MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT,...

16
MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University of Fort Hare, South Africa FHIT Renewable energy research

Transcript of MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT,...

Page 1: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

MELANI BIOMASS GASIFICATION

PROJECT, EASTERN CAPE, SA

N.S. Mamphweli, E.L. Meyer

Fort Hare Institute of Technology, University of Fort Hare,

South Africa

FHIT Renewable energy research

Page 2: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

FORT HARE INSTITUTE OF

TECHNOLOGY RESEARCH

FHIT Renewable energy research

� Solar Energy

�Material Science

� ICT and Power

Engineering

� Biomass Energy

Page 3: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

3

PROJECT BACKGROUND

• Biomass gasifiers convert wood and wood waste into charcoalreleazing gas as a by product.

• Research in biomass gasification has been undertaken for someyears in South Africa.

• A System Johansson Biomass Gasifier (SJBG) installed atRosherville (Eskom R&D) was used for research purposes.

• The SJBG proved to be ready for commercialization around the

90’s.

• Eskom, UFH and CCE embarked on a pilot and demonstrationproject-EC.

Page 4: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

4

INTRODUCTION

– Community needs assessment study undertaken to establish community needs.

– Availability and suitability of fuel and space for project.

– Agreement with sawmill operator for provision of fuel free of charge for duration of project.

– Community socio-economic status survey.

– Construction and installation of gasifier system

– Business plan formulation.

Page 5: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

5

• Age distribution

COMMUNITY SOCIO-ECONOMIC

STATUS

Age Number of people

Under 10 65

Between10 and 20 700

Between 20 and 50 1200

Between 50 and 70 500

Over 70 110

Total 2800

Page 6: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

6

• Community skills

0

50

100

150

200

250

300

Bric

k la

ying

Sew

ing

Wel

ding

Hou

se w

iring

Carp

entry

Plum

bing

Tota

l ski

lled

No. of peole

COMMUNITY SOCIO-ECONOMIC

STATUS

Page 7: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

7

• Employment status

COMMUNITY SOCIO-ECONOMIC

STATUS

0

50

100

150

200

250

Self

empl

oyed

Saw

mill

labo

urs (

FT)

Saw

mill

labo

urs (

PT)

Subs

ista

nce

farm

ers

No. of people

Page 8: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

8

• Skills development.

• Employment.

• Infrastructure and funding for projects.

• Small business development.

COMMUNITY NEEDS

Page 9: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

9

ANALYSIS OF BIOMASS RESOURCES

Properties Composition (%)

Moisture content 15.5

Ash content 6.0

Volatile matter 70.0

Fixed carbon 8.5

• Proximate analysis

Page 10: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

10

PROJECT IMPLEMENTATION

• Gasifier system manufactured and installed.

Page 11: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

11

BIOMASS GASIFIER COST

• Capex-300nm3/h, 150kVA

Gas producer complete with cyclone, gas scrubber and particle interference filter

R1,645,012.00

150 kVA gensets R999,290.52

Civil works R600, 000.00

Total R2,344,302.52

Page 12: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

12

SMALL BUSINESS ESTABLISHMENT

• Two small businesses were identified in consultation with the community-Grain mill and bakery.

• A comprehensive business plan was drawn focusing on the two enterprises.

• Maize mill-containerized mill (ABC Africa)

o 1000 bags of maize milled per month.

o Annual profit estimated at R14 000.

o 2 full time jobs will be created-number will increase with increase

demand.

o CAPEX R25 000, can be recovered within the first year.

Page 13: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

13

SMALL BUSINESS ESTABLISHMENT

• Containerized bakery (Bakersmate).

o 1000 loaves will be sold daily. (currently selling about 200)

o At least 10 full time jobs will be created-additional jobs such as

delivery etc.

o Estimated profit of R60 000 pa.

o CAPEX-R100 000 production capital that could be recovered

within the first two years.

Page 14: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

14

PROJECT IMPLEMENTATION

THE FINAL PRODUCT

Page 15: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

15

RESEARCH ACTIVITIES

• Enhancement of the energy efficiency of the gasifier system.

• Environmental aspects of the gasifier system.

• Influence of fuel properties on gasification process.

• Utilization of gasification by-products in other areas.

• Computer modeling of flow dynamics and reactions.

• Performance monitoring of the gasifier system.

• Socio-economic aspects related to the project.

• Techno-economic aspects of the project (Viability and feasibility)

Page 16: MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA · MELANI BIOMASS GASIFICATION PROJECT, EASTERN CAPE, SA N.S. Mamphweli, E.L. Meyer Fort Hare Institute of Technology, University

JUNE 2012 16

HOPE TO SEE MORE OF THESE

PROJECTS IN FUTURE

We did not inherit this planet from our forefathers but we borrowed it from our grand children.

THANK YOU