MEMORANDUM To: Jennifer Cass Vice President & Chief of Staff, Capital Program NYC Economic Development Corporation One Liberty Plaza New York, NY 10006 From: Pinar Balci, PhD Assistant Commissioner Bureau of Environmental Planning & Analysis Re: Contract Amendments and Clarifications Date: September 9, 2019 Revised 11/25/2019 The following contract amendments will be applied to Jamaica Bay Contract: (revisions shown in red) 1. A. Right-of-way Bioswales, Rain Gardens, and Greenstrips 1. Precast*Concrete Taper strip to be installed at all Right-of-way Bioswales, Right-of-way Rain Gardens, and Right-of-way Greenstrips inlets and outlets i. Precast Concrete Taper, which follows tapered curb line, to be installed behind curb cut opening in lieu of Concrete Sediment Pad ii. Contractor is not to order/use any Concrete Sediment Pads or Steel Plate Curb Cover for Inlet Curb Cuts for this contract iii. All type 1,2, and 3 inlets will have the same dimensions as a type 1 Right-of-way Bioswale iv. All type 1,2, and 3 outlets will have the same dimensions. The new dimensions will be a 10” outlet invert with 12” taper on either side v. Contractor shall refer to Figure 1 attached. 2. Hydraulically Connected Right-of-way Bioswales i. All require a gabion wall ii. See attached Figure 1.A. 3. Concrete aprons i. See attached Figure 1 for modified dimensions and pitch 4. Sediment Control Device i. Must be used at all type 1,2, and 3 inlets ii. 30” HDPE double-wall corrugated pipe to be used along 8landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast in place. Impermeable membrane required under cast in place concrete. Vincent Sapienza Commissioner Angela Licata Deputy Commissioner Sustainability 59-17 Junction Blvd. Flushing, NY 11373 Tel (718) 595-4398 Fax (718) 595-4422 [email protected]

Transcript of MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping...

Page 1: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

MEMORANDUM

To: Jennifer Cass

Vice President & Chief of Staff, Capital Program

NYC Economic Development Corporation

One Liberty Plaza

New York, NY 10006

From: Pinar Balci, PhD

Assistant Commissioner

Bureau of Environmental Planning & Analysis

Re: Contract Amendments and Clarifications

Date: September 9, 2019 Revised 11/25/2019

The following contract amendments will be applied to Jamaica Bay Contract:

(revisions shown in red)

1. A. Right-of-way Bioswales, Rain Gardens, and Greenstrips

1. Precast*Concrete Taper strip to be installed at all Right-of-way

Bioswales, Right-of-way Rain Gardens, and Right-of-way Greenstrips

inlets and outlets

i. Precast Concrete Taper, which follows tapered curb line, to be

installed behind curb cut opening in lieu of Concrete Sediment

Pad

ii. Contractor is not to order/use any Concrete Sediment Pads or

Steel Plate Curb Cover for Inlet Curb Cuts for this contract

iii. All type 1,2, and 3 inlets will have the same dimensions as a

type 1 Right-of-way Bioswale

iv. All type 1,2, and 3 outlets will have the same dimensions. The

new dimensions will be a 10” outlet invert with 12” taper on

either side

v. Contractor shall refer to Figure 1 attached.

2. Hydraulically Connected Right-of-way Bioswales

i. All require a gabion wall

ii. See attached Figure 1.A.

3. Concrete aprons

i. See attached Figure 1 for modified dimensions and pitch

4. Sediment Control Device

i. Must be used at all type 1,2, and 3 inlets

ii. 30” HDPE double-wall corrugated pipe to be used along 8”

landscaping stakes

iii. See attached Figure 1.B.

*All concrete can either be precast or cast in place. Impermeable membrane required under cast in

place concrete.

Vincent Sapienza Commissioner

Angela Licata Deputy Commissioner Sustainability

59-17 Junction Blvd.Flushing, NY 11373

Tel (718) 595-4398 Fax (718) 595-4422 [email protected]

Page 2: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

2. Revised11/25/19: Design changes for all Right-of-way Infiltration Basins

(ROWIBs) see Figure 2:

1. ROWIB Inlet Detail

i. All ROWIBs will have Steel Face Inlet Openings 28” wide,

regardless of ROWIB size (contract documents have DEP

Standards showing 18” for Type 1, and 14” wide openings for

Type 2 and Type 3 ROWIBs);

ii. Outlet openings will be 12” wide regardless of ROWIB size,

where applicable.

iii. ROWIB Steel Face Inlet/Outlet Openings are to include

horizontal Welded Steel Bar. Bar to be painted with same

coating material as steel face curb cover; see revised Figure 2,

attached for reference

iv. Inlet Apron is shown on the DEP GI Standards as 10% cross-

slope. This is meant as a minimum; the design benefits from

higher pitch; see associated schedule for direction on apron

pitch, Figure 1. therefore, variance of up to 1%, i.e. slope

between 10-11%, is acceptable.

2. Perforated Covers for Inlet Pipe – Debris Screen

i. Perforated Covers for half-perforated 8” diameter HDPE inlet

pipe will no longer be used; newly fabricated Perforated Pipe

Covers to be installed instead at all IB locations; shop drawing

attached as Figure 3.

3. Inlet/Outlet Grate and Locking Mechanism

i. G-Clip Grating Fastener to be used to secure Metal Grate &

Frame(s) as shown on GI-207 of the Standards for Green

Infrastructure, see Figure 4 for reference

ii. Contractor to furnish Metal Grate & Frame for Inlets (and

Outlets, where applicable) with two 1-1/2” diameter circular

openings near the grate edges to function as lifting points for

lifting hooks, and 1 ½ x 5 ½” x 1/8” metal plate with NYC DEP

logo, shop drawing to be provided. (Figure 5 updated

11/25/2019)

iii. Contractor to procure lifting hooks for lifting metal grate as well

as G-Clip wrench to be used for inlet maintenance activities.

Purchased lifting hooks and G-Clip wrench to be handed over

to DEP at the end of the contract.

4. Inlet Screen Box (Filter Basket)

i. Metal filter baskets, referred to as Inlet Screen Box, to be

placed in all ROWIB inlet chambers; shop drawings attached as

Figure 6

5. Clean Out Covers

i. For all ROWIBs, Contractor shall furnish cast iron clean out

covers (and frame) for access to the vertical 8” HDPE pipe

risers to function as clean out access; contractor must verify

that these covers can be removed by hand without the use of

available tools. See Figure 7 for reference

ii. Contractor to adjust clean-out elevation of the cleanout cover

and frame such that the top of the solid clean out cover is flush

Page 3: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

with the elevation of the adjacent surface – whether concrete or

grass top

6. Precast Concrete Chambers at Outlet – removed, no longer included in

revised IB design as of 11/25/19

i. ROWIBs will no longer have Outlet Precast Concrete

Chambers at locations planned on roadways of ≤3%

longitudinal slope

ii. Engineer will investigate contract drawings for the number of

ROWIBs impacted.

iii. There shall be no Steel Face Opening at the locations where

Outlet Precast Chambers are not installed; curb shall continue

per DOT Standards.

7. Observation Wells

i. Observation wells to be furnished and installed, Figure 8

attached

ii. DEP will use these wells to verify ROWIB performance prior to

acceptance of ROWIB

3. ROWIB maintenance and substantial completion

1. In order to minimize maintenance requirements during construction,

contractors to close all the inlet/outlet chamber openings with

Styrofoam

2. Contractor shall provide an impermeable barrier cut to size and placed

directly under metal grates immediately after construction. This will

ensure that no debris, trash, or sediment can enter the ROWIB during

construction activities.

3. Once all ROWIBs in the contract are constructed and are ready for

substantial completion inspections, contractor to flood-test ROWIBs, as

well as show all ROWIB components to be accessible/removable in the

presence of DEP staff.

4. After DEP staff has approved flood-test results, contractor to clean

ROWIBs prior to turning over to DEP. Note that DEP will schedule

substantial completion inspection and testing dates for ROWIBs

separately from inspections for other ROW GI types within the contract.

4. Final Type D Design

1. Type D to be constructed per final design (Figure 9) in lieu of draft

design included in the contract documents.

5. Revised Planting Palettes

1. Revised planting palettes will be used in lieu of planting palettes in

contract documents as per the updated Planting Plans (Figure 10) and

corresponding Planting Plan Updates memo. (Updated 11/25/2019)

6. Clarifications to July 2017 Standards

1. Figure 11 is a list of clarifications and modifications to the “NYCDEP

BEDC-GI Standard Designs and Guidelines for Green Infrastructure

Practices” released on July 19th, 2017 (Updated 11/25/2019)

7. Water Service Detail

Page 4: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

1. See Figure 12 for updates to Water Service Detail. Updates include:

i. Materials: Split PVC, solid PVC, Expanding foam sealant,

Survey Marker, HDPE Barrier

ii. Split PVC will be used for sleeving the existing water service

iii. Solid PVC will be used as a “spare” water service sleeve for

future use

iv. Watertight expanding foam sealant will be used throughout

entire sleeve length of existing water service.

v. Survey Marker delineating the location of the water service to

be installed within the concrete header.

vi. HDPE barrier to be used at all locations with utility crossings

2. Contractor to provide a list of locations that will require sleeving and

indicate if the material is potential lead before construction starts. The

map is available for reference under

https://nycdep.maps.arcgis.com/apps/View/index.html?appid=fe8c7a4d

d6d24959ac765660ba3a7c1a

i. CM to reference all construction locations on the attached map,

and review all tap card information

1. If potential lead line and valve within footprint of GI, the

location must be submitted as an RFI for review by

design consultant and DEP.

a. Design consultant to shift/shorten/convert the

asset to avoid the water valve and line

2. If potential lead line without valve, Contractor may

proceed with construction and sleeve line per Figure 12.

a. It is unacceptable to perform any partial repair

on lead lines

3. Contractor to provide a list of locations where spare water service is

installed. This should be at every location with an existing water

service.

8. Utility Detail

1. See Figure 13

2. HDPE Barrier to be used at all locations with utility crossings

9. There should be a minimum 10’ clearance from guy wires to GI

Attachments:

Figure 1: Sketch for Concrete Strip and Concrete Aprons

Figure 1A: Hydraulically Connected Right-of-way Bioswales

Figure 1B: Sediment Control Device

Figure 2: Updated Infiltration Basin Design and Updated Welded Steel Bar

Design Figure 3: Shop Drawing for Perforated Pipe Covers

Figure 4: Sketch for Grating Fastener

Figure 5: Sketch for Metal Grate & Frame Lift Hook Openings

Figure 6: Shop Drawing for Inlet Screen Box (Filter Basket)

Figure 7: Photo for Cast Iron Cover/Frame

Figure 8: Sketch for Observation Well Details

Figure 9: Final Type D Design

Page 5: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

Figure 10: Updated Planting Plans

Figure 11: Clarifications to July 2017 Standards

Figure 12: Water Service Detail

Figure 13: Utility Detail

DEP cc: M. Walker

A. Kocovic

F. Reyes

S. Drago

R. StatonS. DragoJ. LandeckerJ. Liu

Page 6: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

FLOW

20'-0"LOCATION OF BIOSWALE

VARIES

5'-0

"

OR

A

S

SH

OW

N

PLAN

A

A

EXISTING

CONCRETE

SIDEWALK

EXISTING

CATCH BASIN

PLANTED AREA

C

C

BIOSWALE

OUTLET

B

CURB LINE

PROPERTY LINE

OR AS SHOWN

5"-THICK CONCRETE STRIP (TYP.), SEE GI-206

SEE DRAWING GI-501A, B, C & D FOR TYPICAL

PLANTING PLANS

L-SHAPED EDGING WITH MINIMUM 9" STAKES

SEE DRAWING GI-204

STEEL TREE PIT GUARDS (3 SIDES TYP.)

SEE DRAWINGS GI-601A, B, C, D & GI-602A

8"-THICK REINFORCED CONCRETE GUTTER

BIOSWALE

INLET

B

SIDEWALK

SECTION A-A

TOP O CURB

PIT

CH

DROP CURB [INLET]

JUTE MESH

ENGINEERED

SOIL

OPEN-GRADED

STONE BASE

1/2" EXPANSION JOINT

AND FILLER PER NYC

DOT HIGHWAY SPEC.

SECTION 2.15 (TYP.)

WRAP STONE IN

GEOTEXTILE

(TOP AND SIDES

ONLY)

AT BIOSWALE INLET

UNDISTURBED SOIL

PLANTED

AREA

CONCRETE

HEADER (3) SIDES

1'-3

"

6"

9"

CONCRETE STRIP TO

FOLLOW CURB TAPER

OR AS SHOWN ON CONTRACT PLANS

12" WIDE GABION

WALL FILLED WITH

OPEN-GRADED STONE

3"-THICK LEVELING

COURSE

WRAP GABION WALL IN

GEOTEXTILE (TOP AND

SIDES ONLY)

ROADWAY

WWM 6x6-W8xW8

5'-0"

TOP OF GUTTER

(BEYOND)

SECTION B-B

TREE

PLANTING

AT MIDSECTION [LOWEST POINT]

5'-0" OR AS SHOWN

WRAP GABION WALL IN

GEOTEXTILE (TOP AND

SIDES ONLY)

SIDEWALK

12"x5" PRECAST

CONCRETE STRIP

LOW

POINT

EQ EQ

OPEN-GRADED

STONE BASE

+

12" WIDE GABION

WALL FILLED WITH

OPEN-GRADED STONE

3"-THICK LEVELING

COURSE (TYP.)

ROADWAY

L-SHAPED EDGING WITH

MINIMUM 9" STAKES,

SEE DRAWING GI-204

8" REINFORCED

CONCRETE GUTTER

ROADWAY

SECTION C-C

PLANTED

AREA

SIDEWALK

DROP CURB

[OUTLET]

3-SIDED STEEL TREE PIT

GUARDS SEE DRAWINGS

GI-601A, B, C, D & 602A

AT BIOSWALE OUTLET

5'-0" OR AS SHOWN

STEEL SPIKE IN 4" DIA.

CONCRETE ENCASEMENT

PLACED IN ENGINEERED

SOIL (TYP.)

1'-6"

TO CURB

UNDISTURBED

SOIL

ENGINEERED

SOIL

OPEN-GRADED

STONE BASE

12"x5" PRECAST

CONCRETE

12" WIDE GABION

WALL FILLED WITH

OPEN-GRADED STONE

WRAP GABION WALL IN

GEOTEXTILE (TOP AND

SIDES ONLY)

BA

18"x46"x8" PRECAST

OR POURED

REINFORCED

CONCRETE APRON

REINFORCED CONCRETE

APRON

ROWB A B

WITH TREE 2'-6" 2'-0"

NO TREE 3'-0" 1'-6"

DEPTH SCHEDULE

STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1

- NO CONNECTION TO SEWERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

11-01-2019

FIGURE 1 - PAGE 1 OF 3

REVISED 11/25/2019

AutoCAD SHX Text
GI-101
AutoCAD SHX Text
GI-101
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING & ANALYSIS - GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
Page 7: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

EXISTING

ASPHALT

PAVEMENT

[OUTLET] [INLET]

SIDEWALK

1'-0"

5"-THICK CONCRETE STRIP

FLOW

FLOW

PITCH

TO MATCH EXISTING

ROADWAY

12" 10" 12" 18"

5'-0

" O

R A

S S

HO

WN

1'-0

"

1'-6

"

20'-0" OR AS SHOWN

EXISTING CURB

TO REMAIN

1'-6

"

P

IT

CH

+

8"-THICK REINFORCED

CONCRETE GUTTER

NEW CURB TYPE TO

MATCH CONTRACT PLANS

NEW CURB TYPE TO MATCH

CONTRACT PLANS

CONCRETE TAPER TO

FOLLOW CURB LINE (TYP.)

SEE NOTES BELOW FOR

DEVIATION IN DIMENSIONS

FROM GI STANDARDS

PLACE EXPANSION

JOINT AT MID-SPAN

EXISTING CURB

TO REMAIN

STEEL TREE PIT GUARDS

(3-SIDES TYP.) SEE DRAWING

GI-601A, B, C, D & GI-602A

REINFORCED CONCRETE

APRON

CONCRETE HEADER

EXPANSION JOINT (TYP.)

LIMIT OF NEW CURB TO EXTEND

BEYOND THE ROWB AS DETERMINED BY

FIELD CONDITIONS AND SITE ENGINEER

L-SHAPED EDGING

WITH MINIMUM 9" STAKES

SEE DRAWING GI-204

SURFACE GRADING AS

PER DRAWING GI-124

EXPANSION JOINT

REINFORCED CONCRETE

APRON

GABION WALL BELOW CONCRETE STRIP,

SEE GI-206

14"14" 1'-0"

5'-4"2'-10"

PLAN

DD

+

LOW POINT

SET 1"-3" BELOW

OUTLET INVERT

OUTLET INVERT

12"10"12"

8"

SECTION D-D

ADJACENT 8"-THICK, 18"-WIDE

PRECAST OR POURED

CONCRETE GUTTER, TOP

FLUSH WITH APRON

TYPICAL EXPANSION JOINT

BOTTOM OF CURB

WWM 6x6-W8xW8

EXTENT OF NEW CURB

VARIES PER FIELD CONDITION

16"x30"x8" PRECAST OR POURED

REINFORCED CONCRETE APRON

TOP OF CURB BEYOND

NOTES:

1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36".

ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE

APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS.

2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY

CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL

COMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS.

3. THE CONTRACTOR SHALL OBTAIN THE NECESSARY TREE PLANTING PERMIT FROM THE NYC DEPARTMENT OF PARKS AND RECREATION (DPR) PRIOR TO THE START OF

WORK. ALL NECESSARY TREE PLANTING SHALL BE SUPERVISED BY CERTIFIED ARBORISTS.

4. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR.

5. TREES SHALL BE STAKED AS PER DOT STANDARD DETAILS OF CONSTRUCTION. TREE STAKES ARE TO BE REMOVED BY THE CONTRACTOR NOT LESS THAN ONE YEAR

AFTER PLANTING.

6. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND

COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN

CONSULTATION WITH THE CERTIFIED ARBORIST.

7. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND

OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. BIOSWALE.

8. REPLACEMENT TREES SHALL BE PLANTED WITHIN THE PROJECT AS DIRECTED BY THE ENGINEER IN ACCORDANCE WITH STANDARD HIGHWAY SPECIFICATIONS.

9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACT PLANS DUE TO FIELD CONDITIONS, REFER TO THE

DIMENSION SCHEDULE ON GI-122 AND SPECIFICATIONS.

STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1

- NO CONNECTION TO SEWERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

11-01-2019

FIGURE 1 - PAGE 2 OF 3

REVISED 11/25/2019

AutoCAD SHX Text
GI-102
AutoCAD SHX Text
GI-102
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING & ANALYSIS - GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
Page 8: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

1'-6

"1

'-6

"

1'-0

"

EXISTING

ASPHALT

PAVEMENT

SIDEWALK

FLOW

FLOW

EXISTING CURB

TO REMAIN

+1'-0"

+

LOW POINT

SET 1"-3"

BELOW OUTLET

INVERT

SURFACE

GRADING AS

PER DRAWING

GI-124

CURB LINE

CONCRETE STRIP

(TYP.)

OUTLET INVERT

GABION WALL BELOW

CONCRETE STRIP

PLAN

L-SHAPED

EDGING (TYP.)GABION WALL

BELOW CONCRETE

SEDIMENT PAD

8"-THICK REINFORCED

CONCRETE GUTTER

[OUTLET]

PITCH

[INLET]

10

% M

IN

.

PIT

CH

TO MATCH EXISTING

ROADWAY

B

B

5'-4"2'-10"

1'-6"1'-2"

1'-0"10"1'-0"

1'-2"

CONCRETE GUTTER (TYP)

NEW CURB (TYP)

CONCRETE STRIP

DROP CURB INLET ELEVATION

L-SHAPED EDGING

LEVELING COURSE

HEADER (TYP)

L-SHAPED EDGING

LEVELING COURSE

ISOMETRIC VIEW

N.T.S.

TAPERED SURFACES WITH BRUSHED FINISH (TYP.)

CONCRETE INLET APRON WITH

10% MIN PITCH (TYP)

14" 14"

BOTTOM OF CURB

EXTENT OF NEW CURB

VARIES PER FIELD

CONDITION

HEIGHT OF ADJACENT

ASPHALT PAVEMENT

FLUSH WITH CONCRETE

APRON

ADJACENT 5"-THICK,

18"-WIDE PRECAST

POROUS CONCRETE

FLUSH WITH APRON

REINFORCED CONCRETE

APRON

3"-THICK LEVELING

COURSE

18"

TYPICAL EXPANSION

JOINT

WWM 6x6-W8xW8

8"

5'-4"

SECTION B-B

CONCRETE APRON PITCH SCHEDULE

LONGITUDINAL STREET SLOPE APRON PITCH

≤ 5% 10% - 12%

> 5% 13% - 15%

STANDARD FOR ROWB/ROWGS/ROWRG INLET

FIGURE 1 - PAGE 3 OF 3

REVISED 11/25/2019

AutoCAD SHX Text
GI-201
AutoCAD SHX Text
GI-201
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING & ANALYSIS - GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
Page 9: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

PLAN

AA

5'-0"

CLEAR

SPACE

ROWBROWB

OUTLET INLET

LOCATION OF BIOSWALE

VARIES

FLOW

PROPERTY LINE

CURB LINE

OUTLET INLET

EXISTING

CATCH BASIN

5"-THICK CONCRETE WALKWAY

STEEL TREE PIT GUARD (3 SIDES TYP.) 6" DIA. SLOTTED P.E. CORRUGATED PIPE WRAPPED IN GEOTEXTILE, CAPPED AT BOTH ENDS

CLEAN OUT

EXISTING

CONCRETE

SIDEWALK

CONCRETE

PATH FOOTER

3"

6"

7 7/8"

5'-0"

6" 6"4'-0"

5'-0

"

12"

6"

LENGTH AS SHOWN

SECTION A-A

AT PERFORATED PIPE

21

"

3-SIDED STEEL

TREE PIT GUARDS

ROWB - SIZE VARIES

SIDEWALK

5"-THICK CONCRETE

WALKWAY

3"-THICK LEVELING

COURSE

CONCRETE WALKWAY

FOOTERS

ROWB - SIZE

VARIES

3-SIDED STEEL TREE

PIT GUARDS

CLEAN OUT

SIDEWALK

CONCRETE HEADER

(3) SIDES

WRAP STONE IN

GEOTEXTILE (TOP

AND SIDES ONLY)

PERFORATED

END PLUG

PLANTED

AREA

PLANTED

AREA

GEOTEXTILE

(TOP AND SIDES

ONLY)

6" DIA. SLOTTED P.E. CORRUGATED PIPE

WRAPPED IN GEOTEXTILE AT INTERFACE

OF ENGINEERED SOIL AND STONE BASE

OPEN-GRADED STONE

WRAPPED IN GEOTEXTILE (TOP

AND SIDES ONLY)

PERFORATED

END PLUG

CLEAN OUT

NOTE: USE SMALLER SIZE STORMWATER CHAMBER AS SHOWN ON GI-204 WHEN REQUIRED

STANDARD FOR HYDRAULICALLY CONNECTED R.O.W.B. - PERFORATED PIPE

- NO CONNECTION TO SEWERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

11-01-2019

FIGURE 1A - PAGE 1 OF 2

AutoCAD SHX Text
GI-125
AutoCAD SHX Text
GI-125
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING & ANALYSIS - GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
Page 10: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

PLAN

B

B

AA

5'-0"

CLEAR

SPACE

ROWBROWB

OUTLET INLET

LOCATION OF BIOSWALE

VARIES

FLOW

PROPERTY LINE

CURB LINE

OUTLET INLET

EXISTING

CATCH BASIN

5"-THICK CONCRETE WALKWAY

STEEL TREE PIT GUARD (3 SIDES TYP.) 6" DIA. SLOTTED P.E. CORRUGATED PIPE WRAPPED IN GEOTEXTILE, CAPPED AT BOTH ENDS

CLEAN OUT

EXISTING

CONCRETE

SIDEWALK

CONCRETE

PATH FOOTER

C

C

A

A

SIDEWALK

SECTION A-A

TOP O CURB

PIT

CH

DROP CURB [INLET]

JUTE MESH

ENGINEERED

SOIL

OPEN-GRADED

STONE BASE

1/2" EXPANSION JOINT

AND FILLER PER NYC

DOT HIGHWAY SPEC.

SECTION 2.15 (TYP.)

WRAP STONE IN

GEOTEXTILE

(TOP AND SIDES

ONLY)

AT BIOSWALE INLET

UNDISTURBED SOIL

10%

-11% PLANTED

AREA

CONCRETE

HEADER (3) SIDES

1'-3

"

6"

9"

CONCRETE STRIP TO

FOLLOW CURB TAPER

OR AS SHOWN ON CONTRACT PLANS

12" WIDE GABION

WALL FILLED WITH

OPEN-GRADED STONE

3"-THICK LEVELING

COURSE

WRAP GABION WALL IN

GEOTEXTILE (TOP AND

SIDES ONLY)

ROADWAY

WWM 6x6-W8xW8

5'-0"

TOP OF GUTTER

(BEYOND)

ROADWAY

SECTION C-C

PLANTED

AREA

SIDEWALK

DROP CURB

[OUTLET]

3-SIDED STEEL TREE PIT

GUARDS SEE DRAWINGS

GI-601A, B, C, D & 602A

AT BIOSWALE OUTLET

5'-0" OR AS SHOWN

STEEL SPIKE IN 4" DIA.

CONCRETE ENCASEMENT

PLACED IN ENGINEERED

SOIL (TYP.)

1'-6"

TO CURB

UNDISTURBED

SOIL

ENGINEERED

SOIL

OPEN-GRADED

STONE BASE

12"x5" PRECAST

CONCRETE

12" WIDE GABION

WALL FILLED WITH

OPEN-GRADED STONE

WRAP GABION WALL IN

GEOTEXTILE (TOP AND

SIDES ONLY)

18"x46"x8" PRECAST

OR POURED

REINFORCED

CONCRETE APRON

18"x46"x8" PRECAST OR

POURED REINFORCED

CONCRETE APRON

5'-0" OR AS SHOWN

SECTION B-B

AT WALKWAY

12"

5'-0

" D

EP

TH

E

NT

IR

E B

IO

SW

AL

E

OPEN-GRADED STONE

BASE WRAPPED IN

GEOTEXTILE (TOP AND

SIDES ONLY)6" DIA. SLOTTED P.E.

CORRUGATED PIPE

WRAPPED IN GEOTEXTILE

WRAP STONES IN

GEOTEXTILE (TOP AND

SIDES ONLY)

5"-THICK PRECAST

CONCRETE

WALKWAY

EXPANSION

JOINT (TYP.)

SIDEWALK

3"-THICK

LEVELING

COURSE

8" REINFORCED

CONCRETE GUTTER

ROADWAY

HDPE BARRIER TO

BE INSTALLED

ONLY WHEN

REQUIRED, SEE

GI-204

STANDARD FOR HYDRAULICALLY CONNECTED R.O.W.B. - PERFORATED PIPE

- NO CONNECTION TO SEWERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

11-01-2019

FIGURE 1A - PAGE 2 OF 2

AutoCAD SHX Text
GI-125a
AutoCAD SHX Text
GI-125a
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING & ANALYSIS - GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
Page 11: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

EXISTING

ASPHALT

PAVEMENT

[OUTLET] [INLET]

SIDEWALK

1'-0"

5" THICK CONCRETE

FLOW

FLOW

PITCH

TO MATCH

EXISTING

ROADWAY

2'-10"

1'-0" 10" 1'-0"

5'-4"

18"

5'-0

" O

R A

S S

HO

WN

1'-0

"

1'-6

"

20'-0" OR AS SHOWN

EXISTING CURB

TO REMAIN

1'-6

"

PIT

CH

+

8"-THICK REINFORCED

CONCRETE GUTTER

NEW CURB TYPE TO

MATCH CONTRACT PLANS

1'-0"

NEW CURB TYPE TO MATCH

CONTRACT PLANS

CONCRETE TAPER TO

FOLLOW CURB LINE (TYP.)

SEE NOTES BELOW FOR

DEVIATION IN DIMENSIONS

FROM GI STANDARDS

PLACE EXPANSION

JOINT AT MID-SPAN

EXISTING CURB

TO REMAIN

HDPE DOUBLE-WALLED

CORRUGATED PIPE. SET 1"

BELOW INLET INVERT AND

SECURED WITH 8" LANDSCAPING

STAKES

REINFORCED CONCRETE

APRON

CONCRETE HEADER

EXPANSION JOINT (TYP.)

LIMIT OF NEW CURB TO EXTEND

BEYOND THE ROWB AS DETERMINED BY

FIELD CONDITIONS AND SITE ENGINEER

L-SHAPED EDGING

WITH MINIMUM 9" STAKES

SEE DRAWING GI-204

SURFACE GRADING AS

PER DRAWING GI-124

EXPANSION JOINT

REINFORCED CONCRETE

APRON

GABION WALL BELOW CONCRETE

STRIP, SEE GI-206

1'-2"1'-2"

PLAN

DD

+

LOW POINT

SET 1"-3" BELOW

OUTLET INVERT

OUTLET INVERT

1'-3

"

SOIL DEPRESSION

1" BELOW TOP OF

CORRUGATED PIPE

SEDIMENT CONTROL FOR ROWB/ROWGS/ROWRG

- NO CONNECTION TO SEWERS

FIGURE 1.B

AutoCAD SHX Text
GI-102
AutoCAD SHX Text
GI-102
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING & ANALYSIS - GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
Page 12: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

FLOW

20'-0"LOCATION VARIES

5'-0"

OR

AS

SH

OW

N

A

A EXISTING

CONCRETE

SIDEWALK

EXISTING

CATCH BASIN

C

C

INLET

B

B

CURB LINE

PROPERTY LINE

PLANSCALE: 3/32" = 1' - 0"

OR AS SHOWN

PRECAST CONCRETE

CHAMBER

CONCRETE SURFACE

CONCRETE HEADER

STEEL GRATE (TYP.)

8"-THICK REINFORCED CONCRETE GUTTER

STEEL FACED CURB

OPEN-GRADED

STONE BASE OPEN-GRADED

STONE BASE

ROADWAY

SIDEWALK

SECTION C-C

DROP CURB [INLET]

SLOPE POURED IN PLACE CURB

TO MEET PRECAST CHAMBEROPEN-GRADED

STONE BASE

1/2" EXPANSION JOINT

AND FILLER PER NYC

DOT HIGHWAY SPEC.

SECTION 2.15 (TYP.)

WRAP STONE IN

GEOTEXTILE

(TOP AND SIDES

ONLY)

AT INLET

PRECAST CONCRETE CHAMBER

CONCRETE

HEADER (3) SIDES

1'-3"

STEEL GRATE

5'-0" OR AS SHOWN

4'-3"

2'-6"

5"-THICK CONCRETE TOP

3"-THICK LEVELING

COURSE

3"-THICK LEVELING COURSE

1'-0"

CONSTANT

SLOPE

WWM 6x6-W8xW8

8" DIAMETER

PERFORATED PIPE

(TYP.)

3'-6"

IMPERMEABLE MEMBRANE

CAST IRON

CLEANOUT, SEE

GI-204

WWM 6x6-W8xW8

4" CURB PIECE WITH

TWO #6 REBAR

#4 REBAR ACROSS OPENING

10% MIN-20% MAX PITCH

4"1'-0"4"

SIDEWALK

5'-0" OR AS SHOWN

UNDISTURBED SOIL

3"-THICK LEVELING

COURSE (TYP.)

8" DIAMETER

PERFORATED PIPE

(TYP.)

8" SOLID HDPE PIPE

CAST IRON CLEANOUT -

TOP OF COVER FLUSHED

WITH TOP OF SURFACECONCRETE TOP

WRAP STONE IN

GEOTEXTILE (TOP AND

SIDES ONLY)

SECTION A-AAT UPSTREAM SECTION

ROADWAY

IMPERMEABLE

MEMBRANE

SECTION B-BAT MIDSECTION

5'-0" OR AS SHOWN

WRAP STONE IN

GEOTEXTILE (TOP

AND SIDES ONLY)

5"-THICK

CONCRETE TOP

ROADWAY

3"-THICK LEVELING

COURSE (TYP.)

UNDISTURBED SOIL

8" REINFORCED

CONCRETE GUTTER

STEEL FACE

CURB

5'-0"

8" DIAMETER

PERFORATED PIPE

SIDEWALK

G-CLIP FASTENER

8" REINFORCED

CONCRETE GUTTER

G-CLIP

6"

6"6" 1'-0"

4"

INLET SCREEN BOX

SUPPORT BRACKET

REINFORCED

CONCRETE APRON

1 5

/8"

SEE NOTE 1

1 5

/8"

#4 REBAR ACROSS

STEEL FACE OPENING

4" CURB PIECE WITH TWO

#6 REBAR

L6"x4"x3/8" ACROSS INLET OPENING

WITH 6" BEARING ON EACH SIDE

AT INLET

STEEL FACE

CURB DETAIL

NOTES:

1. 1/2" DIAMETER X 5" HEADED

ANCHOR STUDS (GRANULAR OR

SOLID FLUX FILLED) SHALL BE

PLACED AT 1'-0" MAXIMUM,

CENTER TO CENTER-STAGGERED

AS PER NYCDOT STANDARD

DETAIL, H-1010.

2. STRUCTURAL STEEL SHALL BE

ASTM DESIGNATION A36.

3. SURFACE TO BE CLEANED AND

PAINTED AS PER NYCDOT

STANDARD HIGHWAY

SPECIFICATIONS, SECTION 2.13.

COLOR OF TOP COAT SHALL BE

GRAY AS APPROVED BY THE

ENGINEER.

STANDARD FOR 20'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 1- NO CONNECTION TO SEWERS

FIGURE 2 - PAGE 1 OF 3

REVISED 11/25/2019

Page 13: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

4" 4"

3'-6"

4'-3"

10"

4" 4"

2'-6"

4"

SIDEWALK

TOP OF STEEL GRATE FLUSH

WITH TOP OF SURFACE

3"- THICK LEVELING

COURSE

8" DIAMETER

PERFORATED

PIPE

PRECAST CONCRETE

CHAMBER

5"-THICK CONCRETE TOP

1'-2"

PERFORATED DEBRIS

COVER FOR 8" DIA.

PERFORATED PIPE (TYP.)

3" THICK LEVELING COURSE

SECTION E-E

PERFORATED DEBRIS

COVER FOR 8" DIA. PIPE

WWM 6x6-W8xW8

OPEN-GRADED

STONE

IMPERMEABLE

MEMBRANE

2" X 2" ANGLE BELOW

METAL GRATE ANCHORED

TO CHAMBER WALLS (TYP.)

G-CLIP FASTENER FLUSH

WITH TOP OF METAL GRATE

CONCRETE HEADER

EXPANSION JOINT (TYP.)

EXISTING

ASPHALT

PAVEMENT

[INLET]

SIDEWALK

FLOW

5'-0"

OR

AS

SH

OW

N

20'-0" OR AS SHOWN

10%

MIN

-

20%

MA

X

PIT

CH

PLACE EXPANSION

JOINT AT MID-SPAN

SEE NOTES BELOW FOR

DEVIATION IN DIMENSIONS

FROM GI STANDARDS

EXPANSION JOINT.

TOP OF CLEAN OUT COVER

FLUSH WITH WITH TOP

SURFACE (TYP.)

DD

PRECAST

CONCRETE

CHAMBER

8" DIAMETER

PERFORATED PIPE (TYP.)

CONSTANT SLOPE

FLOW

2'-10"EXISTING CURB

TO REMAIN

EXISTING CURB

TO REMAIN

1'-6"

PLAN

8"-THICK REINFORCED

CONCRETE GUTTER

1'-0"

CLEAN OUT, TYP.

1'-8"

STEEL FACE

OPENING

2'-0"2'-0"

EXTEND THE NEW STEEL FACE 24" MIN.

BEYOND THE INFILTRATION BASIN, THE

LIMIT OF THE NEW CONCRETE CURB

AS DETERMINED BY FIELD CONDITIONS

AND SITE ENGINEER

STEEL GRATE

CONCRETE APRON

5"- THICK CONCRETE

SURFACE

EE

36"13"

1'-0"

8" DIAMETER DUAL

WALL HDPE

FABRICATED 90° BEND

8" DIAMETER DUAL WALL HDPE

FABRICATED 90° BEND (TO BE

PERFORATED IN FIELD)

8" DIAMETER DUAL WALL

HDPE FABRICATED TEE (TO

BE PERFORATED IN FIELD)

8" DIAMETER

EXTERNAL SNAP

COUPLER, (TYP.)

CONSTANT SLOPE2'-4"

6"

2"

OBSERVATION WELL

FLUSH WITH THE SURFACE

CONCRETE APRON PITCH SCHEDULE

CURB REVEAL (INCHES) APRON PITCH

2.5 TO < 3 20% TO ≥ 17%

3 TO < 3.5 17% TO ≥ 14%

3.5 TO < 4 14% TO ≥ 11%

4 TO 4.5 11% TO ≥ 10%

> 4.5 10%

STREET SLOPE

≤ 5% 10% MIN

> 5% 12% MIN

* 2" MINIMUM OPENING TO BE MAINTAINED. UNLESS

ADDITIONAL DIRECTION SHOWN ON DETAILED

CONSTRUCTION DRAWINGS.

1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGSADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36". ANY ADDITIONAL FLAGS DISTURBED BY THISREPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULLCOMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS.

2. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARINGCOURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY CONCRETE PAVEMENT BASE ALONG THE CURBLINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULLCOMPLIANCE WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS.

3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BYTHE ENGINEER AND WITH APPROVAL FROM DPR.

4. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUSTOR OTHER HEAT UPWARD (E.G., GENERATORS AND COMPRESSORS), UNDER THE BRANCHES OF TREES WHERETHE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER INCONSULTATION WITH THE CERTIFIED ARBORIST.

5. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTIONMATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS,BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GIPRACTICE.

7. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OFTHE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.

8. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE MEMBRANE. SEE SPECIFICATIONS FORIMPERMEABLE MEMBRANE REQUIREMENTS.

9. FOR R.O.W. GI PRACTICES WITH DIMENSIONS THAT DEVIATE FROM THE GI STANDARDS AS SHOWN ON CONTRACTPLANS DUE TO FIELD CONDITIONS, REFER TO THE DIMENSION SCHEDULE ON GI-168 AND SPECIFICATIONS.

STANDARD FOR 20'X5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 1- NO CONNECTION TO SEWERS

FIGURE 2 - PAGE 2 OF 3

REVISED 11/25/2019

Page 14: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

EXISTING

ASPHALT

PAVEMENT

SIDEWALK

FLOWFLOW

EXISTING CURB

TO REMAIN

EXISTING CURB

TO REMAIN

L

W1

'-6"

2'-0"2'-0"

TYPE 1/TYPE 2

SURFACE TYPE

PER CONTRACT

PLANS

A A

NEW STEEL FACING CURB

WITH 4" MIN. REVEAL

STREET SLOPE10%

MIN

-

20%

MA

X

PIT

CH

[INLET]

2'-10"

13"

CONSTANT SLOPE

CONSTANT SLOPE2'-4"

36"

EXISTING

ASPHALT

PAVEMENT

SIDEWALK

FLOW

EXISTING CURB

TO REMAIN

EXISTING CURB

TO REMAIN

L

W

1'-6"

SURFACE TYPE

PER CONTRACT

PLANS

TYPE 3

AFLOW

36"

A

[INLET]

10%

MIN

-

20%

MA

X

PIT

CH

13"

2'-10"

STREET SLOPE

CONSTANT SLOPE

CONSTANT SLOPE

2'-4"

NOTES:

1. STANDARD CROSS-SECTIONAL DETAILS AND NOTES AS PER THE R.O.W. INFILTRATION BASIN TYPE SPECIFIED.

2. #4 REBAR TO BE TREATED WITH THE SAME COATING MATERAIL AS THE STEEL FACE CURB

8"

2"

MIN

8" THICK CONCRETE

GUTTER (TYP.)

CONCRETE APRONWWM 6x6 - W8xW8

(TYP)

SECTION A-A

BOTTOM OF CURB

STEEL FACING CURB BEYOND

BOTTOM OF STEEL FACE

36"13"

4"

STREET SLOPE

#4 REBAR ACROSS

STEEL FACE OPENING

STEEL FACE OPENING

28"

36"13"

4"TWO #6 REBAR WITHIN

4" CURB PIECE

28"

1'-6"1'-6"

STEEL FACE

OPENING

#4 REBAR

ACROSS STEEL

FACE OPENING

CONCRETE APRON

STEEL FACING

CURB BEYOND

REBAR DETAIL

6" 6"

DIMENSION SCHEDULE FOR VARIABLE SIZE R.O.W. INFILTRATION BASINS- NO CONNECTION TO SEWERS

FIGURE 2 - PAGE 3 OF 3

REVISED 11/25/2019

Page 15: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

FIGURE 3 - Page 1 of 1

Page 16: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

EXISTING

ASPHALT

PAVEMENT

SIDEWALK

C

2'-4"

EXISTING CURB

TO REMAIN

EXISTING CURB

TO REMAIN

PLAN

+

1'-8

"

2'-0" 2'-0"

FLOW

C

3'-6"

1'-6

"

STEEL FACED

CURB

CONSTANT SLOPE

CONSTANT SLOPE

4'-3

"

CONCRETE GUTTER

(TYP.)

CONCRETE INLET

APRON WITH 10% -

20% PITCH

INLET INVERT

ELEVATION

STEEL FACED CURB

PRECAST CONCRETE

CHAMBER

OPENING FOR 8" DIA.

SLOTTED PIPE

ISOMETRIC VIEW

N.T.S

STEEL GRATE

(PARTIALLY SHOWN

FOR CLARITY)

CONCRETE HEADER

TYP.

ROADWAY

SIDEWALK

SECTION C-C

DROP CURB [INLET]

SLOPE POURED IN PLACE CURB

TO MEET PRE-CAST CHAMBER

OPEN-GRADED

STONE BASE

1/2" EXPANSION JOINT

AND FILLER PER NYC

DOT HIGHWAY SPEC.

SECTION 2.15 (TYP.)

WRAP STONE IN

GEOTEXTILE

(TOP AND SIDES

ONLY)

AT INLET

PRECAST CONCRETE CHAMBER

CONCRETE

HEADER (3) SIDES

1'-3"

STEEL GRATE

5'-0" OR AS SHOWN

4'-3"

2'-6"

5"-THICK CONCRETE TOP

3"-THICK LEVELING

COURSE

3"-THICK LEVELING COURSE

1'-0"

CO

NS

TA

NT

SLO

PE

WWM 6x6-W8xW8

8" DIAMETER

PERFORATED PIPE

(TYP.)

3'-6"

IMPERMEABLE MEMBRANE

CLEANOUT, SEE

GI-204

WWM 6x6-W8xW8

4" CURB PIECE WITH

TWO #6 REBAR

#4 REBAR ACROSS OPENING

10%

M

IN

-

20%

M

A

X

P

IT

C

H

4"1'-0"4"

G-CLIP FASTENER

G-CLIP

4"

INLET SCREEN BOX

SUPPORT BRACKET

18"x42"x8" REINFORCED

CONCRETE APRON

B

B

1/2"

4

5

°

2" x 2" x 1/4"

STEEL ANGLE

GRATING FASTENERS

WITH RECESSED BOLTS

1" x 3/8" BEARING BAR

1" x 3/8" CROSS BAR

3/8" x 4" PLAIN STEEL STUD

TYP.

DETAIL B-B

STEEL BAR GRATE BRACING

STANDARD FOR R.O.W. INFILTRATION BASIN INLET WITH PRECAST CONCRETE CHAMBER

FIGURE 4 - PAGE 1 OF 1

REVISED 11/25/2019

AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING & ANALYSIS - GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
Page 17: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

FIGURE 6 - Page 1 of 1

Page 18: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

FIGURE 7 - Page 1 of 1

freyes
Callout
Clean out - Cast Iron Frame to Receive Cast Iron Cover
freyes
Callout
HDPE PIPE
Page 19: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

EXISTING

ASPHALT

PAVEMENT

SIDEWALK

FLOWFLOW

EXISTING CURB

TO REMAIN

EXISTING CURB

TO REMAIN

PLAN

5"- THICK CAST IN PLACE

OR PRECAST CONCRETE

SURFACE

E

OBSERVATION WELL

FLUSH WITH THE SURFACE

E

SECTION E-E

5'-0" OR AS SHOWN

WRAP STONE IN

GEOTEXTILE (TOP

AND SIDES ONLY)

5"-THICK PRECAST OR CAST

IN PLACE CONCRETE TOP

ROADWAY

8" DIAMETER SLOTTED

HDPE

3"-THICK LEVELING

COURSE (TYP.)

BOTTOM HALF OF

PIPE TO BE SOLID

UNDISTURBED SOIL

IMPERMEABLE MEMBRANE

8" REINFORCED

CONCRETE GUTTER

NEW CURB TYPE PER

THE CONTRACT PLANS

PVC CAP

BENTONITE/CEMENT SEAL

WITH WELL COVER

SIDEWALK

DUCTILE IRON BOLTED

OBSERVATION COVER

WITH GRAY IRON FRAME

4" PVC SLOTTED WELL

SCREEN 0.01 SLOT

SIZE WITH PVC CAP

PVC CAP WITH PRIMER

AND SOLVENT

CEMENT

OBSERVATION WELL

N.T.S

OBSERVATION WELL

- NO CONNECTION TO SEWERS

FIGURE 8 - Page 1 of 1

AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING & ANALYSIS - GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
Page 20: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

STANDARD DESIGNS FORGREEN INFRASTRUCTURE PRACTICES

-TYPE D -

Figure 9

AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 21: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

TABLE OF CONTENTS

SHEET TITLE

COVER SHEET

TOC-01 TABLE OF CONTENTS

GI-N STANDARD NOTES

GI-01 STANDARD FOR 20'X5' R.O.W. BIOSWALE TYPE 1D

GI-02 STANDARD FOR 20'X5' R.O.W. BIOSWALE TYPE 1D

GI-03 STANDARD FOR 20'X5' R.O.W. BIOSWALE TYPE 1DA - WITH STONE COLUMNS

GI-04 STANDARD FOR 20'X5' R.O.W. BIOSWALE TYPE 1DA - WITH STONE COLUMNS

GI-05 STANDARD FOR 15'X5' R.O.W. BIOSWALE TYPE 2D

GI-06 STANDARD FOR 15'X5' R.O.W. BIOSWALE TYPE 2D

GI-07 STANDARD FOR 15'X5' R.O.W. BIOSWALE TYPE 2DA - WITH STONE COLUMNS

GI-08 STANDARD FOR 15'X5' R.O.W. BIOSWALE TYPE 2DA - WITH STONE COLUMNS

GI-09 STANDARD FOR 10'X5' R.O.W. BIOSWALE TYPE 3D

GI-10 STANDARD FOR 10'X5' R.O.W. BIOSWALE TYPE 3D

GI-11 STANDARD FOR 10'X5' R.O.W. BIOSWALE TYPE 3DA - WITH STONE COLUMN

GI-12 STANDARD FOR 10'X5' R.O.W. BIOSWALE TYPE 3DA - WITH STONE COLUMN

GI-13 STANDARD PLANTING PLANS FOR R.O.W. BIOSWALE TYPE 1D

GI-14 STANDARD PLANTING PLANS FOR R.O.W. BIOSWALE TYPE 1D

GI-15 STANDARD PLANTING PLANS FOR R.O.W. BIOSWALE TYPE 2D

GI-16 STANDARD PLANTING PLANS FOR R.O.W. BIOSWALE TYPE 2D

GI-17 STANDARD PLANTING PLANS FOR R.O.W. BIOSWALE TYPE 3D

GI-18 STANDARD PLANTING PLANS FOR R.O.W. BIOSWALE TYPE 3D

GI-19 STORMWATER INLET SECTIONS & DETAILS

GI-20 STANDARD TYPE D SECTIONS & DETAILS

AutoCAD SHX Text
TOC-01
AutoCAD SHX Text
TOC-01
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 22: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

NOTES:

1. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING FULL SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE WITH A MINIMUM WIDTH OF 36".

ANY ADDITIONAL FLAGS DISTURBED BY THIS REPLACEMENT SHALL ALSO BE REPLACED. THE CONTRACTOR SHALL REPLACE THE SIDEWALK IN FULL COMPLIANCE WITH THE

APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS.

2. THE CONTRACTOR SHALL OBTAIN THE NECESSARY TREE PLANTING PERMIT FROM THE NYC DEPARTMENT OF PARKS AND RECREATION (DPR) PRIOR TO THE START OF

WORK. ALL NECESSARY TREE PLANTING SHALL BE SUPERVISED BY CERTIFIED ARBORISTS.

3. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR.

4. TREES SHALL BE STAKED AS PER DOT STANDARD DETAILS OF CONSTRUCTION. TREE STAKES ARE TO BE REMOVED BY THE CONTRACTOR NOT LESS THAN ONE YEAR

AFTER PLANTING.

5. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND

COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN

CONSULTATION WITH THE CERTIFIED ARBORIST.

6. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND

OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. BIOSWALE.

7. REPLACEMENT TREES SHALL BE PLANTED WITHIN THE PROJECT AS DIRECTED BY THE ENGINEER IN ACCORDANCE WITH STANDARD HIGHWAY SPECIFICATIONS.

8. STONE COLUMNS (IF APPLICABLE)

a. 14" DIAMETER CASING TO BE AUGERED TO DEPTH AS DIRECTED BY ENGINEER. 12" DIAMETER PEFORATED PVC PIPE WRAPPED ALL AROUND WITH GEOTEXTILE FABRIC

INSERTED IN THE 14" CASING

F

I

N

A

L

R

E

V

I

S

I

O

N

F

I

N

A

L

D

R

A

W

I

N

G

S

STANDARD NOTES

AutoCAD SHX Text
GI-N
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
AutoCAD SHX Text
GI-N
Page 23: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

F

I

N

A

L

R

E

V

I

S

I

O

N

F

I

N

A

L

D

R

A

W

I

N

G

S

EXISTING

CATCH BASIN

PROPERTY

LINE

B

A

20'-0"

OR AS SHOWN

LOCATION OF BIOSWALE

VARIES, SEE PLAN

CURB LINE

5'-0

"

OR

A

S

SH

OW

N

INLET

EXISTING

CONCRETE

SIDEWALK

A

FLOW

A

B

SEE GI-13 & GI-14 FOR TYPICAL

PLANTING PLANS

STORMWATER INLET

12'x5" PRECAST CONCRETE STRIP

OBSERVATION WELL

CLEAN-OUT AND HDPE PIPE

SEE DETAIL ON DRAWING GI-20

ROWB A B

WITH TREE 3'-0" 2'-0"

NO TREE 3'-6" 1'-6"

DEPTH SCHEDULE

C.I. FRAME AND GRATING

(WITHOUT CURB PIECE)

ROADWAY

SLOPE TO FRAME

WRAP STONE IN

GEOTEXTILE (TOP

AND SIDES ONLY)

CONCRETE

HEADER (3 SIDES)

STEEL TREE PIT GUARDS

(3 SIDES) SEE GI-601A, B, C,

D & GI-602A OF THE GI

STANDARDS

PLANTED AREA, SEE

PLANTING DETAILS

5-#6 @3

2" CLEAR

OPEN-GRADED

STONE BASE

PERFORATED

COVER

8" DIAMETER

HDPE PIPE

EXISTING SOIL

UNDER

HEADERS TO BE

COMPACTED

(TYP.)

SECTION A-A

8"

6"

1'-3

"

9"

TYP.

2"

3'-0

"

5'-2

"

8" 8"3'-6"

9"

WELDED HANDLE

ON MODIFIED C.I.

HOOD, SEE DEP

STANDARDS SE60

6" L. HOOK, SEE

DEP STANDARDS

SE60

1'-0"

BA

TOPSOIL

12"x5" PRECAST

CONCRETE STRIP

3"-THICK LEVELING

COURSE (TYP.)

EQ EQ

TREE PLANTING -

WHEN DIRECTED

+

BRICK BASE - AS

REQUIRED

TOP LAYER 2"-3"

MULCH

SECTION B-B

5'-0" OR AS SHOWN

OPEN-GRADED STONE

BASE WRAPPED IN

GEOTEXTILE, TOP AND

SIDES ONLY

SIDEWALK

ROADWAY

8" DIAMETER HDPE

PIPE WITH CLASS II

PERFORATIONS

9"

(TYP.)

6"

CONCRETE

HEADER

12"

TOP LAYER,

2"-3" MULCH

UNDISTURBED SOIL

STEEL PIKE IN 4" DIA.

CONCRETE ENCASEMENT

UNDISTURBED SOIL

ROADWAY CURB

CLEAN OUT,

SEE GI-20

TOPSOIL

12"x5" PRECAST

CONCRETE STRIP

3"-THICK LEVELING

COURSE (TYP.)

WRAP GABION WALL IN

GEOTEXTILE (TOP AND

SIDES ONLY)

12" WIDE GABION

WALL FILLED WITH

OPEN-GRADED STONE

L-SHAPED EDGING WITH

MINIMUM 9" STAKES,

SEE DRAWING GI-204 OF

THE GI STANDARDS

2'-0"

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1D

- NO CONNECTION TO SEWERS

AutoCAD SHX Text
GI-01
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
AutoCAD SHX Text
GI-01
Page 24: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

EXISTING

ASPHALT

PAVEMENT

SIDEWALK

FLOW

5'-0

" O

R A

S S

HO

WN

20'-0" OR AS SHOWN

EXISTING CURB

TO REMAIN

NEW CURB TYPE TO MATCH

CONTRACT PLANS

PLACE EXPANSION

JOINT AT MID-SPAN

EXISTING CURB

TO REMAIN

STEEL TREE PIT GUARDS

(3-SIDES TYP.) SEE GI-601A, B, C,

D & GI-602A OF THE GREEN

INFRSTRUCTURE STANDARDS

CONCRETE HEADER

EXPANSION JOINT (TYP.)

LIMIT OF NEW CURB TO EXTEND

BEYOND THE ROWB AS DETERMINED BY

FIELD CONDITIONS AND SITE ENGINEER

EXPANSION JOINT

STORMWATER

INLET SEE GI-19

1'-6

"

12"x5" PRECAST

CONCRETE STRIP

OBSERVATION WELL

PLAN

1'-0"

8" DIAMETER PIPE WITH

CLASS II PERFORATIONS

3'-0

"

CLEAN OUT,

REFER TO

DETAILS GI-20

STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1D

- NO CONNECTION TO SEWERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

AutoCAD SHX Text
GI-02
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
AutoCAD SHX Text
GI-02
Page 25: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

PLAN

EXISTING

CATCH BASIN

CURB LINE

STONE COLUMNS

(NO MIDDLE COLUMN IF

PLANTING BED WITH TREE)

20'-0"

4'-6" 5'-6" 5'-6" 4'-6"

.

LOCATION OF BIOSWALE

VARIESOR AS SHOWN

5'-0"

OR

A

S

SH

OW

N

INLET

EXISTING

CONCRETE

SIDEWALK

A

A

B B

FLOW

CLEAN-OUT AND HDPE PIPE

SEE DETAIL ON DRAWING GI-20

SEE GI-13 & GI-14 FOR TYPICAL

PLANTING PLANS

STORMWATER INLET

12'x5" PRECAST CONCRETE STRIP

OBSERVATION WELL

PROPERTY

LINE

SECTION A-A

STONE FILLED PERFORATED

12" DIAMETER PVC PIPE

WRAPPED ALL AROUND

WITH GEOTEXTILE FABRIC.

AT BIOSWALE VERTICAL DRAIN

LE

NG

TH

O

F P

IP

E T

.B

.D

. B

Y E

NG

IN

EE

R

OPEN-GRADED STONE

FINAL DEPTH OF PVC PIPE

TO BE DETERMINED BY

ENGINEER

12"

14"

14" DIAMETER CASING TO

MINIMUM 5'-0" AUGERED

INTO PERMEABLE LAYER

PERMEABLE SOIL

OPEN-GRADED STONE BASE

WRAPPED IN GEOTEXTILE,

TOP AND SIDES ONLY

MIN

5

'-0

" P

EN

ET

RA

TIO

N IN

TO

PE

RM

EA

BL

E S

OIL

L

AY

ER

SIDEWALK

TOP LATER,

2"-3" MULCH

TOPSOIL

1/2" EXPANSION JOINT

AND FILLER PER NYC

DOT HIGHWAY SPEC.

SECTION 2.15 (TYP.)

UNDISTURBED SOIL

PLANTED

AREA

OR AS SHOWN

5'-0"

OR AS SHOWN

STEEL SPIKE IN 4" DIA.

CONCRETE

ENCASEMENT PLACED IN

ENGINEERED SOIL (TYP.)

ROADWAY

TOP OF STONE

COLUMN

CONCRETE

HEADER (3) SIDES

BOTTOM OF COLUMN TO BE

OPEN

1'-0

"

WRAP GABION WALL IN

GEOTEXTILE (TOP AND

SIDES ONLY)

12"x5" PRECAST

CONCRETE STRIP

12" WIDE GABION WALL

FILLED WITH OPEN-GRADED

STONE

3"-THICK LEVELING

COURSE (TYP.)

L-SHAPED EDGING WITH

MINIMUM 9" STAKES, SEE

DRAWING GI-204

CLEANOUT

1'-2"

EQEQ

TOP LAYER,

2"-3" MULCH

SECTION B-B

STEEL TREE PIT GUARDS (3 SIDES TYP.)

SEE GI-601A, B, C, D & GI-602A OF THE GI

STANDARDS

EXISTING

SOIL

MIN

5

'-0

"

PE

NE

TR

AT

IO

N

IN

TO

P

ER

ME

AB

LE

SO

IL

L

AY

ER

PERMEABLE SOIL

LAYER

TOP OF STONE

COLUMN (TYP.)

STONE FILLED PERFORATED 12"

DIAMETER PVC PIPE WRAPPED

ALL AROUND WITH GEOTEXTILE

FABRIC (TYP.)

OPEN BOTTOM (TYP.)

1'-0"

1'-0

"

8" DIAMETER HDPE PIPE WITH

CLASS II PERFORATIONS

SOLID 8" DIAMETER

HDPE PIPE

BA

DEPTH SCHEDULE

ROWB A B

WITH TREE 3'-0" 2'-0"

NO TREE 3'-6" 1'-6"

TOPSOIL

OBSERVATION

WELL

SOLID CLEAN OUT

COVER (TYP.)

PERFORATED

COVER

OPEN-GRADED STONE BASE

WRAPPED WITH GEOTEXTILE

(TOP AND SIDES ONLY)

PVC CAP WITH

PRIMER AND

SOLVENT

CEMENT

PVC CAP

4" PVC SLOTTED

WELL SCREEN 0.01

SLOT SIZE WITH

PVC CAP

STANDARD FOR 20'X5' R.O.W. BIOSWALE TYPE 1DA - WITH STONE COLUMNS

- NO CONNECTION TO SEWERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

AutoCAD SHX Text
GI-03
AutoCAD SHX Text
GI-03
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 26: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

EXISTING

ASPHALT

PAVEMENT

SIDEWALK

FLOW

5'-0

" O

R A

S S

HO

WN

20'-0" OR AS SHOWN

EXISTING CURB

TO REMAIN

NEW CURB TYPE TO MATCH

CONTRACT PLANS

PLACE EXPANSION

JOINT AT MID-SPAN

EXISTING CURB

TO REMAIN

STEEL TREE PIT GUARDS

(3-SIDES TYP.) SEE GI-601A, B, C,

D & GI-602A OF THE GREEN

INFRSTRUCTURE STANDARDS

CONCRETE HEADER

EXPANSION JOINT (TYP.)

LIMIT OF NEW CURB TO EXTEND

BEYOND THE ROWB AS DETERMINED BY

FIELD CONDITIONS AND SITE ENGINEER

EXPANSION JOINT

STORMWATER

INLET SEE GI-19

1'-6

"

12"x5" PRECAST

CONCRETE STRIP

OBSERVATION WELL

4'-6" 5'-6"4'-6"

STONE

COLUMN

5'-6"

STONE

COLUMN

EQ

EQ

PLAN

CLEAN OUT;

REFER TO

DETAILS GI-20

1'-0"

8" DIAMETER PIPE WITH

CLASS II PERFORATIONS

1'-2

"

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

STANDARD FOR 20'X5' R.O.W. BIOSWALE TYPE 1DA - WITH STONE COLUMNS

- NO CONNECTION TO SEWERS

AutoCAD SHX Text
GI-04
AutoCAD SHX Text
GI-04
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 27: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

ROWB A B

WITH TREE 3'-0" 2'-0"

NO TREE 3'-6" 1'-6"

DEPTH SCHEDULE

C.I. FRAME AND GRATING

(WITHOUT CURB PIECE)

ROADWAY

SLOPE TO FRAME

WRAP STONE IN

GEOTEXTILE (TOP

AND SIDES ONLY)

CONCRETE

HEADER (3 SIDES)

STEEL TREE PIT GUARDS

(3 SIDES) SEE GI-601A, B, C,

D & GI-602A OF THE GI

STANDARDS

PLANTED AREA, SEE

PLANTING DETAILS

5-#6 @3

2" CLEAR

OPEN-GRADED

STONE BASE

PERFORATED

COVER

8" DIAMETER

HDPE PIPE

EXISTING SOIL

UNDER

HEADERS TO BE

COMPACTED

(TYP.)

SECTION A-A

8"

6"

1'-3

"

9"

TYP.

2"

3'-0

"

5'-2

"

8" 8"3'-6"

9"

WELDED HANDLE

ON MODIFIED C.I.

HOOD, SEE DEP

STANDARDS SE60

6" L. HOOK, SEE

DEP STANDARDS

SE60

1'-0"

BA

TOPSOIL

12"x5" PRECAST

CONCRETE STRIP

3"-THICK LEVELING

COURSE (TYP.)

EQ EQ

TREE PLANTING -

WHEN DIRECTED

+

BRICK BASE - AS

REQUIRED

TOP LAYER 2"-3"

MULCH

SECTION B-B

5'-0" OR AS SHOWN

OPEN-GRADED STONE

BASE WRAPPED IN

GEOTEXTILE, TOP AND

SIDES ONLY

SIDEWALK

ROADWAY

8" DIAMETER HDPE

PIPE WITH CLASS II

PERFORATIONS

9"

(TYP.)

6"

CONCRETE

HEADER

12"

TOP LAYER,

2"-3" MULCH

UNDISTURBED SOIL

STEEL PIKE IN 4" DIA.

CONCRETE ENCASEMENT

UNDISTURBED SOIL

ROADWAY CURB

CLEAN OUT,

SEE GI-20

TOPSOIL

12"x5" PRECAST

CONCRETE STRIP

3"-THICK LEVELING

COURSE (TYP.)

WRAP GABION WALL IN

GEOTEXTILE (TOP AND

SIDES ONLY)

12" WIDE GABION

WALL FILLED WITH

OPEN-GRADED STONE

L-SHAPED EDGING WITH

MINIMUM 9" STAKES,

SEE DRAWING GI-204 OF

THE GI STANDARDS

2'-0"

F

I

N

A

L

R

E

V

I

S

I

O

N

F

I

N

A

L

D

R

A

W

I

N

G

S

PLAN

EXISTING

CATCH BASIN

PROPERTY

LINE

15'-0"

OR AS SHOWN

LOCATION OF BIOSWALE

VARIES, SEE PLAN

5'-0

"

OR

A

S

SH

OW

N

INLET

CURB LINE

EXISTING

CONCRETE

SIDEWALK

A

FLOW

SEE GI-15 & GI-16 FOR TYPICAL

PLANTING PLANS

STORMWATER INLET

12'x5" PRECAST CONCRETE STRIP

OBSERVATION WELL

CLEAN-OUT AND HDPE PIPE

SEE DETAIL ON DRAWING GI-20

B A

B

STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2D

- NO CONNECTION TO SEWERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

AutoCAD SHX Text
GI-05
AutoCAD SHX Text
GI-05
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 28: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

EXISTING

ASPHALT

PAVEMENT

SIDEWALK

FLOW

5'-0

" O

R A

S S

HO

WN

1'-6

"

15'-0" OR AS SHOWN

EXISTING CURB

TO REMAIN

NEW CURB TYPE TO MATCH

CONTRACT PLANS

PLACE EXPANSION

JOINT AT MID-SPAN

EXISTING CURB

TO REMAIN

STEEL TREE PIT GUARDS

(3-SIDES TYP.) SEE GI-601A, B,

C, D & GI-602A OF THE GREEN

INFRSTRUCTURE STANDARDS

CONCRETE HEADER

EXPANSION JOINT (TYP.)

LIMIT OF NEW CURB TO EXTEND

BEYOND THE ROWB AS DETERMINED BY

FIELD CONDITIONS AND SITE ENGINEER

EXPANSION JOINT

STORMWATER

INLET

SEE GI-19

12"x5" PRECAST

CONCRETE STRIP

OBSERVATION WELL

PLAN

1'-0"

3'-0

"

8" DIAMETER PIPE

WITH CLASS II

PERFORATIONS

CLEAN OUT;

REFER TO

DETAILS GI-20

STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2D

- NO CONNECTION TO SEWERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

AutoCAD SHX Text
GI-06
AutoCAD SHX Text
GI-06
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 29: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

PLAN

EXISTING

CATCH BASIN

SEE GI-15 & GI-16 FOR TYPICAL

PLANTING PLANS

CURB LINE

15'-0"

3'-6" 3'-6"

.

LOCATION OF BIOSWALE

VARIESOR AS

SHOWN

5'-0

"

OR

A

S

SH

OW

N

INLET

STONE COLUMNS

EXISTING

CONCRETE

SIDEWALK

A

A

B B

FLOW

PROPERTY

LINE

STORMWATER INLET

12'x5" PRECAST CONCRETE STRIP

OBSERVATION WELL

CLEAN-OUT AND HDPE PIPE

SEE DETAIL ON DRAWING GI-20

SECTION A-A

STONE FILLED PERFORATED

12" DIAMETER PVC PIPE

WRAPPED ALL AROUND

WITH GEOTEXTILE FABRIC.

AT BIOSWALE VERTICAL DRAIN

LE

NG

TH

O

F P

IP

E T

.B

.D

. B

Y E

NG

IN

EE

R

OPEN-GRADED STONE

FINAL DEPTH OF PVC PIPE

TO BE DETERMINED BY

ENGINEER

12"

14"

14" DIAMETER CASING TO

MINIMUM 5'-0" AUGERED

INTO PERMEABLE LAYER

PERMEABLE SOIL

OPEN-GRADED STONE BASE

WRAPPED IN GEOTEXTILE,

TOP AND SIDES ONLY

MIN

5

'-0

" P

EN

ET

RA

TIO

N IN

TO

PE

RM

EA

BL

E S

OIL

L

AY

ER

SIDEWALK

TOP LATER,

2"-3" MULCH

TOPSOIL

1/2" EXPANSION JOINT

AND FILLER PER NYC

DOT HIGHWAY SPEC.

SECTION 2.15 (TYP.)

UNDISTURBED SOIL

PLANTED

AREA

OR AS SHOWN

5'-0"

OR AS SHOWN

STEEL SPIKE IN 4" DIA.

CONCRETE

ENCASEMENT PLACED IN

ENGINEERED SOIL (TYP.)

ROADWAY

TOP OF STONE

COLUMN

CONCRETE

HEADER (3) SIDES

BOTTOM OF COLUMN TO BE

OPEN

1'-0

"

WRAP GABION WALL IN

GEOTEXTILE (TOP AND

SIDES ONLY)

12"x5" PRECAST

CONCRETE STRIP

12" WIDE GABION WALL

FILLED WITH OPEN-GRADED

STONE

3"-THICK LEVELING

COURSE (TYP.)

L-SHAPED EDGING WITH

MINIMUM 9" STAKES, SEE

DRAWING GI-204

CLEANOUT

1'-2"

EQEQ

STEEL TREE PIT GUARDS (3 SIDES TYP.)

SEE GI-601A, B, C, D & GI-602A OF THE GI

STANDARDS

SECTION B-B

EXISTING SOIL

MIN

5

'-0

"

PE

NE

TR

AT

IO

N

IN

TO

P

ER

ME

AB

LE

SO

IL

L

AY

ER

PERMEABLE SOIL

LAYER

TOP OF STONE

COLUMN (TYP.)

STONE FILLED PERFORATED 12"

DIAMETER PVC PIPE WRAPPED

ALL AROUND WITH GEOTEXTILE

FABRIC (TYP.)

OPEN BOTTOM (TYP.)

BA

DEPTH SCHEDULE

ROWB A B

WITH TREE 3'-0" 2'-0"

NO TREE 3'-6" 1'-6"

1'-0"

SOLID CLEAN OUT

COVER (TYP.)

TOP LAYER,

2"-3" MULCH

1'-0

"

8" DIAMETER HDPE PIPE

WITH CLASS II

PERFORATIONS

OBSERVATION

WELL

4" PVC SLOTTED

WELL SCREEN 0.01

SLOT SIZE WITH

PVC CAP

SOLID 8" DIAMETER

HDPE PIPE

PVC CAP

PERFORATED

COVER

OPEN-GRADED STONE BASE

WRAPPED WITH GEOTEXTILE

(TOP AND SIDES ONLY)

TOPSOIL

PVC CAP WITH

PRIMER AND

SOLVENT

CEMENT

STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2DA - WITH STONE COLUMNS

- NO CONNECTION TO SEWERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

AutoCAD SHX Text
GI-07
AutoCAD SHX Text
GI-07
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 30: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

EXISTING

ASPHALT

PAVEMENT

SIDEWALK

FLOW

5'-0

" O

R A

S S

HO

WN

1'-6

"

15'-0" OR AS SHOWN

EXISTING CURB

TO REMAIN

NEW CURB TYPE TO MATCH

CONTRACT PLANS

PLACE EXPANSION

JOINT AT MID-SPAN

EXISTING CURB

TO REMAIN

STEEL TREE PIT GUARDS

(3-SIDES TYP.) SEE GI-601A, B,

C, D & GI-602A OF THE GREEN

INFRSTRUCTURE STANDARDS

CONCRETE HEADER

EXPANSION JOINT (TYP.)

LIMIT OF NEW CURB TO EXTEND

BEYOND THE ROWB AS DETERMINED BY

FIELD CONDITIONS AND SITE ENGINEER

EXPANSION JOINT

STORMWATER

INLET

SEE GI-19

12"x5" PRECAST

CONCRETE STRIP

OBSERVATION WELL

STONE COLUMNS

3'-6" 3'-6"

EQ

EQ

PLAN

1'-0"

1'-2

"

CLEAN OUT;

REFER TO

DETAILS GI-20

8" DIAMETER PIPE WITH

CLASS II PERFORATIONS

STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2DA - WITH STONE COLUMNS

- NO CONNECTION TO SEWERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

AutoCAD SHX Text
GI-08
AutoCAD SHX Text
GI-08
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 31: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

PLAN

EXISTING

CATCH BASIN

CURB LINE

10'-0"LOCATION OF BIOSWALE

VARIES

OR AS SHOWN

5'-0

"

OR

A

S

SH

OW

N

EXISTING

CONCRETE

SIDEWALK

AB

B A

FLOW

PROPERTY

LINE

SEE GI-17 & GI-18 FOR TYPICAL

PLANTING PLANS

CLEAN-OUT AND HDPE PIPE SEE

DETAIL ON DRAWING GI-20

STORMWATER INLET

12'x5" PRECAST CONCRETE STRIP

OBSERVATION WELL

ROWB A B

WITH TREE 3'-0" 2'-0"

NO TREE 3'-6" 1'-6"

DEPTH SCHEDULE

C.I. FRAME AND GRATING

(WITHOUT CURB PIECE)

ROADWAY

SLOPE TO FRAME

WRAP STONE IN

GEOTEXTILE (TOP

AND SIDES ONLY)

CONCRETE

HEADER (3 SIDES)

STEEL TREE PIT GUARDS

(3 SIDES) SEE GI-601A, B, C,

D & GI-602A OF THE GI

STANDARDS

PLANTED AREA, SEE

PLANTING DETAILS

5-#6 @3

2" CLEAR

OPEN-GRADED

STONE BASE

PERFORATED

COVER

8" DIAMETER

HDPE PIPE

EXISTING SOIL

UNDER

HEADERS TO BE

COMPACTED

(TYP.)

SECTION A-A

8"

6"

1'-3

"

9"

TYP.

2"

3'-0

"

5'-2

"

8" 8"3'-6"

9"

WELDED HANDLE

ON MODIFIED C.I.

HOOD, SEE DEP

STANDARDS SE60

6" L. HOOK, SEE

DEP STANDARDS

SE60

1'-0"

BA

TOPSOIL

12"x5" PRECAST

CONCRETE STRIP

3"-THICK LEVELING

COURSE (TYP.)

EQ EQ

TREE PLANTING -

WHEN DIRECTED

+

BRICK BASE - AS

REQUIRED

TOP LAYER 2"-3"

MULCH

SECTION B-B

5'-0" OR AS SHOWN

OPEN-GRADED STONE

BASE WRAPPED IN

GEOTEXTILE, TOP AND

SIDES ONLY

SIDEWALK

ROADWAY

8" DIAMETER HDPE

PIPE WITH CLASS II

PERFORATIONS

9"

(TYP.)

6"

CONCRETE

HEADER

12"

TOP LAYER,

2"-3" MULCH

UNDISTURBED SOIL

STEEL PIKE IN 4" DIA.

CONCRETE ENCASEMENT

UNDISTURBED SOIL

ROADWAY CURB

CLEAN OUT,

SEE GI-20

TOPSOIL

12"x5" PRECAST

CONCRETE STRIP

3"-THICK LEVELING

COURSE (TYP.)

WRAP GABION WALL IN

GEOTEXTILE (TOP AND

SIDES ONLY)

12" WIDE GABION

WALL FILLED WITH

OPEN-GRADED STONE

L-SHAPED EDGING WITH

MINIMUM 9" STAKES,

SEE DRAWING GI-204 OF

THE GI STANDARDS

2'-0"

STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3D

- NO CONNECTION TO SEWERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

AutoCAD SHX Text
GI-09
AutoCAD SHX Text
GI-09
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 32: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

EXISTING

ASPHALT

PAVEMENT

SIDEWALK

FLOW

5'-0

" O

R A

S S

HO

WN

1'-6

"

10'-0" OR AS SHOWN

EXISTING CURB

TO REMAIN

NEW CURB TYPE TO MATCH

CONTRACT PLANS

EXISTING CURB

TO REMAIN

STEEL TREE PIT GUARDS

(3-SIDES TYP.) SEE DRAWING

GI-601A, B, C, D & GI-602A OF

THE GREEN INFRASTRUCTURE

STANDARDS

CONCRETE HEADER

EXPANSION JOINT (TYP.)

LIMIT OF NEW CURB TO EXTEND

BEYOND THE ROWB AS DETERMINED BY

FIELD CONDITIONS AND SITE ENGINEER

EXPANSION JOINT

STORMWATER

INLET

SEE GI-23

OBSERVATION WELL

12"x5" PRECAST

CONCRETE STRIP

PLAN

1'-0"

8" DIAMETER PIPE WITH

CLASS II PERFORATIONS

CLEAN OUT;

REFER TO

DETAILS GI-20

3'-0

"

STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3D

- NO CONNECTION TO SEWERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

AutoCAD SHX Text
GI-10
AutoCAD SHX Text
GI-10
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 33: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

PLAN

EXISTING

CATCH BASIN

CURB LINE

STONE COLUMN

LOCATION OF BIOSWALE

VARIES

10'-0"

OR AS SHOWN

5'-0

"

OR

A

S

SH

OW

N

1'-6"

EXISTING

CONCRETE

SIDEWALK

A

A

B B

FLOW

PROPERTY

LINE

SEE GI-17 & GI-18 FOR TYPICAL

PLANTING PLANS

CLEAN-OUT AND HDPE PIPE SEE

DETAIL ON DRAWING GI-20

STORMWATER INLET

12'x5" PRECAST CONCRETE STRIP

OBSERVATION WELL

SECTION A-A

STONE FILLED PERFORATED

12" DIAMETER PVC PIPE

WRAPPED ALL AROUND

WITH GEOTEXTILE FABRIC.

AT BIOSWALE VERTICAL DRAIN

LE

NG

TH

O

F P

IP

E T

.B

.D

. B

Y E

NG

IN

EE

R

OPEN-GRADED STONE

FINAL DEPTH OF PVC PIPE

TO BE DETERMINED BY

ENGINEER

12"

14"

14" DIAMETER CASING TO

MINIMUM 5'-0" AUGERED

INTO PERMEABLE LAYER

PERMEABLE SOIL

OPEN-GRADED STONE BASE

WRAPPED IN GEOTEXTILE,

TOP AND SIDES ONLY

MIN

5

'-0

" P

EN

ET

RA

TIO

N IN

TO

PE

RM

EA

BL

E S

OIL

L

AY

ER

SIDEWALK

TOP LATER,

2"-3" MULCH

TOPSOIL

1/2" EXPANSION JOINT

AND FILLER PER NYC

DOT HIGHWAY SPEC.

SECTION 2.15 (TYP.)

UNDISTURBED SOIL

PLANTED

AREA

OR AS SHOWN

5'-0"

OR AS SHOWN

STEEL SPIKE IN 4" DIA.

CONCRETE

ENCASEMENT PLACED IN

ENGINEERED SOIL (TYP.)

ROADWAY

TOP OF STONE

COLUMN

CONCRETE

HEADER (3) SIDES

BOTTOM OF COLUMN TO BE

OPEN

1'-0

"

WRAP GABION WALL IN

GEOTEXTILE (TOP AND

SIDES ONLY)

12"x5" PRECAST

CONCRETE STRIP

12" WIDE GABION WALL

FILLED WITH OPEN-GRADED

STONE

3"-THICK LEVELING

COURSE (TYP.)

L-SHAPED EDGING WITH

MINIMUM 9" STAKES, SEE

DRAWING GI-204

CLEANOUT

1'-2"

EQEQ

SECTION B-B

UNDISTURBED

PERMEABLE

SOIL LAYER

MIN

. 5

'-0

" P

EN

ET

RA

TIO

N IN

TO

PE

RM

EA

BL

E S

OIL

L

AY

ER

1'-0

"

1'-0"

STEEL TREE PIT GUARDS (3 SIDES

TYP.) SEE GI-601A, B, C, D & GI-602A

OF THE GREEN INFRASTRUCTURE

STANDARDS

TOP LAYER, 2"-3"

MULCH

UNDISTURBED SOIL

OBSERVATION

WELL

4" PVC SLOTTED

WELL SCREEN 0.01

SLOT SIZE WITH

PVC CAP

PVC CAP

PVC CAP WITH

PRIMER AND

SOLVENT

CEMENT

SOLID CLEAN OUT

COVER (TYP.)

STONE FILLED PERFORATED 12"

DIAMETER PVC PIPE WRAPPED

ALL AROUND WITH GEOTEXTILE

FABRIC (TYP.)

OPEN BOTTOM (TYP.)

PERFORATED

COVER

OPEN-GRADED STONE BASE

WRAPPED WITH GEOTEXTILE

(TOP AND SIDES ONLY)

8" DIAMETER HDPE PIPE

WITH CLASS II

PERFORATIONS

SOLID 8" DIAMETER

HDPE PIPE

BA

DEPTH SCHEDULE

ROWB A B

WITH TREE 3'-0" 2'-0"

NO TREE 3'-6" 1'-6"

STANDARD FOR 10'X5' R.O.W. BIOSWALE TYPE 3DA - WITH STONE COLUMN

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

- NO CONNECTION TO SEWERS

AutoCAD SHX Text
GI-11
AutoCAD SHX Text
GI-11
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 34: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

EXISTING

ASPHALT

PAVEMENT

SIDEWALK

FLOW

5'-0

" O

R A

S S

HO

WN

1'-6

"

10'-0" OR AS SHOWN

EXISTING CURB

TO REMAIN

NEW CURB TYPE TO MATCH

CONTRACT PLANS

EXISTING CURB

TO REMAIN

STEEL TREE PIT GUARDS

(3-SIDES TYP.) SEE DRAWING

GI-601A, B, C, D & GI-602A OF

THE GREEN INFRASTRUCTURE

STANDARDS

CONCRETE HEADER

EXPANSION JOINT (TYP.)

LIMIT OF NEW CURB TO EXTEND

BEYOND THE ROWB AS DETERMINED BY

FIELD CONDITIONS AND SITE ENGINEER

EXPANSION JOINT

STORMWATER

INLET

SEE GI-23

OBSERVATION WELL

12"x5" PRECAST

CONCRETE STRIP

1'-6"

STONE COLUMN

2'-0

"

PLAN

CLEAN OUT;

REFER TO DETAILS

GI-20

STANDARD FOR 10'X5' R.O.W. BIOSWALE TYPE 3D - WITH STONE COLUMNS

- NO CONNECTION TO SEWERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

AutoCAD SHX Text
GI-12
AutoCAD SHX Text
GI-12
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 35: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

INDUSTRIAL

ROWBS IN COMMERCIAL AND INDUSTRIAL AREAS

(3) C

(6) D

(12) A

(5) B

(3) C

(6) D

(5) B

E

EE

F

F

F

TYPE I

INDUSTRIAL SUN- Type IQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

12 Ech A PERENNIAL ECHINACEA 'CHEYENNE SPIRIT' CONEFLOWER

1-GALLON 18"O.C.10 AA B SHRUB ARONIA ARBUTIFOLIA 'BRILLIANTISSIMA' CHOKEBERRY

6 Snu C GRASSES SORGASTRUM NUTANS INDIAN GRASS

12 Aer D GROUNDCOVER NEPETA 'WALKERS LOW' CATMINT

19 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIES

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE

3 Sne E PERENNIAL SALVIA NEMOROSA GARDEN SAGE 1-GALLON 18" O.C.

3 Snu F GRASSES SORGASTRUM NUTANS INDIAN GRASS

INDUSTRIAL MIXED SUN/SHADE - Type IQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

12 Ala A PERENNIAL ASTER LATERIFLORUS 'LADY INBLACK'

CALICO ASTER

1-GALLON 18"O.C.10 RA B SHRUB RHUS AROMATICA 'GRO LOW' FRAGRANT SUMAC

6 Tfl C GRASSES TRIDENS FLAVUS PURPLETOP12 Mco D GROUNDCOVER MEEHANIA CORDATA CREEPING MINT

19 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIES

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE

3 Cpe E GRASSES CAREX PENNSYLVANICA PENSYLVANIA SEDGE 1-GALLON 18" O.C.

3 CA F SHRUB CEANOTHUS AMERICANUS NEW JERSEY TEA

INDUSTRIAL SHADE - Type IQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING12 Sca A GRASSES CAREX APPALACHICA APPALACHIAN SEDGE

1-GALLON10 RV B SHRUB ROSA VIRGINIANA VIRGINIA ROSE 18"O.C.6 Cla C GRASSES CHASMANTHIUM LATIFOLIUM NORTHERN SEA OATS

12 Cap D PERENNIAL SOLIDAGO CAESIA BLUE STEM GOLDENROD19 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIES

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE3 Pmu E PERENNIAL PYCNANTHEMUM MUTICUM CLUSTERED MOUNTAIN MINT 1-GALLON 18" O.C.

3 Aco F PERENNIAL ASTER CORDIFOLIUS BLUE WOOD ASTER

NOTES:

1. PLANTING LOCATIONS ARE SPECIFIC TO THE ORIENTATION SHOWN. SPECIES AND PLANS

PER DRAWINGS.

2. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO BE PLANTED

WITH SHRUBS, PERENNIALS, OR GRASSES.

3. ALL AREAS ARE TO RECEIVE 3" MULCH COVER UPON PLANTING. MULCH MUST NOT COME

INTO CONTACT WITH WOODY STEMS OF PLANTS.

UNDISTURBED SOIL

OPEN-GRADED STONE

WHEN SPECIFIED, 4 TO 6 PLANTS TO

BE INSTALLED IN PLACE OF TREE

ALL PLANTS PLANTED AT GRADE, NOT ABOVE

OR BELOW, WITHOUT MOUNDED SOIL

TREE PLANTING AS REQUIRED

PLANTING PER DPR STANDARDS

ROOT FLARE OF TREE EXPOSED

NO PLANTING ABOVE TREE ROOT BALL

ENGINEERED SOIL

LOOSEN AND SCORE ROOTS OF ALL

POTTED PLANTS BEFORE PLANTING

18"

ON

CENTER

PLANTING DETAIL

TOP LAYER:

3" MULCH

BULB PLANTING DEPTH IS 2X HEIGHT OF BULB

MULCH SHALL BE 2" AWAY FROM

WOODY STEMS OF TREES AND SHRUBS

PLANTING DETAIL

NOT TO SCALE

PLANTS HAVE WATER RETAINING SOIL

SAUCERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

STANDARD PLANTING PLANS FOR R.O.W. BIOSWALE TYPE 1D

UPDATED: SEPTEMBER 10, 2019

AutoCAD SHX Text
GI-13
AutoCAD SHX Text
GI-13
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 36: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

RESIDENTIAL

ROWBS IN RESIDENTIAL AREAS

TYPE I

(6) C

(4) D

(7) A

(3) B

E

E

E

E

(6) C

(4) D

(7) A

(3) B

RESIDENTIAL SUN GARDEN - Type I

QTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

14 Aer A GROUNDCOVER ASTER ERICOIDES 'SNOWFLURRY'

HEATH ASTER

1-GALLON 18"O.C.6 HC B SHRUB HYPERICUM CALYCINUM ST. JOHN'S WORT

12 Ssc C GRASSES SCHIZACHYRIUM SCOPARIUM LITTLE BLUE STEM

8 Atu D PERENNIAL ASCLEPIAS TUBEROSA BUTTERFLY MILKWEED

17 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIES

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE

2 MP E SHRUB MORELLA PENSYLCANICA BAYBERRY1-GALLON

18" O.C.

2 Hhe F PERENNIAL HELIOPSIS HELIANTHOIDES'SUMMER NIGHTS' SMOOTH OXEYE 18" O.C.

RESIDENTIAL MIXED SUN/SHADE - Type IQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

14 Cfl A GRASSES CAREX FLACCA ‘BLUE ZINGER’ GLACOUS SEDGE

1-GALLON 18" O.C.6 AA B SHRUB ARONIA ARBUTIFOLIA 'BRILLIANTISSIMA' CHOKEBERRY

12 Abl C PERENNIAL AMSONIA 'BLUE ICE' BLUESTAR8 Pvi D GRASSES PANICUM VIRGATUM 'SHENANDOAH' SWITCHGRASS

17 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIES

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE

4 Vsp E/F PERENNIAL VERONICA SPICATA 'GLORY' ROYALCANDLES

SPEEDWELL 1-GALLON 18" O.C.

RESIDENTIAL SHADE GARDEN - Type IQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

14 Mco A GROUNDCOVER MEEHANIA CORDATA CREEPING MINT

1-GALLON 18" O.C.6 CA B SHRUB CEANOTHUS AMERICANUS NEW JERSEY TEA

12 Cla C GRASSES CHASMANTHIUM LATIFOLIUM NORTHERN SEA OATS8 Aco D PERENNIAL ASTER CORDIFOLIUS BLUE WOOD ASTER

17 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIES

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE

2 CA E SHRUB CEANOTHUS AMERICANUS NEW JERSEY TEA1-GALLON 18" O.C.

2 Gma F GROUNDCOVER GERANIUM MACULATUM WILD GERANIUM

NOTES:

1. PLANTING LOCATIONS ARE SPECIFIC TO THE ORIENTATION SHOWN. SPECIES AND PLANS

PER DRAWINGS.

2. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO BE PLANTED

WITH SHRUBS, PERENNIALS, OR GRASSES.

3. ALL AREAS ARE TO RECEIVE 3" MULCH COVER UPON PLANTING. MULCH MUST NOT COME

INTO CONTACT WITH WOODY STEMS OF PLANTS.

UNDISTURBED SOIL

OPEN-GRADED STONE

WHEN SPECIFIED, 4 TO 6 PLANTS TO

BE INSTALLED IN PLACE OF TREE

ALL PLANTS PLANTED AT GRADE, NOT ABOVE

OR BELOW, WITHOUT MOUNDED SOIL

TREE PLANTING AS REQUIRED

PLANTING PER DPR STANDARDS

ROOT FLARE OF TREE EXPOSED

NO PLANTING ABOVE TREE ROOT BALL

ENGINEERED SOIL

LOOSEN AND SCORE ROOTS OF ALL

POTTED PLANTS BEFORE PLANTING

18"

ON

CENTER

TOP LAYER:

3" MULCH

BULB PLANTING DEPTH IS 2X HEIGHT OF BULB

MULCH SHALL BE 2" AWAY FROM

WOODY STEMS OF TREES AND SHRUBS

PLANTING DETAIL

NOT TO SCALE

PLANTS HAVE WATER RETAINING SOIL

SAUCERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

STANDARD PLANTING PLANS FOR R.O.W. BIOSWALE TYPE 1D

UPDATED: SEPTEMBER 10, 2019

AutoCAD SHX Text
GI-14
AutoCAD SHX Text
GI-14
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 37: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

INDUSTRIAL SUN- Type IIQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING10 Ech A PERENNIAL ECHINACEA 'CHEYENNE SPIRIT' CONEFLOWER

1-GALLON 18" O.C.8 AA B SHRUB ARONIA ARBUTIFOLIA

'BRILLIANTISSIMA'CHOKEBERRY

6 Pvi C GRASSES PANICUM VIRGATUM 'SHENANDOAH' SWITCHGRASS10 Aer D GROUNDCOVER NEPETA 'WALKERS LOW' CATMINT14 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIES

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE3 Ehy E PERENNIAL EUPATORIUM HYSSOPIFOLIUM HYSSOP-LEAF THOROUGHWORT

1-GALLON 18" O.C.3 Pvi F GRASSES PANICUM VIRGATUM 'SHENANDOAH' SWITCHGRASS

INDUSTRIAL

ROWBS IN COMMERCIAL AND INDUSTRIAL AREAS

E

EE

F

F

F

(3) C

(5) D

(10) A

(4) B

(3) C

(5) D

(4) B

TYPE II

INDUSTRIAL SHADE- TYPE IIQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING10 Sca A GRASSES CAREX APPALACHICA APPALACHIAN SEDGE

1-GALLON 18" O.C.8 CR B SHRUB ROSA VIRGINIANA VIRGINIA ROSE6 Aco C PERENNIAL ASTER CORDIFOLIUS BLUE WOOD ASTER

10 Cap D PERENNIAL SOLIDAGO CAESIA BLUE STEM GOLDENROD14 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIES

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE6 CR E/F PERENNIAL PYCNANTHEMUM MUTICUM CLUSTERED MOUNTAIN

MINT1-GALLON 18" O.C.

INDUSTRIAL MIXED SUN/SHADE - Type IIQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING10 Ala A PERENNIAL ASTER LATERIFLORUS 'LADY IN

BLACK'CALICO ASTER

1-GALLON 18" O.C.8 RA B SHRUB RHUS AROMATICA 'GRO LOW' FRAGRANT SUMAC

6 Tfl C GRASSES TRIDENS FLAVUS PURPLETOP10 Mco D GROUNDCOVER MEEHANIA CORDATA CREEPING MINT

14 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIESADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE

3 Cpe E GRASSES CAREX PENNSYLVANICA PENSYLVANIA SEDGE 1-GALLON 18" O.C.

3 CA F SHRUB CEANOTHUS AMERICANUS NEW JERSEY TEA

NOTES:

1. PLANTING LOCATIONS ARE SPECIFIC TO THE ORIENTATION SHOWN. SPECIES AND PLANS

PER DRAWINGS.

2. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO BE PLANTED

WITH SHRUBS, PERENNIALS, OR GRASSES.

3. ALL AREAS ARE TO RECEIVE 3" MULCH COVER UPON PLANTING. MULCH MUST NOT COME

INTO CONTACT WITH WOODY STEMS OF PLANTS.

UNDISTURBED SOIL

OPEN-GRADED STONE

WHEN SPECIFIED, 4 TO 6 PLANTS TO

BE INSTALLED IN PLACE OF TREE

ALL PLANTS PLANTED AT GRADE, NOT ABOVE

OR BELOW, WITHOUT MOUNDED SOIL

TREE PLANTING AS REQUIRED

PLANTING PER DPR STANDARDS

ROOT FLARE OF TREE EXPOSED

NO PLANTING ABOVE TREE ROOT BALL

ENGINEERED SOIL

LOOSEN AND SCORE ROOTS OF ALL

POTTED PLANTS BEFORE PLANTING

18"

ON

CENTER

TOP LAYER:

3" MULCH

BULB PLANTING DEPTH IS 2X HEIGHT OF BULB

MULCH SHALL BE 2" AWAY FROM

WOODY STEMS OF TREES AND SHRUBS

PLANTING DETAIL

NOT TO SCALE

PLANTS HAVE WATER RETAINING SOIL

SAUCERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

STANDARD PLANTING PLANS FOR R.O.W. BIOSWALE TYPE 2D

UPDATED: SEPTEMBER 10, 2019

AutoCAD SHX Text
GI-15
AutoCAD SHX Text
GI-15
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 38: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

TYPE II

RESIDENTIAL

ROWBS IN RESIDENTIAL AREAS

(5) C

(4) D

(5) A

(3) B

(5) C

(4) D

(5) A

(3) B

E

E

E

E

RESIDENTIAL SUN GARDEN - Type IIQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING10 Atu A PERENNIAL AESCLEPIAS TUBEROSA BUTTERFLY MILKWEED

1-GALLON 18" O.C.6 HC B SHRUB HYPERICUM CALYCINUM ST. JOHN'S WORT

10 Ssc C GRASSES SCHIZACHYRIUM SCOPARIUM LITTLE BLUE STEM

8 Ami D PERENNIAL ACHILLEA MILLEFOILIUM 'PAPRIKA' YARROW14 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIES

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE2 MP E SHRUB MORELLA PENSYLCANICA BAYBERRY

1-GALLON 18" O.C.2 Hhe F PERENNIAL HELIOPSIS HELIANTHOIDES 'SUMMERNIGHTS' SMOOTH OXEYE

RESIDENTIAL SHADE GARDEN- Type IIQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING10 Mco A GROUNDCOVER MEEHANIA CORDATA CREEPING MINT

1-GALLON 18" O.C.6 CA B SHRUB CEANOTHUS AMERICANUS NEW JERSEY TEA

10 Cla C GRASSES CHASMANTHIUM LATIFOLIUM NORTHERN SEA OATS8 Aco D PERENNIAL ASTER CORDIFOLIUS BLUE WOOD ASTER

14 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIES

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE4 Pmu E/F PERENNIAL PYCNANTHEMUM MUTICUM CLUSTERED MOUNTAIN

MINT1-GALLON 18" O.C.

RESIDENTIAL MIXED SUN/SHADE - Type IIQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

10 Cfl A GRASSES CAREX FLACCA ‘BLUE ZINGER’ GLACOUS SEDGE

1-GALLON 18" O.C.6 AA B SHRUB ARONIA ARBUTIFOLIA 'BRILLIANTISSIMA' CHOKEBERRY

10 Abl C PERENNIAL AMSONIA 'BLUE ICE' BLUESTAR

8 Pvi D GRASSES PANICUM VIRGATUM 'SHENANDOAH' SWITCHGRASS

14 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIESADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE

4 Vsp E/F PERENNIAL VERONICA SPICATA 'GLORY' ROYALCANDLES SPEEDWELL 1-GALLON 18" O.C.

NOTES:

1. PLANTING LOCATIONS ARE SPECIFIC TO THE ORIENTATION SHOWN. SPECIES AND PLANS

PER DRAWINGS.

2. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO BE PLANTED

WITH SHRUBS, PERENNIALS, OR GRASSES.

3. ALL AREAS ARE TO RECEIVE 3" MULCH COVER UPON PLANTING. MULCH MUST NOT COME

INTO CONTACT WITH WOODY STEMS OF PLANTS.

UNDISTURBED SOIL

OPEN-GRADED STONE

WHEN SPECIFIED, 4 TO 6 PLANTS TO

BE INSTALLED IN PLACE OF TREE

ALL PLANTS PLANTED AT GRADE, NOT ABOVE

OR BELOW, WITHOUT MOUNDED SOIL

TREE PLANTING AS REQUIRED

PLANTING PER DPR STANDARDS

ROOT FLARE OF TREE EXPOSED

NO PLANTING ABOVE TREE ROOT BALL

ENGINEERED SOIL

LOOSEN AND SCORE ROOTS OF ALL

POTTED PLANTS BEFORE PLANTING

18"

ON

CENTER

PLANTING DETAIL

TOP LAYER:

3" MULCH

BULB PLANTING DEPTH IS 2X HEIGHT OF BULB

MULCH SHALL BE 2" AWAY FROM

WOODY STEMS OF TREES AND SHRUBS

PLANTING DETAIL

NOT TO SCALE

PLANTS HAVE WATER RETAINING SOIL

SAUCERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

STANDARD PLANTING PLANS FOR R.O.W. BIOSWALE TYPE 2D

UPDATED: SEPTEMBER 10, 2019

AutoCAD SHX Text
GI-16
AutoCAD SHX Text
GI-16
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 39: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

INDUSTRIAL

ROWBS IN COMMERCIAL AND INDUSTRIAL AREAS

E

EE

D

D

D

(3) C

(3) A

(4) B

(3) C

(3) A

(4) B

TYPE III

INDUSTRIAL SUN-Type IIIQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

6 Pvi A PERENNIAL ECHINACEA 'CHEYENNE SPIRIT' CONEFLOWER

1-GALLON 18" O.C.8 Ech B GRASSES PANICUM VIRGATUM 'SHENANDOAH' SWITCHGRASS

6 Aer C GROUNDCOVER NEPETA 'WALKERS LOW' CATMINT

12 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIES

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE3 Sne D PERENNIAL SALVIA NEMOROSA 'CARADONNA' GARDEN SAGE 1-GALLON 18" O.C.

3 MP E SHRUB MORELLA PENSYLVANICA NORTHERN BAYBERRY

INDUSTRIAL MIXED SUN/SHADE Type IIIQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

6 Cpe A GRASSES CAREX PENNSYLVANICA PENSYLVANIA SEDGE

1-GALLON 18" O.C.8 Ala B PERENNIAL ASTER LATERIFLORUS 'LADY IN BLACK' CALICO ASTER

6 Mco C GROUNDCOVER MEEHANIA CORDATA CREEPING MINT

12 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIES

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE3 Tfl D GRASSES TRIDENS FLAVUS PURPLETOP

1-GALLON 18" O.C.3 Rar E SHRUB RHUS AROMATICA 'GRO LOW' FRAGRANT SUMAC

INDUSTRIAL SHADE- Type IIIQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

6 Tvi A GRASSES CAREX APPALACHICA APPALACHIAN SEDGE

1-GALLON 18" O.C.8 Cap B PERENNIAL PYCNANTHEMUM MUTICUM CLUSTERED MOUNTAIN MINT6 Mco C GROUNDCOVER MEEHANIA CORDATA CREEPING MINT

12 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIES

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE6 Aco D/E PERENNIAL ASTER CORDIFOLIUS BLUE WOOD ASTER 1-GALLON 18" O.C.

NOTES:

1. PLANTING LOCATIONS ARE SPECIFIC TO THE ORIENTATION SHOWN. SPECIES AND PLANS

PER DRAWINGS.

2. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO BE PLANTED

WITH SHRUBS, PERENNIALS, OR GRASSES.

3. ALL AREAS ARE TO RECEIVE 3" MULCH COVER UPON PLANTING. MULCH MUST NOT COME

INTO CONTACT WITH WOODY STEMS OF PLANTS.

UNDISTURBED SOIL

OPEN-GRADED STONE

WHEN SPECIFIED, 4 TO 6 PLANTS TO

BE INSTALLED IN PLACE OF TREE

ALL PLANTS PLANTED AT GRADE, NOT ABOVE

OR BELOW, WITHOUT MOUNDED SOIL

TREE PLANTING AS REQUIRED

PLANTING PER DPR STANDARDS

ROOT FLARE OF TREE EXPOSED

NO PLANTING ABOVE TREE ROOT BALL

ENGINEERED SOIL

LOOSEN AND SCORE ROOTS OF ALL

POTTED PLANTS BEFORE PLANTING

18"

ON

CENTER

TOP LAYER:

3" MULCH

BULB PLANTING DEPTH IS 2X HEIGHT OF BULB

MULCH SHALL BE 2" AWAY FROM

WOODY STEMS OF TREES AND SHRUBS

PLANTING DETAIL

NOT TO SCALE

PLANTS HAVE WATER RETAINING SOIL

SAUCERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

STANDARD PLANTING PLANS FOR R.O.W. BIOSWALE TYPE 3D

UPDATED: SEPTEMBER 10, 2019

AutoCAD SHX Text
GI-17
AutoCAD SHX Text
GI-17
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 40: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

TYPE III

RESIDENTIAL

ROWBS IN RESIDENTIAL AREAS

D

D

D

(4) C

(3) A

(5) B

(4) C

(3) A

(5) B

D

RESIDENTIAL SUN GARDEN - Type IIIQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

6 Aer A GROUNDCOVER ASTER ERICOIDES 'SNOW FLURRY' HEATH ASTER

1-GALLON 18" O.C.10 Ssc B GRASSES SCHIZACHYRIUM SCOPARIUM LITTLE BLUE STEM8 Ami C PERENNIAL ACHILLEA MILLEFOILIUM 'PAPRIKA' YARROW

12 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIESADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE

2 MP D SHRUB MORELLA PENSYLCANICA BAYBERRY 1-GALLON 18" O.C.2 Hhe E PERENNIAL HELIOPSIS HELIANTHOIDES 'SUMMER

NIGHTS' SMOOTH OXEYE

RESIDENTIAL SHADE GARDEN- Type IIIQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

6 Cpe A GRASSES CAREX PENSYLVANICA PENNSYLVANIA SEDGE

1-GALLON 18" O.C.10 Gma B GROUNDCOVER GERANIUM MACULATUM WILD GERANIUM

8 Pmu C PERENNIAL PYCNANTHEMUM MUTICUM CLUSTERED MOUNTAINMINT

12 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIES

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE

2 CA D SHRUB CEANOTHUS AMERICANUS NEW JERSEY TEA1-GALLON

18" O.C.

2 Gma B GROUNDCOVER GERANIUM MACULATUM WILD GERANIUM

RESIDENTIAL MIXED SUN/SHADE Type IIIQTY KEY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

6 Cfl A GRASSES CAREX FLACCA ‘BLUE ZINGER’ GLACOUS SEDGE

1-GALLON 18" O.C.10 Abl B PERENNIAL AMSONIA 'BLUE ICE' BLUESTAR

8 Pvi C GRASSES PANICUM VIRGATUM 'SHENANDOAH' SWITCHGRASS

12 Ndu PERENNIAL NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB VARIES

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE

2 AA D SHRUB ARONIA ARBUTIFOLIA 'BRILLIANTISSIMA' CHOKEBERRY1-GALLON 18" O.C.2 Cfl E GRASSES CAREX FLACCA ‘BLUE ZINGER’ GLACOUS SEDGE

NOTES:

1. PLANTING LOCATIONS ARE SPECIFIC TO THE ORIENTATION SHOWN. SPECIES AND PLANS

PER DRAWINGS.

2. THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO BE PLANTED

WITH SHRUBS, PERENNIALS, OR GRASSES.

3. ALL AREAS ARE TO RECEIVE 3" MULCH COVER UPON PLANTING. MULCH MUST NOT COME

INTO CONTACT WITH WOODY STEMS OF PLANTS.

UNDISTURBED SOIL

OPEN-GRADED STONE

WHEN SPECIFIED, 4 TO 6 PLANTS TO

BE INSTALLED IN PLACE OF TREE

ALL PLANTS PLANTED AT GRADE, NOT ABOVE

OR BELOW, WITHOUT MOUNDED SOIL

TREE PLANTING AS REQUIRED

PLANTING PER DPR STANDARDS

ROOT FLARE OF TREE EXPOSED

NO PLANTING ABOVE TREE ROOT BALL

ENGINEERED SOIL

LOOSEN AND SCORE ROOTS OF ALL

POTTED PLANTS BEFORE PLANTING

18"

ON

CENTER

TOP LAYER:

3" MULCH

BULB PLANTING DEPTH IS 2X HEIGHT OF BULB

MULCH SHALL BE 2" AWAY FROM

WOODY STEMS OF TREES AND SHRUBS

PLANTING DETAIL

NOT TO SCALE

PLANTS HAVE WATER RETAINING SOIL

SAUCERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

STANDARD PLANTING PLANS FOR R.O.W. BIOSWALE TYPE 3D

UPDATED: SEPTEMBER 10, 2019

AutoCAD SHX Text
GI-18
AutoCAD SHX Text
GI-18
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 41: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

CC

EXISTING

ASPHALT

PAVEMENT

SIDEWALK

FLOW

EXISTING CURB

TO REMAIN

NEW CURB TYPE TO MATCH

CONTRACT PLANS

EXISTING CURB

TO REMAIN

STEEL TREE PIT GUARDS

(3-SIDES TYP.) SEE GI-601A, B, C, D &

GI-602A OF THE GREEN

INFRSTRUCTURE STANDARDS

CONCRETE HEADER

LIMIT OF NEW CURB TO EXTEND

BEYOND THE ROWB AS DETERMINED

BY FIELD CONDITIONS AND SITE

ENGINEER

EXPANSION JOINT

CLEAN OUT;

REFER TO

DETAILS GI-20

STORMWATER

INLET (ALTERNATE

LOCATION PER DEP

APPROVAL)

1'-0"

8" DIAMETER PIPE WITH CLASS II

PERFORATIONS, SEE CORRESPONDING

ROW TYPE FOR CORRECT PIPE

PLACEMENT WITHIN THE PRACTICE

5" THICK CONCRETE

1'-0

"

1'-6

"

GABION WALL UNDER

CONCRETE TRIP

PLAN [WITH CASTING]

CAST IRON FRAME

[WITHOUT CURB PIECE]

AND GRATING , SEE DEP

STANDARDS SE58 & SE59

5'-4"

4'-10"

FACE OF

ROADWAY

CURB

CONCRETE HEADER

GABION

WALL

12"x5"

CONCRETE

STRIP

STORMWATER INLET

(BRICK COURSE ABOVE

NOT SHOWN FOR

CLARITY)

LEVELING

COURSE

E-EE-E

3'-0

"

EQ

SECTION C-C

9"

4'-6

"8

"

OPEN-GRADED

STONE BASE

5-#6@3" OC

STORMWATER

INLET

OPENING FOR 8" DIA.

PIPE WITH

PERFORATED COVER

SIDEWALK

HEADER

5'-4"

E E

FF

2"

12"x5" PRECAST

CONCRETE STRIP

WELDED HANDLE

ON MODIFIED C.I.

HOOD, SEE DEP

STANDARDS SE60

EQ

LEVELING

COURSE

BRICK COURSE.

AS REQUIRED

EXISTING SOIL

E-E

8"8" 4'-0"

PLAN [WITH REINFORCEMENT]

3"

1'-4

"

5-#6@3"

2'-2

"8

"8

"

GABION

WALL

F-F

E-E

STORMWATER INLET SECTIONS & DETAILS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

- NO CONNECTION TO SEWERS

AutoCAD SHX Text
GI-19
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
AutoCAD SHX Text
GI-19
Page 42: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

SOLID 45° BEND

8" DIAMETER PIPE

WITH CLASS II

PERFORATIONS

STORMWATER INLET

PERFORATED

COVER (TYP.)

EQ

TYPICAL PIPE/STORMWATER

INLET CONNECTION

EQ

GRADESOLID CLEAN OUT

COVER

COVER

N.T.S.

CLEAN-OUT DETAIL - HDPE PIPE

45° BEND

SOLID DRAIN

BODY

PERFORATED

END PLUG

CONCRETE

POUR RING

(TYP.)

2% SLOPE

WYE FITTING

SOIL LAYER

OPEN-GRADED

STONE LAYER

GEOTEXTILE

FABRIC

FROM INLET

FLOW

8" DIAMETER PIPE

WITH CLASS II

PERFORATIONS

STANDARD TYPE D SECTIONS AND DETAILS

- NO CONNECTION TO SEWERS

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

07-31-2019

AutoCAD SHX Text
GI-20
AutoCAD SHX Text
GI-20
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING AND ANALYSIS - GREEN INFRASTRUCTURE
Page 43: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

September 6, 2019 Revised 11/25/2019

Jennifer Cass Vice President & Chief of Staff, Capital Program NYC Economic Development Corporation One Liberty Plaza New York, NY 10006

Subject: Planting Plan Updates for Construction Use

Dear Ms. Cass

DEP would like to distribute the latest updates to the Planting Plans. Please find attached, changes to the Planting Plans for ROW Bioswales and Greenstrips. (Revisions shown in red) The following changes to the new plan include:

1. Container sizes are now all 1- gallon containers (were #1, #2, #3, and #5).2. Quantities have been reduced and everything has the same spacing (18” O.C.).3. Residential and Urban Palettes have been eliminated.4. Palettes are based on more site analysis as they refer to:

a. How wet or dry the asset is expected to beb. How sunny or shady the asset is expected to be.

5. Bulbs are added in clusters in the perimeter6. Updates to the Planting Specifications7. Plant quantities have been reduced at inlet to allow space for sediment control device.

To facilitate in the transition from the 2017 Plan to the 2019 Plan, consult the table below to make substitutions for planting plans already assigned to assets. When deciding between the two choices, where possible, consider which side of the street the asset is located on (North, South, East, West), location of tall buildings, and known information about flow direction, and proximity to catch basins (i.e. location in TDA).

Standard ROW Bioswales:

2017 Plan 2019 Plan

Plan Version Residential 1 A Combination Wet/Dry- Mixed Sun and Shade

B Dry- Mixed Sun/Shade Residential 2 A Wet- Sunny*

B Wet- Mixed Sun/Shade* Urban 1 A Wet- Mixed Sun/Shade

B Wet- Sunny Urban 2 A Wet Shady*

B Combination Wet/Dry- Sunny Urban 3 A Dry- Mixed Sun/Shade

B Dry- Sunny Shady Plan A Combination Wet/Dry - Shady

B Combination Wet/Dry - Shady Dry Plan A Dry- Mixed Sun/Shade

B Dry- Shady

Vincent Sapienza, P. E. Commissioner

Angela Licata Deputy Commissioner Bureau of Sustainability

59-17 Junction Blvd, 11th Floor, LeFrak City, NY, 11368

Tel. (718) 595-4398 [email protected]

Page 44: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

Wet Plan A Combination Wet/Dry - Sunny B Wet- Sunny

*Note: North side: Sunny South side: Shady

East/West: Mixed Sun/Shade Note: Palettes with broadest range of tolerances:

- Combination Wet/Dry Sites- Shady- Dry Sites - Mixed Sun and Shade

2017 Plan 2019 Plan GreenStrips: Full Sun Plan 1 Dry- Sunny Sun/Part Shade Plan 1 Combination Wet/Dry - Mixed Sun/Shade Full Sun Plan 2 Combination Wet/Dry - Sunny Sun/Part Shade Plan 2 Wet- Shade Residential Plan,Wet, Sun to Part Shade Combination Wet/Dry - Sunny Residential Plan, Sun and Dry- 1 Combination Wet/Dry - Sunny Residential Plan Sun and Dry- 2 Wet- Mixed Sun/Shade

Planting Schedule Expansion Unless otherwise directed by the Engineer in writing, the contractor shall perform actual planting only when weather and soil conditions are suitable for optimal benefit to the plant. Contractor is expected to secure plant material months in advance (6 months is ideal) to ensure availability at anticipated time of planting. No plant material shall be planted when the ground is frozen or in excessively moist condition. Contractor shall also provide water to the plants as necessary if conditions are expected to be dry and hot. Upon completion of installation, contractor shall install a silt sock, weighted sediment tube or approved equal in the inlet of the practice to protect plants during the establishment period.

Planting seasons are as follows: Spring Evergreen April 1 to May 15 Deciduous March 1 to May 15 Herbaceous April 15 to May 15 Fall* Evergreen September 1 to October 15 Deciduous September 15 to December 15 Herbaceous August 15 to October 1

*Note: Unless approval is obtained by DPR, the following is a list of trees considered unsuitable for fall planting due to the high risk of failure (aka. “Fall Dig Hazard Trees”). These trees may be planted in the fall but must be dug in the spring and held over:

Scientific Name Common Name Acer rubrum Red Maple Betula sp. Birches Carpinus sp. Hornbeams Celtis sp. Hackberries

Page 45: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

Cercis sp. Redbuds Cornus sp. Dogwoods Crataegus sp. Hawthornes Halesia sp. Silverbells Koelreuteria paniculata Golden raintree Liquidambar styraciflua Sweetgum Malus sp. Crabapples Nyssa sylvatica Black Gum Ostrya virginiana Hophornbeam Prunus All stone fruits: Plum, cherry etc. Platanus sp. Planetrees Quercus sp. Oaks Taxodium distichum Bald Cyprus Tilia tomentosa Silver Linden Ulmus parvifolia Chinese Elm Zelcova serrata Zelcovas

Thank you for your assistance in the distribution of these new designs. Please reach out to Sarah Bray at 718-595-4426 or [email protected] with any questions.

Sincerely,

Adriana Kocovic, PMP, ENV SP Director ROW Green Infrastructure Design and Construction Bureau of Environmental Planning and Analysis NYC Environmental Protection

c. P. BalciF. ReyesA. Garcia

Page 46: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast
Page 47: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast
Page 48: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast
Page 49: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast
Page 50: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

FIGURE 11

GI- 202, 203

"LOCATION AND ANGLE OF 8" PVC OUTLET PIPE

MAY BE VARIED TO SUIT FIELD CONDITIONS."

UTILITY CROSSING DETAIL

Location: Plans and Sections

GI- 204

LOCATION AND ANGLE OF 8" HDPE OUTLET PIPE MAY BE VARIED TO SUIT

FIELD CONDITIONS.

Location: Note (2) for GI-202 and Note (3) for GI -203

11

9

8

Location:

Location: Plan

"4" - THICK PRECAST CONCRETE"

"CONCRETE TRENCH COVER" Replace with: "STEEL GRATE"

Overlapping text clarification 36" L x 12" W x 6"H EPOXY BONDED STONE STRIP BED

Location: Overall Plans (showing property line, catch basin, roadway, etc.)

5"- THICK PRECAST CONCRETE

Location:

Section B-B

Both 8-Inch Pipes shown in the Concrete Chamber are

not full perforatedPipe is NOT to fully slotted

The Stone Columns are centered between the Header & the Gabion WallNo dimension noted for the offset of the stone

columns off of the back header.

"80 MIL HDPE BARRIER; LENGTH OF GI PRACTICE

WITH 12" TOE."

GI -103, 104, 111, 112,

119, 120, 138, 139,

144, 145, 150, 151,

154, 155, 160, 161,

166, 167

GI - 133

REINFORCED PRECAST CONCRETE CULVERT WITH COVER

Location:

Location: Plan

"Standard for 10'x5' ROW Infiltration Basin with

Precast Concrete Top Type 3A" New Title: "Standard for 10'x5' ROW Infiltration Basin with Grass Top Type 3A"

Clarification needed to show where the Trapezoid

Header ends and the Concrete Walkway Footers

commence at the middle walkway

Sketch was provided, showing that the Walkway Footers support the two sides of the

walkway

GI - 169

GI - 125

REV

NO.

GI-101 thru GI-133

GI - 129

Location: Section B-B

Location:

"POURED OR PRECAST CONCRETE WALKWAY"

5" - THICK PRECAST CONCRETE COVER

Section B-B

Location: Title

GI - 166

Plan

GI - 148, 150

GI-167, GI-170

3

Plan

"54" - 60" MAX. DEPTH"

"PRECAST CONCRETE"

" 5"- THICK PRECAST POROUS CONCRETE"

These modifications apply to the latest "NYCDEP BEDC-GI Standard Design and Guidelines for Green Infrastructure Practices" Released

on July 19, 2017.

60" MAX. DEPTH

SHEET NO. EXISTING MODIFICATION

PRECAST OR POURED IN PLACE CONCRETE

7

6

4

2

Location:

12 GI - 304

Refer to Standard Detail GI-204, the use of the 80mil HDPE Barrier as shown on the

Utility Crossing Detail is required only when noted on the Contract Drawing Plans or

when directed by the Engineer. 15

14

13

Copy of 08212019_Running LIST OF Modifications to the DEP GI Standard Details_REVISIONS FOR MEMO_comments 9/9/2019

Page 51: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

BROKEN STONE BERM to be filled with 1 1/2" CLEAN OPEN GRADED STONE.

Disregard the note about the 2" depth.

Location: Plan; Section A-A; Section B-B;

METAL BAR GRATE, FRAME AND PATHWAY DETAILSLocation:

GI- 136 thru 170 and

206, 207, 302, 306,

308, 312

SECTIONS & DETAILS

GI- 204L-SHAPED EDGING

The allowable size of the L-shaped edging has been modified and drainage holes are

optional , see sketch.

Location:

The stormwater chamber does not need to be HDPE. Please refer to the updated

Dimension Schedule. Note: The minimum acceptable storage volume within the

stormwater chamber unit alone must be 2 cubic feet per linear foot.

Location:

EXISTING

"Engineered Soil"

MODIFICATION

"Engineered Soil & Sand"

Typical clarifications throughout "NYCDEP BEDC-GI Standard Design and Guidelines for Green Infrastructure Practices"

4. A leveling course beneath the Concrete Header is not necessary, it sits atop the undisturbed soil.

3. HDPE Barrier - placed at the back of the GI practice [along the pedestrian pathway] - will be required, as noted on the contract plans, if utilities not shown on the contract plans are encountered during construction or when directed by the engineer

2. Gabion Wall shall be extended to the base of the GI Practice except for Type C GI practices, which are restricted due to the stormwater chamber, as well as stormwater

greenstreets. See standards for further clarification.

General Notes & Comments

1. Concrete curbs have a minimum depth of 18-inches. Whenever there is a drop/rise of curb, curb depth shall be maintained at a minimum of 18 inches. All new CURBS,

shall have a minimim height of 4-inches, contractor to work with Engineer on how to taper to meet field conditions, whenever feasible.

"Trapezoid Concrete Header""Concrete Header"

[W x H]* Gabion Wall

Stone Strip "Epoxy Bonded Stone Strip"

"Curb type to match contract plans and to be built as per NYC DOT Standard Details".

"12-inch wide Gabion Wall"

"Curb type to match contract plans"

"PRECAST CONCRETE TRENCH" "PRECAST CONCRETE CHAMBER"

L-Shaped Edging Detail

The word "METAL" shall be replaced with "STEEL" in all notations regarding the Bars,

Grates and Frames

GI- 302, 306, Replace the word "MULCH" Change to "Jute Mesh"

Location: Section B-B;

Stormwater Chamber Detail

21

20

19

18

17 GI- 204STORMWATER CHAMBER

GI- 310, GI-311BIOFILTER

Copy of 08212019_Running LIST OF Modifications to the DEP GI Standard Details_REVISIONS FOR MEMO_comments 9/9/2019

freyes
Polygon
freyes
Polygon
Page 52: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

2D

3"

3"

1'-0"

D

80 MIL HDPE BARRIER;

LENGTH OF GI

PRACTICE WITH 12"

TOE. SEE NOTES

PLANTED

AREA

SIDEWALK

CURB

TREE PIT GUARD

WATER

UTILITY

DUCT

CONCRETE

COLLAR (TYP.)

INTERFACE BETWEEN

COLLAR AND HDPE

BARRIER TO BE SEALED

WITH WATERPROOF

SEALANT. SEE NOTES

ENGINEERED

SOIL

OPEN-GRADED

STONE BASE

WATERTIGHT EXPANDING

FOAM SEALANT IN HDPE

SPLIT SLEEVE (THROUGH

ENTIRE SLEEVE)

WRAP STONES IN

GEOTEXTILE (TOP

AND SIDES ONLY)

6" DIA. CONCRETE

PIER BEYOND

CONCRETE STRIP

A

A

SECTION

18"

BB

SURVEY MARKER

D

2D

3"

3"

2D

+

6

"

HDPE

BARRIER.

SEE NOTES

CLASS B CONCRETE COLLAR

WATERTIGHT EXPANDING

FOAM SEALANT BETWEEN

UTILITY AND HDPE SPLIT

SLEEVE (THROUGH

ENTIRE SLEEVE)

WATER UTILITY

WATER UTILITY CROSSING DETAIL

N.T.S.

CROSS SECTION A-A

6"

ONLY IF WATER SERVICE IS

ENCOUNTERED: ADDITIONAL

SLEEVE TO BE CONSTRUCTED

FOR FUTURE WATER

SERVICE. SOLID PVC PIPE TO

BE CAPPED AT BOTH ENDS.

LOCATION TO BE MARKED AT

BOTH ENDS OF CONCRETE

HEADER.

2D

SOLID PVC PIPE

TO BE CAPPED AT

BOTH ENDS

WATERTIGHT

EXPANDING FOAM

SEALANT IN HDPE

SPLIT SLEEVE

(THROUGH ENTIRE

SLEEVE)

WATER

UTILITY DUCT

SOLID PVC PIPE

FOR FUTURE

WATER SERVICE

18"

6"

12

"

PLAN B-B

SURVEY

MARKER

CLASS B

CONCRETE

COLLAR

SOLID PVC PIPE

SIDEWALK

ROADWAY

NOTES:

1. HDPE BARRIER TO BE INSTALLED WHEN THERE IS A

UTILITY CROSSING AND WHEN THERE IS LESS THAN

10' FROM THE ASSET TO THE BUILDING LINE.

2. ANY SEAMS IN THE HDPE BARRIER MUST HAVE A 1'-0"

OVERLAP AND BE SEALED WITH WATERTIGHT

SEALANT

3. ADDITIONAL SLEEVE WITH PVC PIPE TO EXTEND 1'-6"

OUTWARD OF BOTH SIDES OF GI PRACTICE.

4. SPLIT PVC PIPE SHALL BE USED TO SLEEVE THE

EXISTING WATER SERVICE LINE AND SOLID PVC PIPE

SHALL BE USED FOR THE SPARE SLEEVE.

WATER SERVICE SLEEVING DETAIL

P.E.

DATEDIRECTOR, ON SITE GREEN INFRASTRUCTURE DESIGN AND CONSTRUCTION

DEPARTMENT OF ENVIRONMENTAL PROTECTION

11-01-2019

BLANK UTILITY SLEEVE

MARKER DETAIL

NOTE: PROVIDE MANUFACTURER OR APPROVED

EQUAL

FIGURE 12

AutoCAD SHX Text
GI-204a
AutoCAD SHX Text
GI-204a
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING & ANALYSIS - GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
Page 53: MEMORANDUM - New York...ii. 30” HDPE double-wall corrugated pipe to be used along 8” landscaping stakes iii. See attached Figure 1.B. *All concrete can either be precast or cast

2D

3"

3"

1'-0"

D

80 MIL HDPE BARRIER;

LENGTH OF GI

PRACTICE WITH 12"

TOE. SEE NOTES

PLANTED

AREA

SIDEWALK

CURB

TREE PIT GUARD

UTILITY

DUCT

CONCRETE

COLLAR (TYP.)

INTERFACE BETWEEN

COLLAR AND HDPE

BARRIER TO BE SEALED

WITH WATERPROOF

SEALANT. SEE NOTES

ENGINEERED

SOIL

OPEN-GRADED

STONE BASE

WATERTIGHT

EXPANDING FOAM

SEALANT IN HDPE SPLIT

SLEEVE (THROUGH

ENTIRE SLEEVE)

WRAP STONES IN

GEOTEXTILE (TOP

AND SIDES ONLY)

6" DIA. CONCRETE

PIER BEYOND

PRECAST

CONCRETE STRIP

A

A

SECTION

NOTES:

1. HDPE BARRIER TO BE

INSTALLED WHEN THERE IS

A UTILITY CROSSING AND

WHEN THERE IS LESS THAN

10' FROM THE ASSET TO

THE BUILDING LINE.

2. ANY SEAMS IN THE HDPE

BARRIER MUST HAVE A 1'-0"

OVERLAP AND BE SEALED

WITH WATERTIGHT

SEALANT.

D

2D

3" 3"

2D + 6"

2D + 6"

CROSS SECTION A-A

HDPE

BARRIER

CLASS B CONCRETE COLLAR

WATERTIGHT EXPANDING FOAM

SEALANT BETWEEN UTILITY AND

PVC SPLIT SLEEVE (THROUGH

ENTIRE SLEEVE)

UTILITY

UTILITY CROSSING DETAIL

N.T.S.

UTILITY CROSSING DETAIL

FIGURE 13

AutoCAD SHX Text
GI-204
AutoCAD SHX Text
GI-204
AutoCAD SHX Text
CITY OF NEW YORK
AutoCAD SHX Text
DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
BUREAU OF ENVIRONMENTAL PLANNING & ANALYSIS - GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION