Meeting Minutes 10jan2013
Transcript of Meeting Minutes 10jan2013
-
7/29/2019 Meeting Minutes 10jan2013
1/3
MINUTES OF MEETINGDATE: 10/01/2013TIME: 1300 - 1500VENUE: SIM HQ ANNEX
PRESENT: KHOO JUN XIANG (Leader)
ANG WEN CAN STEPHENGOH KHENG SIANG JOEL
LIM SING HUI
LOW JIA HUI JETHRO
OPENING:Sing Hui recorded the minutes.AGENDA:
1. Brief Introduction of Agenda2. Actions from last minutes
3. Implementation
4. Current Situation
5. Update Summary
6. Arrangement of Next Meeting
7. Any other matters
8. End of Meeting
Items Actions to be taken
1
Presentation Of Agenda
Jun Xiang addressed the group with current progress. All to note
2 Actions from last minutes- All members done with downloading of QT creator and
understand how the platform works.
- Research on the components of System Test Plan done Joel,
Stephen
All to note
3
Implementation
The development continues with designing of UI and implementing
codes on the widgets of the interfaces.
- Implementation progress using storyboard mode.
- Due to unfamiliarity with QT development, the team took quite a
while to research for online codes and make reference from a book
Fundamental of QT Development.
- Design of UI has to be precise and careful due to having different
buttons and widgets with different ability to control the whole
program.
- Testing will be done using QTtest runner and unit testing.
Documents needed for testing are checklists, testingrequirements, test plan, testing implementation.
All to note
-
7/29/2019 Meeting Minutes 10jan2013
2/3
4 Current SituationProblem faced
-While trying to implement log in with QT Creator, Jia Hui keep
reinstalling the Ubuntu OS and QT creator software. Even with
correct coding, connection can be established but SQL commands
cannot get through.
Problem solved
Jun Xiang gave his OS image to Jia Hui and he implemented the
whole system again
Jun Xiang and Singhui have finish coding the user interface and
establish connection to sqlite.
Login is done and is currently on the stage of implementing
different functionalities.
Stephen found a suitable system test plan template and is
developing the test plan based on that.
Joel is constantly discussing with the implementers for the various
test cases that are to be included and excluded in the test plan.
Tasks delegated:
Implement codes for Administration which includes manageconstraint, manage range, manage user, manage role JunXiang.
Implement codes for Read in data-dictionaryand view logfiles Jia Hui.
Refining of UI include the widgets, templates and buttons;Handling of documentation Sing Hui
Thoroughly understand all the functions in the program andhow it works.These ensure that the test cases are well designed.
Drafting of System Test Plan - Joel, Stephen
All to take note
5 Update SummaryThe team continue with implementation of codes and drafting out
the System Test Plan.
All to take note
6 Arrangement of Next MeetingNext meeting will be held on Thursday, 17/01/2013
Location: SIM Annex
Time: 1300
Members must inform
group leader to requestfor change of date
and/or timing.
-
7/29/2019 Meeting Minutes 10jan2013
3/3
7 Any other mattersNil Nil
8 End of MeetingThe meeting ended at 15:00
Item Action Item Date Added Assigned To Date Due StatusA1-01 Project Diaries 20/10/2012 Everyone On-going Open
A1-02 Members Profile 20/10/2012 Everyone 08/11/2012 Close
A1-03 Literature review on proposal 20/10/2012 Everyone 04/11/2012 Close
A1-04 Development of Project Website 30/10/2012 Joel 04/11/2012 Close
A1-05 Proposal Draft 1 20/10/2012 Everyone 26/12/2012 Close
A1-06 Introduction, Project Scope 08/11/2012 JunXiang 23/11/2012 CloseA1-07 Stakeholder, Development Methodology 08/11/2012 SingHui 23/11/2012 Close
A1-08 Project Team, Project Website 08/11/2012 Stephen 08/11/2012 Close
A1-09 Control Records, Test Plan 08/11/2012 Joel 23/11/2012 Close
A1-10 Introduction of Requirement Specification 08/11/2012 JiaHui 23/11/2012 Close
A1-11 Update Objective, Scope and Problem Limitation 23/11/2012 Everyone 26/11/2012 Close
A1-12 Prototype 23/11/2012 Everyone 08/12/2012 Close
A1-13 Introduction & Glossary 08/12/2012 JiaHui 25/12/2012 Close
A1-14 General Description 08/12/2012 JiaHui 25/12/2012 Close
A1-15 Requirements Definition 08/12/2012 Everyone 25/12/2012 Close
A1-16 Main Constraints 08/12/2012 Everyone 25/12/2012 Close
A1-17 Proofread all the documents 26/12/2012 Everyone 29/12/2012 Close
A1-18
Redo of prototype
26/12/2012
Everyone
29/12/2012
Close
A1-19 Review on feedbacks from Accessor on
29/12/2012 prototype demonstration
30/12/2012 Everyone 10/01/2013 Close
A1-20 Download QT creator from website- Understand the basics usage of QT creator
30/12/2012 Everyone 30/12/2012 Close
A1-21 Implement codes and establish connection 30/12/2012 Jia Hui, Jun Xiang 10/01/2013 Close
A1-22 Implement UI interface 30/12/2012 Sing Hui, Jun
Xiang
10/01/2013 Close
A1-23 Research on System Test Plan 30/12/2012 Joel, Stephen 10/01/2013 Close
A1-24 Progression and implementation of prototype 30/12/2012 Everyone 01/02/2013 Open
A1- 25 Drafting out System Test Plan 10/01/2013 Joel, Stephen 14/01/2013 Open