MEF - Machines & Experimental Facilities
J.Coupard 1
Linac4 projectEN/MEF roles & responsibilities
EN/MEF group meetingOctober 2010
08-10-2010
MEF - Machines & Experimental Facilities
J.Coupard 2
Content Who am I ? Linac4 project overview EN/MEF sections Roles & Responsibilities in the Linac4
project
08-10-2010
MEF - Machines & Experimental Facilities
J.Coupard 3
Who am I ? First name Julie Surname Coupard Nationality French Home Annecy, FR @ CERN since 2007 EN/MEF LPC – Planning and Coordination [K.Foraz]
Section projects LHC, Linac4, HiRadMat, building 867, CLIC, AET Main role Coordination of Linac4 installation Officer
Planning of collimation upgrade in LHC Other EN/MEF-LPC webmaster Contact Office 112-4-C21 / 16 56 75
08-10-2010
MEF - Machines & Experimental Facilities
J.Coupard 4
Linac4 project overviewGOALThe goal of the Linac4 project is to build a 160 MeV H− linear accelerator replacing Linac2 as injector to the PS Booster (PSB) and to modify the PSB injection for the Linac4 beam. The beam brightness out of the PSB is expected to increase by a factor of 2.
08-10-2010
MEF - Machines & Experimental Facilities
J.Coupard 5
Linac4 project overviewLOCATION
08-10-2010
Linac4
Rest.2
MEF - Machines & Experimental Facilities
J.Coupard 6
Linac4 project overviewINFRASCTRUCTURE DESCRIPTION
08-10-2010
~ 26m
~ 10m
~ 103m
~ 12m
~ 50m
MEF - Machines & Experimental Facilities
J.Coupard 7
Linac4 project overviewMACHINE DESCRIPTIONLinac4 is composed of an ion source, a Front-end (Radio Frequency Quadrupole and a chopper line), an Alvarez Drift Tube Linac (DTL), a Cell-Coupled Drift Tube Linac (CCDTL) and a Pi-mode structure (PIMS), for an overall length of 86 metres. A 70 m long transfer line joins the present Linac2 to PSB line.
The RF accelerating structures will operate at 352.2 MHz frequency, re-using some RF equipment from LEP (klystrons, circulators and waveguides) and taking advantage of existing RFQ technology. Charge exchange injection will be implemented in the PSB, together with the modifications required in the PSB injection line to cope with the higher injection energy.
08-10-2010
MEF - Machines & Experimental Facilities
J.Coupard 8
Linac4 project overviewMACHINE DESCRIPTIONH- Source - « LEBT » Low Energy Beam Transfer
08-10-2010
Output : 45 keV
MEF - Machines & Experimental Facilities
J.Coupard 9
Linac4 project overviewMACHINE DESCRIPTION« RFQ » Radio Frequency Quadrupole – Chopper line « MEBT » Medium Energy Beam
Transfer
08-10-2010
Output : 3 MeVInput : 45 keVE x 67
MEF - Machines & Experimental Facilities
J.Coupard 10
Linac4 project overviewMACHINE DESCRIPTION« DTL » Drift Tube Linac
08-10-2010
Output : 50 MeVInput : 3 MeVE x 17
MEF - Machines & Experimental Facilities
J.Coupard 11
Linac4 project overviewMACHINE DESCRIPTION« CCDTL » Cell-Coupled Drift Tube Linac
08-10-2010
Output : 102.9 MeVInput : 50 MeVE x 2
MEF - Machines & Experimental Facilities
J.Coupard 12
Linac4 project overviewMACHINE DESCRIPTION« PIMS » Pi-mode Structure
08-10-2010
Output : 160 MeVInput : 102.9 MeVE x 1.5
MEF - Machines & Experimental Facilities
J.Coupard 13
Linac4 project overviewCOLLABORATIONS
08-10-2010
MEF - Machines & Experimental Facilities
J.Coupard 14
Linac4 project overviewInstallation of the Linac4 line is followed by :
+ Installation of the new part of transfer lineFrom Linac4 line to the existing BHZ20
+ Minor modifications of LTP-LTB linesFrom the BHZ20 to the measure lines
+ Modification/upgrade of the PS Booster
08-10-2010
MEF - Machines & Experimental Facilities
J.Coupard 15
Linac4 project overviewPROJECT SCHEDULE
08-10-2010
provisional
MEF - Machines & Experimental Facilities
J.Coupard 16
Linac4 project overviewPROJECTORGANIZATION
08-10-2010
S.Weisz DG/PRJ
MEF - Machines & Experimental Facilities
J.Coupard 17
Linac4 project overviewPROJECT ORGANIZATIONCoordination teams
08-10-2010
EN/MEF-LPCJ.Coupard
EN/MEF-ABAN.Gilbert
BE/ABP-HSLR.Scrivens
Linac4
LTB
PS Booster
Linac2
LTP
MEF - Machines & Experimental Facilities
J.Coupard 18
EN/MEF sections Roles & Responsibilities
08-10-2010
ABA
LE
DC
INT
SI
LPC
MEF - Machines & Experimental Facilities
J.Coupard 19
EN/MEF sections Roles & Responsibilities DC – Database Configuration [Samy Chemli]
INT – Integration [Yvon Muttoni]
LPC – Planning and Coordination [Katy Foraz]
ABA – Accelerators Beam lines & Areas [Vinod Chohan]
08-10-2010
MEF - Machines & Experimental Facilities
J.Coupard 20
EN/MEF sections Roles & Responsibilities DC – Database Configuration [Samy Chemli]
Sonia Bartolome Jimenez (in collaboration with Pascal Le Roux BE/CO)The Linac4 Reference Database will be designed to store all data pertaining to the Linac4, its components, their layout, their manufacturing (under the responsibility of the equipment groups) and their installation (in compliance with INB requirements) as a large unified tool
08-10-2010
http://layout.web.cern.ch/layout/
MEF - Machines & Experimental Facilities
J.Coupard 21
EN/MEF sections Roles & Responsibilities INT – Integration [Yvon Muttoni]
08-10-2010
https://project-linac4.web.cern.ch/project-linac4/frame_linac4_integration.htm
Jean-Pierre CorsoIntegration studies for the tunnel, the service areas and the pits. Study the installation of the most intricate zone, to ensure that the components, the services (cable trays, ducts, transport…) do not interfere with each other. Provide and keep-up to date the integration and layout drawings for installation
MEF - Machines & Experimental Facilities
J.Coupard 22
EN/MEF sections Roles & Responsibilities LPC – Planning and Coordination [Katy Foraz]
ABA – Accelerators Beam lines & Areas [Vinod Chohan] Nicolas GilbertCoordination of the PS Booster modification/upgrade for connection of Linac4.
08-10-2010
Julie CoupardMandate study of the short, mid and long-term installation scenarios and related logistics. Coordination of the installation. Follow-up the progress of installation.
Coordination of Linac4 installation officer.
https://twiki.cern.ch/twiki/bin/view/SPL/IntegrationInstallationCoordinationMeetings
MEF - Machines & Experimental Facilities
J.Coupard 23
EN/MEF sections Roles & Responsibilities Also many involved
08-10-2010
Serge Grillot EN/MEF-LPCMain contact for the coordination on site.He is TSO of all the non-technical locations
Gerard Pastor / Patrick Vincent EN/MEF-LPCGerard is the deputy TSO« Chargés de travaux » to ensure the electrical safety
Jean-Michel Lacroix EN/MEF-INTEtudes d’intégration du complexe PS (modification de la ligne de transfert et du PS Booster)
Vinod Chohan EN/MEF-ABACollaboration with India
MEF - Machines & Experimental Facilities
J.Coupard 24
THANKS FOR YOUR ATTENTIONJulie Coupard – LPC team