Meeting Description DESIGN REVIEW COMMITTEE WEDNESDAY, …17E1C147-3A18-4562... · 2019. 3. 15. ·...

10
CITY OF WISCONSIN DELLS MEETING AGENDA Meeting Description DESIGN REVIEW COMMITTEE Date: WEDNESDAY, MARCH 20, 2019 Time: 10:00AM Location: MUNICIPAL BUILDING -300 LA CROSSE STREET, WISCONSIN DELLS, WI COMMITTEE MEMBERS ALDER DEFOSSE BEN BORCHER DAN GAVINSKI MARIA ROSHOLT JACQUELINE MORSE AGENDA 1 Call to order and attendance 2 Discussion / Decision of the February 20, 2019 Meeting Minutes 3 Discussion / Decision on Proposed sign application(s) submitted for review, if any (a) 4 Discussion / Decision on Building/site plan application(s) submitted for review, if any (a) 744 Eddy - Bella Goose 5 Discussion / Decision on Outdoor seating/dining application(s) submitted for review, if any (a) 6 Discussion / Decision on Proposed Façade Improvement Grant projects, if any (a) 716 Oak – Keg (update) 7 Discussion / Decision on Proposed changes to the Design Standards, if any (a) Portable message sign 8 Items for referral to future meeting 9 Set date and time of future meeting (April 3) Open Meetings Notice: If this meeting is attended by one or more members of the Common Council who are not members of this committee, their attendance may create a quorum of another city commission, board or committee under the Wisconsin Open Meetings Law; However, no formal action will be taken by any governmental body at the above stated meeting other than the body, committee, commission, or board identified in this meeting notice. Please be advised that upon reasonable notice, the City of Wisconsin Dells will furnish appropriate auxiliary aids and services to afford individuals with disabilities an equal opportunity to participate in meeting activities. CHAIRPERSON – JESSE DEFOSSE DISTRIBUTED MARCH 15, 2019

Transcript of Meeting Description DESIGN REVIEW COMMITTEE WEDNESDAY, …17E1C147-3A18-4562... · 2019. 3. 15. ·...

Page 1: Meeting Description DESIGN REVIEW COMMITTEE WEDNESDAY, …17E1C147-3A18-4562... · 2019. 3. 15. · Bella Goose 744 Eddy Façade update DRC 032019 The City has just received a rendering

CITY OF WISCONSIN DELLS MEETING AGENDA Meeting Description DESIGN REVIEW COMMITTEE Date: WEDNESDAY, MARCH 20, 2019 Time: 10:00AM Location: MUNICIPAL BUILDING -300 LA CROSSE STREET, WISCONSIN DELLS, WI

COMMITTEE MEMBERS

ALDER DEFOSSE BEN BORCHER DAN GAVINSKI MARIA ROSHOLT JACQUELINE MORSE

AGENDA

1 Call to order and attendance

2 Discussion / Decision of the February 20, 2019 Meeting Minutes

3 Discussion / Decision on Proposed sign application(s) submitted for review, if any

(a)

4 Discussion / Decision on Building/site plan application(s) submitted for review, if any (a) 744 Eddy - Bella Goose

5 Discussion / Decision on Outdoor seating/dining application(s) submitted for review, if any (a)

6 Discussion / Decision on Proposed Façade Improvement Grant projects, if any

(a) 716 Oak – Keg (update)

7 Discussion / Decision on Proposed changes to the Design Standards, if any (a) Portable message sign

8 Items for referral to future meeting

9 Set date and time of future meeting (April 3)

Open Meetings Notice: If this meeting is attended by one or more members of the Common Council who are not

members of this committee, their attendance may create a quorum of another city commission, board or committee

under the Wisconsin Open Meetings Law; However, no formal action will be taken by any governmental body at the

above stated meeting other than the body, committee, commission, or board identified in this meeting notice.

Please be advised that upon reasonable notice, the City of Wisconsin Dells will furnish appropriate auxiliary aids

and services to afford individuals with disabilities an equal opportunity to participate in meeting activities.

CHAIRPERSON – JESSE DEFOSSE DISTRIBUTED MARCH 15, 2019

Page 2: Meeting Description DESIGN REVIEW COMMITTEE WEDNESDAY, …17E1C147-3A18-4562... · 2019. 3. 15. · Bella Goose 744 Eddy Façade update DRC 032019 The City has just received a rendering

Bella Goose 744 Eddy Façade update DRC 032019 The City has just received a rendering for a new façade design at 744 Eddy from Bella Goose. Initial review appears to comply with the Design Standard. There is a comment that the new coffee roaster chimney will be covered with vinyl siding. Vinyl is normally prohibited, and the applicant has stated they will look into a using a preferred material such as engineered wood. Chris Tollaksen City of Wisconsin Dells

Chris
Text Box
Item 4(a)
Page 3: Meeting Description DESIGN REVIEW COMMITTEE WEDNESDAY, …17E1C147-3A18-4562... · 2019. 3. 15. · Bella Goose 744 Eddy Façade update DRC 032019 The City has just received a rendering

1. Paint Upper half of building white2. Patch and paint lower half of building matt black3. Construct set back door with graded cement flooring (no step), install new door and tile on walls in entry4. Second story windows are 48’’ wide by 58’’ tall. They are 2 feet up from the ground.5. The front facade where the windows were, will be filled in with brick and then electrical for the gooseneck lights6. First story window will be black vinyl and 11’ wide by 6’ tall.7. Vinyl siding the roastery vent.

EXTERIOR FACADE PLAN / 744 EDDY STREET / BELLA GOOSE COFFEE

Page 4: Meeting Description DESIGN REVIEW COMMITTEE WEDNESDAY, …17E1C147-3A18-4562... · 2019. 3. 15. · Bella Goose 744 Eddy Façade update DRC 032019 The City has just received a rendering
Page 5: Meeting Description DESIGN REVIEW COMMITTEE WEDNESDAY, …17E1C147-3A18-4562... · 2019. 3. 15. · Bella Goose 744 Eddy Façade update DRC 032019 The City has just received a rendering

Keg – wine bar 716 Oak DRC 032019 The City has received the final plans and elevations for the Keg project at 716 Oak St. The applicant had attempted to verbally explain some of the design details during previous review. Rolling doors will be used to provide the open air environment. Previous renderings had shown windows where the open doors would be. The rolling doors will be a black steel to match the other doors. The Design Standards only address street facing garage doors, and primarily on Broadway west of Church St. Chris Tollaksen City of Wisconsin Dells

Chris
Text Box
Item 6(a)
Page 6: Meeting Description DESIGN REVIEW COMMITTEE WEDNESDAY, …17E1C147-3A18-4562... · 2019. 3. 15. · Bella Goose 744 Eddy Façade update DRC 032019 The City has just received a rendering

Conditionally

APPROVED DEPT. OF SAFETY AND PROFESSIONAL

SERVICES DIVISION OF INDUSTRY SERVICES

SEE CORRESPONDENCE

3199939Addition/Alteration02/08/2019

Page 7: Meeting Description DESIGN REVIEW COMMITTEE WEDNESDAY, …17E1C147-3A18-4562... · 2019. 3. 15. · Bella Goose 744 Eddy Façade update DRC 032019 The City has just received a rendering

FIRST FLR.100' - 0"

T.O. ROOF121' - 7"

MECHANICALMEZZANINE

FLOOR113' - 1"

12

168

4

2

0

5

A5.0

3

A5.0

4

A5.0

1

A5.0

2

A5.0

FIRST FLR.100' - 0"

T.O. ROOF121' - 7"

MECHANICALMEZZANINE

FLOOR113' - 1"

24

3216

8

4

0

2 8'-0"x8'-0" SECTIONAL GALVANIZED STEEL INSULATED ROLLING DOOR. U-VALUE: 0.125

1THERMALLY-BROKEN ANODIZED ALUMINUM STOREFRONT DOOR w/ 1" TINTED, INSULATING, LOW-E, ARGON FILLED GLAZING. U-VALUE: 0.7, SHGC: 0.35

3FIXED THERMALLY-BROKEN ANODIZED ALUMINUM STOREFRONT WINDOWS, w/ INSULATED GLAZING, LOW E & ARGON FILLED. U-VALUE: 0.45, SHGC: 0.35

ELEVATION NOTES

4 CEDAR SIDING

FIRST FLR.100' - 0"

T.O. ROOF121' - 7"

MECHANICALMEZZANINE

FLOOR113' - 1"

4" CONCRETE SLAB

2-PLY 2x10 WOOD HEADER, SEE STRUCTURAL

CEDAR SIDING, BY OWNER

1 1/2" RIGID INSULATION, R-7.5, TYP.

AIR BARRIER

7/16" OSB SHEATHING

2x6 WOOD STUDS @ 16" O.C.

6" FIBERGLASS BATT INSULATION, R-19, TYP.

5/8" GYP BD OVER 6mil VAPOR BARRIER

R.O

.

5' -

8"1'

- 6"

FIXED THERMALLY-BROKEN ANODIZED ALUMINUM STOREFRONT WINDOWS

A5.05

A5.03

A5.01

A5.04

2" RIGID INSULATION

2x4 TRIM TO COVER RIGID INSULATION

2

A5.0

This

docu

ment

cont

ains c

onfid

entia

l or p

ropr

ietar

y info

rmati

on o

f Gen

eral

Engin

eerin

g Co

mpan

y. Ne

ither

this

docu

ment

nor

the

infor

matio

n he

rein

is to

be

repr

oduc

ed, d

istrib

uted

, us

ed o

r disc

losed

eith

er in

who

le or

in p

art e

xcep

t as s

pecif

ically

auth

orize

d by

Gen

eral

Engin

eerin

g Co

mpan

y.

P.O

. Box

340

9

16 S

ilver

Lak

e D

r. P

orta

ge, W

I 53

901

SHEET NO.GEC FILE NO.

ISSUE DATE

REVIEWED BY

Gen

eral

Eng

inee

ring

Com

pany

FULL SIZE SCALE

608-

742-

2169

(Offi

ce)

608

-742

-259

2 (F

ax)

ww

w.g

ener

alen

gine

erin

g.ne

t

DRAWN BY

ISSUED FOR CONSTRUCTION

G:\C

urre

nt F

iles

E-K\

Koe

hler

, Kei

th\2

-121

8-57

0 K

ilbou

rn W

ine

Bar

\CA

D 2

-121

8-57

0\1_

ARC

H\2

-121

8-37

0 K

ilbou

rn W

ine

Bar

- K

LB.rv

t

As indicated

ELEV

ATI

ON

S

KEI

TH K

OH

LER

KIL

BO

UR

N W

INE

BA

R

CIT

Y O

F W

ISC

ON

SIN

DEL

LS

A2.02-1218-370

02/04/2019

GAM

KLB

CO

LUM

BIA

CO

UN

TY, W

I 539

65

SCALE: 1/8" = 1'-0" on 11" x 17" 1/4" = 1'-0" on 22" x 34"

WEST ELEVATION1

SCALE: 1/16" = 1'-0" on 11" x 17" 1/8" = 1'-0" on 22" x 34"

NORTH ELEVATION2

3 31

11 2 2

4

SCALE: 3/8" = 1'-0" on 11" x 17" 3/4" = 1'-0" on 22" x 34"

WALL SECTION - WEST WALL3

REV

ISIO

NS

NO

.BY

DAT

E

Page 8: Meeting Description DESIGN REVIEW COMMITTEE WEDNESDAY, …17E1C147-3A18-4562... · 2019. 3. 15. · Bella Goose 744 Eddy Façade update DRC 032019 The City has just received a rendering
Chris
Text Box
Second submittal
Page 9: Meeting Description DESIGN REVIEW COMMITTEE WEDNESDAY, …17E1C147-3A18-4562... · 2019. 3. 15. · Bella Goose 744 Eddy Façade update DRC 032019 The City has just received a rendering
Page 10: Meeting Description DESIGN REVIEW COMMITTEE WEDNESDAY, …17E1C147-3A18-4562... · 2019. 3. 15. · Bella Goose 744 Eddy Façade update DRC 032019 The City has just received a rendering
Chris
Text Box
Original Submittal