metaproject.cl

Chuquicamata:

Basic Engineering

Firefighting Network

Smelting House (2009):

We developed a conceptual engineering that

allowed implement two separate systems, one

for the cast Concentrate and one for the

oxygen plant in order to maintain the entire

network pressurized with Main Electric Pump,

a diesel pump backup and a type Jockey

pump.

To install the network to the Oxygen Plant,

major event was determined as a loss in any

of the facilities. For this case, proposed a

reserve water tank, to keep for two hours the

consumption of the systems used in

extinguishing the fire using two 250 gpm

monitors.

Note that in this plant did not exist fuel tanks

to protect, however, for existing fuel tanks in

the foundry was considered a Detection and

Termination Automatic System.

Automated Control sensors were joined to the

(temperature sensors) tanks and on the

respective solenoid valves deluge valves.

For Foundry a loss in fuel tanks was considered a major event. Thus, we calculated a tank of 2400 m3 of water reserve, which meets the terms of the DS 160, which means keeping at least four hours the consumption of the systems used in extinguishing the fire, as is foam to the surface of the fuel, cooling ring perimeter in each tank and the availability of two monitors.

Page 8: METAPROJECT S.A. INDUSTRY INGENIERÍA E INNOVACIÓN … · DOMINIQUE VIERA PEÑAILILLO Business and Clienting Manager Commercial Engineer, Universidad Adolfo Ibáñez. Master in Finances

METAPROJECT www. metaproject.cl [email protected] Teléfono (562) 2642930

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K SY

STEMs

SYSTEM

s A

ND

WET N

ETWO

RK

S.A

ND

WET N

ETWO

RK

S.

Expertise

8 Mas información en www.metaproject.cl

Radomiro Tomic:

Feasibility Plant Fire Manage

ment System Extraction

and North Leach (2008)

The Feasibility Engineering done by Metaproject aimed to normalize the problems present in the Electric and Hydraulic of the Crushing Plant in SX Plant and Pilot Plant, Backyard Tank, in Area 500 of Electro-winning and the Industrial Water gravity Feed System.

We developed a conceptual engineering that

allowed implement two separate systems, one

for the cast Concentrate and one for the

oxygen plant in order to maintain the entire

network pressurized with Main Electric Pump,

a diesel pump backup and a type Jockey

pump.

To install the network to the Oxygen Plant,

major event was determined as a loss in any

of the facilities. For this case, proposed a

reserve water tank, to keep for two hours the

consumption of the systems used in

extinguishing the fire using two 250 gpm

monitors.

Note that in this plant did not exist fuel tanks

to protect, however, for existing fuel tanks in

the foundry was considered a Detection and

Termination Automatic System.

Automated Control sensors were joined to the

(temperature sensors) tanks and on the

respective solenoid valves deluge valves.

Page 9: METAPROJECT S.A. INDUSTRY INGENIERÍA E INNOVACIÓN … · DOMINIQUE VIERA PEÑAILILLO Business and Clienting Manager Commercial Engineer, Universidad Adolfo Ibáñez. Master in Finances

METAPROJECT www. metaproject.cl [email protected] Teléfono (562) 2642930

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K SY

STEMs

SYSTEM

s A

ND

WET N

ETWO

RK

S.A

ND

WET N

ETWO

RK

S.

Expertise

9 Mas información en www.metaproject.cl

Chuquicamata:

Deputy Management

Smelting House (2007)

The engineering design proposed by

Metaproject allowed to attack a possible fire

incident in the following facilities:

Acid Plants:

* Superintendent Building

* Cleaning Areas

* Contact areas

* Acid Storage Area

* Arsenic Treatment Plant Perimeter Areas

* Buildings

* Currency Exchange

* Fuel storage tanks

storage warehouses

Smelter of Concentrated:

* Preparation Unit Load

* Horn CT2

* Electric Oven

* CPS

* Flash Furnace

* Refining and Casting.

On the development of the study

Outline level of the project “Smelt

Deputy Firefighting System",

established and defined for each 'area

of the foundry, the more Suitable fire

load for extinguishing fires, removing

substandard and risk conditions that

the existing Fire Fighting System had.

Page 10: METAPROJECT S.A. INDUSTRY INGENIERÍA E INNOVACIÓN … · DOMINIQUE VIERA PEÑAILILLO Business and Clienting Manager Commercial Engineer, Universidad Adolfo Ibáñez. Master in Finances

METAPROJECT www. metaproject.cl [email protected] Teléfono (562) 2642930

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K SY

STEMs

SYSTEM

s A

ND

WET N

ETWO

RK

S.A

ND

WET N

ETWO

RK

S.

Expertise

10 More information www.metaproject.cl

Chuquicamata:

Wet network Industrial Plants

Industrial Plants, Refinery

Management (2006)

The project basic engineering addressed to the

installation of a Wet Network to support fire control,

designed according to international and

NFPAstandards and to, thus supplying the

deficiencies that the Network had at the time.

The Network considered a backup pumping equipment, both to maintain pressure in the jockey pumps, and for the main pump. In the latter case is supported with a diesel pump, which allows the system to respond to a possible Black Out.

Page 11: METAPROJECT S.A. INDUSTRY INGENIERÍA E INNOVACIÓN … · DOMINIQUE VIERA PEÑAILILLO Business and Clienting Manager Commercial Engineer, Universidad Adolfo Ibáñez. Master in Finances

METAPROJECT www. metaproject.cl [email protected] Teléfono (562) 2642930

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K SY

STEMs

SYSTEM

s A

ND

WET N

ETWO

RK

S.A

ND

WET N

ETWO

RK

S.

Expertise

11 Mas información en www.metaproject.cl

Chuquicamata:

Mejoramiento Red Contra

Incendio de Planta SX (2004)

The amendments developed by the details

engineering for the system SPCI were adding a new

drive system, this considered a main electric pump,

a diesel pump and a backup pump to pressurize the

lines jockey. Also added new ponds, a water of 810

m3 and a foam (bladder tank) of 1,100 gallons. We

also performed the replacement of pipes matrices

across the line of existing foam system.

Existing monitors were modified with the installation

of new hydraulic automatic monitoring of action to

complete the amount required for coverage of all

areas of risk. Moreover, were removed sprinklers

(sprinklers) closed mixer-decanters tanks Train A

and foam cameras were installed in these tanks.

It installed a detector system UV / IR and

temperature in tank mixers, decanters, coalescing

organic solvent electrolyte. It also made the

installation of CCTV, distributed throughout the plant

and tanks mixer-decanters.

Finally, we extended the existing pump room for

mounting the foam tank and generator set and

implemented an emergency lighting system

independent and a CO2 system to protect the

electrical room of the pump room and the generator

set room.

Network Systems and Network Firefighting Wet are the set of measures laid down in plants to protect against the action of fire. These measures are to minimize economic losses produced by the incident and ensure that the activities of the production process can be reassumed as speedily.

Page 12: METAPROJECT S.A. INDUSTRY INGENIERÍA E INNOVACIÓN … · DOMINIQUE VIERA PEÑAILILLO Business and Clienting Manager Commercial Engineer, Universidad Adolfo Ibáñez. Master in Finances

METAPROJECT www. metaproject.cl [email protected] Teléfono (562) 2642930

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K

IND

USTR

Y FIR

EFIGH

TING

NETW

OR

K SY

STEMs

SYSTEM

s A

ND

WET N

ETWO

RK

S.A

ND

WET N

ETWO

RK

S.

Our Leadership

TEAM

We also have a strong multidisciplinary staff

of psychologists, sociologists and journalists.

Metaproject Group is formed by a

great team, composed of

over 120 professionals from the

most diverse specialties in the

field of Mining Industry and

Business.

MANUEL VIERA FLORES

Ceo & Managing Partner Group Metaproject .

Civil Mines Engineer . Universidad de Santiago de Chile.

PhD in Business Sciences , Universidad Autónoma de Madrid

Master in Industrial Engineering Universidad de Chile.

Postgraduate in Economics Imperial College London, England.

VÍCTOR VALENZUELA PAVEZ

Chief Operating Officer Ingeniería e Innovación S.A.

Civil Industrial Engineer,

Universidad Técnica Federico Santa María.

Master in Business Administration ,

Universidad Santiago de Chile.

Project Management Diploma ,

Calgary University (Canadá).

Quality Assurance SystemsAuditor ISO 9001:2000.

DOMINIQUE VIERA PEÑAILILLO

Business and Clienting Manager

Commercial Engineer,

Universidad Adolfo Ibáñez.

Master in Finances ,

Universidad Adolfo Ibáñez.

12

Page 13: METAPROJECT S.A. INDUSTRY INGENIERÍA E INNOVACIÓN … · DOMINIQUE VIERA PEÑAILILLO Business and Clienting Manager Commercial Engineer, Universidad Adolfo Ibáñez. Master in Finances

SETTING YOUR DREAMS AND OURS IN MOTION

www.metaproject.cl

20 + years years

1992 – 2012 – 2032