MINUTES OF MEETINGDATE: 30/12/2012TIME: 1300 - 1500VENUE: SIM HQ ANNEX
PRESENT: KHOO JUN XIANG (Leader)
ANG WEN CAN STEPHENGOH KHENG SIANG JOEL
LIM SING HUI
LOW JIA HUI JETHRO
OPENING:Sing Hui recorded the minutes.AGENDA:
1. Brief Introduction of Agenda2. Actions from last minutes
3. Progression of next phrase
4. Current Situation
5. Update Summary
6. Arrangement of Next Meeting
7. Any other matters
8. End of Meeting
Items Actions to be taken
1
Presentation Of Agenda
Jun Xiang addressed the group with current progress. All to note
2 Actions from last minutesPresentation of prototype demonstration and members had
proofread the entire documents for submission.
All to note
3 Progression of next phrase Continue to work on the development and do unit testing. Original technical design would make changes due to
continuing of development.
Update and baseline the Technical Design Documents. The team is to produce a System Test Plan. Under Construction Phrase.
All to note
4 Current SituationDelegate tasks:
Download QT creator and understand how it works Jun Xiang, Jia Hui, Sing Hui
Research on the format and components of System Test Plan Joel, Stephen
All to take note
-
7/29/2019 Meeting Minutes 30dec2012
2/3
Implement codes, establish connection JunXiang, JiaHui Research on system test plan and QT-testing Stephen, Joel Produce UI in QT-creator, handle documentation Sing Hui
5 Update SummaryThe team continue to work on the prototype and do research on
how to produce a System Test Plan. All members are new to QT
creator (a cross-platform C++ integrated development
environment). Therefore, it is important to get the basics of it such
as handling C++ and JavaScript code editor and using the tools to
handle this project.
Feedback from Accessor- To import users from application database to wrapper database so
that administrator the wrapper is not required to add new user for
the existing of application database.
- Naming convention of the widgets can be more detailed.
All to take note
6 Arrangement of Next MeetingNext meeting will be held on Thursday, 10/01/2013
Location: SIM Annex
Time: 1300
Members must inform
group leader to request
for change of date
and/or timing.
7 Any other mattersNil
Nil
8 End of MeetingThe meeting ended at 15:00
Item Action Item Date Added Assigned To Date Due StatusA1-01 Project Diaries 20/10/2012 Everyone On-going Open
A1-02 Members Profile 20/10/2012 Everyone 08/11/2012 Close
A1-03 Literature review on proposal 20/10/2012 Everyone 04/11/2012 Close
A1-04 Development of Project Website 30/10/2012 Joel 04/11/2012 Close
A1-05 Proposal Draft 1 20/10/2012 Everyone 26/12/2012 Close
A1-06 Introduction, Project Scope 08/11/2012 JunXiang 23/11/2012 CloseA1-07 Stakeholder, Development Methodology 08/11/2012 SingHui 23/11/2012 Close
A1-08 Project Team, Project Website 08/11/2012 Stephen 08/11/2012 Close
A1-09 Control Records, Test Plan 08/11/2012 Joel 23/11/2012 Close
A1-10 Introduction of Requirement Specification 08/11/2012 JiaHui 23/11/2012 Close
A1-11 Update Objective, Scope and Problem Limitation 23/11/2012 Everyone 26/11/2012 Close
A1-12 Project Proposal 23/11/2012 Everyone 08/12/2012 Close
A1-13 Introduction & Glossary 08/12/2012 JiaHui 25/12/2012 Close
A1-14 General Description 08/12/2012 JiaHui 25/12/2012 Close
A1-15 Requirements Definition 08/12/2012 Everyone 25/12/2012 Close
-
7/29/2019 Meeting Minutes 30dec2012
3/3
A1-16 Main Constraints 08/12/2012 Everyone 25/12/2012 Close
A1-17 Proofread all the documents 26/12/2012 Everyone 29/12/2012 Close
A1-18 Redo of prototype 26/12/2012 Everyone 29/12/2012 Close
A1-19 Review on feedbacks from Accessor on29/12/2012 prototype demonstration
30/12/2012 Everyone 30/12/2012 Close
A1-20 Download QT creator from website- Understand the basics usage of QT creator
30/12/2012 Everyone 10/01/2013 Open
A1-21
Implement codes and establish connection
30/12/2012
Jia Hui, Jun Xiang
10/01/2013
Open
A1-22 Coding of UI interface 30/12/2012 Sing Hui, JunXiang
10/01/2013 Open
A1-23 Research on System Test Plan 30/12/2012 Joel, Stephen 10/01/2013 Open
A1-24 Progression and implementation of prototype 30/12/2012 Everyone 01/02/2013 Open