MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of...
-
date post
21-Dec-2015 -
Category
Documents
-
view
217 -
download
2
Transcript of MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of...
![Page 1: MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.](https://reader030.fdocuments.in/reader030/viewer/2022032704/56649d555503460f94a33065/html5/thumbnails/1.jpg)
MEPMEP(Martian Environmental Pod)(Martian Environmental Pod)
2/16/20042/16/2004
Aerospace Engineering DepartmentAerospace Engineering Department
University of Colorado-BoulderUniversity of Colorado-Boulder
Interim Review
![Page 2: MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.](https://reader030.fdocuments.in/reader030/viewer/2022032704/56649d555503460f94a33065/html5/thumbnails/2.jpg)
Requests for ActionRequests for Action
RFA Author Solution
Verify clearances of deployment
Peterson Proved during initial testing
Make jigs to aide assembly of all the parts
Peterson/
Trudy
Developed method of assembling parts
Electronics package needs to be taller for clearance
Peterson/
Rhode
Corrected in Solidworks/Corel Draw drawings
Control motor speed. Avoid damage.
Trudy RPM of motor is low enough that no damage will result from the motor
![Page 3: MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.](https://reader030.fdocuments.in/reader030/viewer/2022032704/56649d555503460f94a33065/html5/thumbnails/3.jpg)
x 10
Electronics Package
Platform
Mounting Box
Greenhouse
Thermal Petals
![Page 4: MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.](https://reader030.fdocuments.in/reader030/viewer/2022032704/56649d555503460f94a33065/html5/thumbnails/4.jpg)
Design ChangesDesign Changes• Greenhouse/Pressure System
– New deployment method for greenhouse– Circular top will be secured by an acrylic ring inside of
the greenhouse
• Thermal Shield– Material of axle is aluminum
• Electronics/Software– Changed design of circuit to include:
• Op Amp• Transistor• Diode• Capacitor
![Page 5: MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.](https://reader030.fdocuments.in/reader030/viewer/2022032704/56649d555503460f94a33065/html5/thumbnails/5.jpg)
New Circuit DesignNew Circuit Design
![Page 6: MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.](https://reader030.fdocuments.in/reader030/viewer/2022032704/56649d555503460f94a33065/html5/thumbnails/6.jpg)
ProgressProgress
• Solidworks drawings → Corel Draw
• Prototypes of petals 7-10– Machined/Assemblied– Tested
• Prototype circuit on solderless breadboard
• Demonstration version of circuit on wire wrap breadboard
![Page 7: MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.](https://reader030.fdocuments.in/reader030/viewer/2022032704/56649d555503460f94a33065/html5/thumbnails/7.jpg)
Current Issues: Current Issues: Greenhouse/Pressure SystemGreenhouse/Pressure System
• Kapton is too stiff to roll for deployment– Molding tool for new design
• Difficulty attaching circular top to cylindrical base– Acrylic ring will be secured
inside the top of the greenhouse to ease manufacturing
![Page 8: MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.](https://reader030.fdocuments.in/reader030/viewer/2022032704/56649d555503460f94a33065/html5/thumbnails/8.jpg)
Current Issues:Current Issues:Thermal ShieldThermal Shield
• During initial testing, shear stress was too great at the rotation point on the petals.– Aluminum sleeve fits over
the outermost petal and is welded to the axle to distribute the torque applied.
– Runs half the length of the outermost petal
![Page 9: MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.](https://reader030.fdocuments.in/reader030/viewer/2022032704/56649d555503460f94a33065/html5/thumbnails/9.jpg)
Current Issues:Current Issues:Electronics/SoftwareElectronics/Software
• LabView class– Trying to take course to learn software
programming– High risk if taken through the ITLL
![Page 10: MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.](https://reader030.fdocuments.in/reader030/viewer/2022032704/56649d555503460f94a33065/html5/thumbnails/10.jpg)
Additional PartsAdditional Parts
• Molding tool
• Acrylic ring for greenhouse manufacturing
• Aluminum axle
• Aluminum sleeves for petal 1
• Mounting bracket for motor
![Page 11: MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.](https://reader030.fdocuments.in/reader030/viewer/2022032704/56649d555503460f94a33065/html5/thumbnails/11.jpg)
Schedule ProgressSchedule Progress
![Page 12: MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.](https://reader030.fdocuments.in/reader030/viewer/2022032704/56649d555503460f94a33065/html5/thumbnails/12.jpg)
Critical Path ElementsCritical Path Elements
• Machining acrylic parts (1/12 – 2/23)
• Assemble petals and base structure (2/2 – 3/19)
• Machine/construct molding tool (2/16 – 3/8)
• Manufacture greenhouse (2/9 – 3/19)
• Test pressure system (2/16 – 3/1)
• Build final soldered circuit (2/23 – 3/15)
• Develop software using LabView (2/23 – 3/19)
![Page 13: MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.](https://reader030.fdocuments.in/reader030/viewer/2022032704/56649d555503460f94a33065/html5/thumbnails/13.jpg)
Budget AnalysisBudget AnalysisDate Company Parts Phone Number Contact Amount
12/15/2003 Kinko's copies 207.94
12/15/2003 Kinko's copies 19.20
12/17/2003 Colorado Plastic Products Inc. acrylic, epoxy 303-443-9271 10.67
1/15/2004 R.S. Hughes Company Inc. epoxy 303-371-9440 33.30
1/20/2004 Omega Engineering Inc. thermistor, pressure transducer 203-359-1660 114.35
1/21/2004 Maxon Precision Motors Inc. motors, gearboxes 650-697-9614 Mike Beasley 348.27
1/22/2004 R.S. Hughes Company Inc. epoxy gun, mixing nozzles 303-371-9440 Thomas 62.93
1/27/2004 American Durafilm Kapton 508-429-8000 163.08
1/28/2004 McGunkin Hardware Inc. clamps, aluminum rods, key 303-443-1822 62.47
1/28/2004 Colorado Plastic Products Inc. acrylic 303-443-9271 10.32
1/28/2004 R.S. Hughes Company Inc. mixing nozzles 303-371-9440 Thomas 47.90
1/28/2004 The Lee Company control valve 860-399-6281 John Caron 0.00
1/30/2004 Radio Shack electronics 30.84
1/31/2004 Radio Shack electronics 54.54
1/31/2004 Fistell's relay switch 30.40
2/9/2004 Colorado Plastic Products Inc. acrylic 303-443-9271 42.00
2/12/2004 The Beverage Factory carbon dioxide tank 53.00
Total: 1,291.21
![Page 14: MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.](https://reader030.fdocuments.in/reader030/viewer/2022032704/56649d555503460f94a33065/html5/thumbnails/14.jpg)
Questions?Questions?