MEMBER UPDATE - STATSBYGG TWN 17 – 19. SEPT 2012
DIRECTOR GENERAL
ØIVIND CHRISTOFFERSEN
AGENDA
1. Situation after terror
attack July 22th 2011
2. Customer satisfaction
3. Political situation
THE TERRORR ATTACK
THE MOURNING AND COHESION
22.07.11
The situation was characterized by:
• Confusion
• Disbelief
• Uncertainty
• Insecurity
• Fear
Focus on our responsibilities
• Securing the ministries
• Identify alternative office premises -
our responsibility
The terroattack JulY 22. 2011 on
governmental buildings caused severe
damages (H-block, Y-block, R4 and S-
block).
THE IMEDIATE SITUATION
Workplaces and buildings impacted :
Antallet ansatte man forventer skal tilbake er ca 2100.
Bygning Lokalisering BTA over bakken BRA over bakken Ant. Ansatte
H-blokk H-blokk 15 966 m² 15 205 m² Ca. 370
Y-blokk Y-blokk 12 070 m² 11 495 m² Ca. 340 (hele bygget)
R4 R 4 12 540 m² 11 942 m² Ca. 410
S-blokk S-blokk 9 133 m² 8 698 m² Ca. 330
I RKV 49 709 m² 47 340 m² Ca. 1450
SECURING THE DAMAGED BUILDINGS IN THE
GOVERNMENTAL QUARTER Mission :
• Securing and cleaning up
Goals :
• As soon as possible to get workplaces into operation
Security high focus – effeciency demands krav til effektivitet
Challenges :
• Fast progress. Less formality
• No planning – Contracting without necessary design
• Demanding budgetting – hard to predict progress
• Guardence, Security
• Asbestos : Handle with care
Enormous focus
SECURING OF THE GOVERNMENTAL QUARTERS
Status;
• Grubbegata
• Y-block
• Supreme Court
• H-block
• R4
• M17
• S-block
• G-blckk
• Møllergata 19
• Garage og culvert system
• Outdoor areas
Different security works as;
• Changing of windows and
doors
• Car ports
• Staircases
• Floor sanding
• Wall strengthening
• Fire security
• Asbestos removing
• Removal of damdaged interior
in general
• Meassures for security
• Cleaning up
• Covering up and preventing
insight
FALL 2011 – PRELIMENARY STUDIES PREPARING FOR THE MORE
DETAILED ANALYSIS
• Spread or co-locating the ministries?
• Statsbygg :
• Presented several volume-studies
• Investigated psychosocial consequences
• Examined workplaces of the future
• Ellaborated on the listed buldings issue
• Statsbyggs reccomendations formed the basis for the governments further work
• Deeper analysis is currently taking place
• In the meantime a July 22.-commission was established by the prime minister and started its work
Statsbygg reccommended
a co-location at the same area
• Collected offer of more than 9000
workplaces
• Only a limited were approved by the
police and national security authorities
• Left with few, but sufficient
• Leasecontracts signed
• Security is very demanding.
Cooperation with Forsvarsbygg
regarding security meassures. i.e.
perimeter security, Lock step and
bollards
• Huge challenges in satisfying customer
demands (upgrades/reconstruction)
INTERMEDIATE PREMISES
ECONOMY/ TOTAL COST
FORECAST/BEST GUESS
Forecast financial spending -
intermidiate premises (10 years)
• Two elements:
1. Base rent for the premises as is
2. Lease for all necessary changes
• Annual cost when all work done:
€23M + €17M = €40 M (Total €400M)
Estimate security work/cleaning up :€ 75M
Constructing new buildings : €1.250M(?)
Total - rough estimate : €1.750m
HOW IS CUSTOMER SATISFACTION INDEX
MEASSURED (CSI/KTI)?
CSI/KTI is a weigthed result of the following three
question:
1. How satisfied, in general, are you with Statsbygg?
2. To what extend has Statsbygg met your expectations?
3. Imagine a vendor of premises who is ideal in all matters. How close or far from this ideal do you consider Statsbygg to be?
Overall
satisfaction
with Statsbygg
Customer
expectaton
Customer
ideal + = CSI/KTI +
HOW IS LOYALTY MEASSURED?
Loyalty is a weigthed result of the following two
question:
1. Think of your experiences with Statsbygg. If you were to solve these tasks today, would you still have chosen Stastbygg?
2. Would you recomend Statsbygg to other agencies or ministries if you were asked?
Choose
Statsbygg
once more
Recommend
Statsbygg + = Loyalty
Loyalty
55
60
65
70
75
80
2008 2010 2012
Vu
rder
ing
Development Customer Satisfaction and Customer Loyalty
KTI (Tilfredshet)
Lojalitet Loyalty
Satisfaction
Satisfaction
TYPES OF CUSTOMERS - DEVELOPMENT
Customer Types 2010 464 responding
Lav
Hø
y
Lav Høy
Den trofastekunden
Ambassadøren
Kjernekunden
Den kritiskekunden Den troløse kunden
25%
46%
7%
16%
5%
Satisfaction
Lo
ya
lty
Customer Types 2012 506 responding
Lav
Hø
y
Lav Høy
Den trofastekunden
Ambassadøren
Kjernekunden
Den kritiskekunden Den troløse kunden
43% [+18]
39% [-7]
2% [-5] 11% [-5]
4% [-1]
Lo
ya
lty
Satisfaction
POSSIBLE CHANGES AFTER THE ELECTION FALL 2013
Statsbyggs role – political evaluations
• Statsbygg has been in a stable
situation for many years
• Former goverments have had ideas for
reforms
• These ideas are still alive.
Opposition in the Parliament
• A change of Government will wake up
old ideas for changing the real estate
policies.
• Statsbygg will evaluate and prepare
for different scenarios
Strategic options
IMPACT OF THE COMMISSION OF JULY 22.
• The report from the commission of July
22. may have huge impacts independant of
the outcome of the election
• Central government, (and Statsbygg), will
be subject to more direct political control
and following up
• The lack of following up on security
meassures is already discussed broadly and
on a high level
• The word security has got a new meaning
• Statsbygg has already noticed possible
consequences
POSSIBLE SCENARIOS
• Reductions in construction of new buildings Reconstruction of governmental buildings will have priority
• Increased focus on alternative of financing (PPP)
• Increased focus on throughput and cost efficiency
• Increased focus on security
• Consolidating governmental real estate business
• Probably increased outsourcing
• Changes in how we use the market
Our strategy; Be prepared, be willing to change and see it as an opportunity
Summary
• A lot of changes are
expected to take place
a year from now
• Statsbygg is in a strong
position and are well
be prepared
• Stastbygg is ready to
pick up the challenge
and see coming
changes as an
opportunity
Thank you for your attention!