Meeting Minutes 28dec2012
Transcript of Meeting Minutes 28dec2012
-
7/29/2019 Meeting Minutes 28dec2012
1/2
MINUTES OF MEETINGDATE: 28/12/2012TIME: 1300 - 1500VENUE: SIM HQ ANNEX
PRESENT: KHOO JUN XIANG (Leader)
ANG WEN CAN STEPHENGOH KHENG SIANG JOEL
LIM SING HUI
LOW JIA HUI JETHRO
OPENING:Mr Japit meets up with the team with regards to the progression of project and enquires from
members. Sing Hui recorded the minutes.AGENDA:1. Brief Introduction of Agenda
2. Actions from last minutes
3. Implementation of preliminary prototype
4. Current Situation
5. Update Summary
6. Arrangement of Next Meeting
7. Any other matters
8. End of Meeting
Items Actions to be taken
1 Presentation Of AgendaJunXiang addressed the group with current progress. All to note
2 Actions from last minutesAll members contribute to editing of the documents.
Changes in diagrams Jiahui
Changes made in functionalities of system Jiahui
Finalized user interface - Everyone
All to note
3 Implementation of preliminary prototype Produce of GUI for the program. Joel modified the GUI and go through with the team
members.
Final changes need to be done with the GUI, highlight onmake queries and to show on the report.
Points to take note: Design method needs to be furtheremphasized. Pragma.db must be read in data dictionary.
Implementation method has to be defined with precisefunctionalities.
All to note
-
7/29/2019 Meeting Minutes 28dec2012
2/2
4 Current SituationMr Japit discussed with the team:
- How to actual implement Database Data Dictionary
- Preparation for 29 December prototype demonstration to Project
Accessor.
- Quick review on preliminary prototype
Team do a final touch up on all the documents,
Go through a final rehearsal for tomorrow prototype presentation.
All to take note
5 Update SummaryThe team is working on preliminary prototype with modifications in
the functionalities.
All to take note
6 Arrangement of Next MeetingNext meeting will be held on Friday, 30/12/2012
Location: SIM Annex
Time: 1300
Members must inform
group leader to request
for change of dateand/or timing.
7 Any other mattersNil Nil
8 End of MeetingThe meeting ended at 15:00
Item Action Item Date Added Assigned To Date Due StatusA1-01 Project Diaries 20/10/2012 Everyone On-going Open
A1-02 Members Profile 20/10/2012 Everyone 08/11/2012 Close
A1-03 Literature review on proposal 20/10/2012 Everyone 04/11/2012 Close
A1-04 Development of Project Website 30/10/2012 Joel 04/11/2012 Close
A1-05 Proposal Draft 1 20/10/2012 Everyone 26/12/2012 Close
A1-06 Introduction, Project Scope 08/11/2012 JunXiang 23/11/2012 CloseA1-07 Stakeholder, Development Methodology 08/11/2012 SingHui 23/11/2012 Close
A1-08 Project Team, Project Website 08/11/2012 Stephen 08/11/2012 Close
A1-09 Control Records, Test Plan 08/11/2012 Joel 23/11/2012 Close
A1-10 Introduction of Requirement Specification 08/11/2012 JiaHui 23/11/2012 Close
A1-11 Update Objective, Scope and Problem Limitation 23/11/2012 Everyone 26/11/2012 Close
A1-12 Prototype 23/11/2012 Everyone 08/12/2012 Close
A1-13 Introduction & Glossary 08/12/2012 JiaHui 25/12/2012 Close
A1-14 General Description 08/12/2012 JiaHui 25/12/2012 Close
A1-15 Requirements Definition 08/12/2012 Everyone 25/12/2012 Close
A1-16 Main Constraints 08/12/2012 Everyone 25/12/2012 Open
A1-17 Proofread all the documents 26/12/2012 Everyone 29/12/2012 Open
A1-18 Redo of prototype 26/12/2012 Everyone 29/12/2012 Open