MEDESS-4MS - Work Package 2 Information and Awareness Raising · Overview 6WorkPackage2Work Package...
Transcript of MEDESS-4MS - Work Package 2 Information and Awareness Raising · Overview 6WorkPackage2Work Package...
MEDESS-4MS - Work Package 2Information and Awareness Raisingg
Aldo Drago, Adam GauciPO-Unit, IOI-MOC, University of Malta
Third Steering Committee Meeting12th – 13th September 2012
Rome ItalyRome, Italy
The project is being co-financed by the European Regional Development Fund
Overview
Work Package 2Work Package 2WP 2.1 - Web PortalWP 2.2 - User ConsultationWP 2 3 End User General MeetingsWP 2.3 - End-User General MeetingsWP 2.4 - End-User Sub-Regional MeetingsWP 2.5 - Connection to existing emergency plansWP 2 6 P j O hWP 2.6 - Project Outreach
Task in progress and on schedule
Task planned but willTask planned but will commence later on
The project is being co-financed by the European Regional Development Fund
WP2 Partnership and Task Leaders
WP2.2 User ConsultationWP2.3 End-User Meetings
Participating Partners
DMS Department of
Merchant Shipping
OC-UCY Oceanography Center,
University of Cyprus
MFMETEO-FRANCE Puertos del Estado
UIB-IMEDEA Innovamar INGV ITCGUniversity of Balearic Islands -Mediterranean Institute of Advanced
Studies
Innovamar INGVIstituto Nazionale di
Geofisica e Vulcanologia
ITCG Italian Coast Guard
Port Authority of Algeciras Bay
ICM - CSIC
LUISS REMPEC IOI M lt IASALUISS
Libera UniversitaInternazionale degli
Studi Sociali
Regional Marine Pollution Emergency
Response Centre for the Med. Sea
IOI-Malta Operational Centre, University of Malta
HCMRHellenic Centre for Marine Research
IASA Institute of Accelerating
Systems and Applications
Port Organisation CedrePort Organisation of Heraklion
CedreCentre de
Documentation, de Recherche et d‘ Experimntationssur le pollutions
DAC Decentralized
Administration of Crete
IFREMERFrench Research
Institute for Exploitation of the Sea
CNRConsiglio Nazionale
delle RicercheMaritime Safety Deparment of M accidentelles des eauxMontenegro
WP2.1 Web Portal2.4 End User Sub-Regional Meetings 2.6 Project Outreach
WP 2.5 Connection to Existing Emergency Plans
The project is being co-financed by the European Regional Development Fund
WP 2.1Web Portal
Deliverable 2.1.1Web Portal
Responsible CNR (Alberto Ribotti)UOM (Aldo Drago Adam Gauci)UOM (Aldo Drago, Adam Gauci)
Timeline February 2012 – December 2014
Activities http://www.medess4ms.euhttp://www.medess4ms.eu
The project website is regularly updated and improved:graphics, pictures and videosdocumentsdocumentsnewsmeetings
The project is being co-financed by the European Regional Development Fund
WP 2.1Web Portal
Quick links
Publicity
Information
Publicity
Forecasts run by partners
News
The project is being co-financed by the European Regional Development Fund
WP 2.1Web Portal
The project is being co-financed by the European Regional Development Fund
WP 2.1Web Portal
The project is being co-financed by the European Regional Development Fund
WP 2.1Web Portal
Deliverable 2.1.1Web Portal
PlannedAction
Work will continue to update the MEDESS4MS portalthe MEDESS4MS portal
Partners are expected to give contributions
News on MEDESS4MS as well as other relevant information outside the partnership can also bepartnership can also be inserted in NEWS by each partner through the PRIVATE AREA
A dedicated feature on MEDESS4MS will soon be published on the JERICO
The project is being co-financed by the European Regional Development Fund
published on the JERICO OceanBoard
WP 2.2User Consultation
Deliverable 2.2.1User Manuals on the MEDESS4MS service
Responsible INGV (Giovanni Coppini)
Timeline April 2013 (M15)December 2014 (M35)
Activities Continuation of the drafting of the MEDSLIK-II modelgAction expected later on
Planned Action
The preparation of the manuals will continue with consultationby the sub-regional focal points and all WP partnersby the sub regional focal points and all WP partners
The project is being co-financed by the European Regional Development Fund
WP 2.2User Consultation
Deliverable 2.2.2Report on identification and analysis of key end users and stakeholders
Responsible REMPEC (Gabino Gonzalez)PdE (Marcos García Sotillo)PdE (Marcos García Sotillo)Sub-regional focal partners
Timeline August 2012 (M7)
Activities Most of the work done so far is related to the identification of keyend-usersEstablished contact with the Italian oil company ENI thatp yimplemented the MEDSTAR project (environmental riskassessment on the coastline and marine environment generatedby oil spills in open water)Finalised a database template to store information (sector,public/private, localization) about potential MEDESS-4MS end-users such as and its possible interest in the developed services
The project is being co-financed by the European Regional Development Fund
WP 2.2User Consultation
Deliverable 2.2.2
Activities The sub-regional focal points were asked to fill-in a databasewith a list of potential end-users from their region
Report on identification and analysis of key end users and stakeholders
with a list of potential end-users from their regionThe project was introduced during the 11th meeting of REMPECand OPRC focal points and in April/May 2013
PlannedAction
To complete the database and compile a summary of theidentified end-users (Deliverable 2.2.2; August 2012, M7)
The project is being co-financed by the European Regional Development Fund
WP 2.2User Consultation
Deliverable 2.2.3Online questionnaire on User requirements
Responsible OC-UCY (George Zodiatis, Andria Karaolia)UOM (Aldo Drago Adam Gauci)UOM (Aldo Drago, Adam Gauci)Sub regional focal partners
Timeline Jan 2013 - Preparation of questionnaireApr 2013 Launch of online questionnaireApr 2013 - Launch of online questionnaireJan 2014 - URDs
Activities After examining similar project questionnaires and surveys in thisfield a set of questions has been preparedfield, a set of questions has been prepared
PlannedAction
Interaction with INGV, UOM and all other partners to gatherfurther ideasOC-UCY will present the project at an upcoming Oil spillexercise held in Cyprus
The project is being co-financed by the European Regional Development Fund
WP 2.2User Consultation
Deliverable 2.2.4Report on User characteristics, requirments and feedback
Responsible OC-UCY (George Zodiatis, Andria Karaolia)Sub regional focal partnersSub regional focal partners
Timeline January 2014 (M24)September 2014 (M32)
Activities No activities made so farThe reports will describe the MEDESS-4MS service and UserInterface functionalities - closely related to the outcomes of thequestionnaire which will be available by December 2013.
PlannedAction
Two reports will be produced: V1 (by M24) and V2 (by M32)
The project is being co-financed by the European Regional Development Fund
WP 2.3End-User Meetings
Deliverable 2.3.1End User General Meetings
Responsible INGV (Giovanni Coppini)ITCG (Luigia Caiazzo)ITCG (Luigia Caiazzo)REMPEC (Gabino Gonzalez)OC-UCY (George Zodiatis, Andria Karaolia)
Timeline Back to back with annual general meetingsTimeline Back-to-back with annual general meetingsDec 2013 - 1st meeting (M23) organised by ITCGDec 2014 - 2nd meeting (M35) organised by REMPEC
A ti itiActivities Logistical preparations for the meetings
PlannedAction Preparations for the meetings
The project is being co-financed by the European Regional Development Fund
WP 2.4End-User Sub Regional Meetings
Deliverable 2.4.1Sub-regional user meetings and work experiences exchange
Responsible PdE (Marcos Garcia Sotillo)CEDRE (Xavier Kremer) / MF (Denis Paradis Pierre Daniel)CEDRE (Xavier Kremer) / MF (Denis Paradis, Pierre Daniel)CNR (Alberto Ribotti)INGV (Giovanni Coppini)HCMR (Perivoliotis Leonidas)OC-UCY (George Zodiatis, Andria Karaolia)
Timeline To be announced later on in the project
A ti iti OC UCY h i iti t d di i f th i ti f th bActivities OC-UCY has initiated discussion for the organization of the sub-regional user meeting for the Levantine basin
PlannedAction
MEDESS4MS will be presented by OC-UCY at the Cyprus i l il ill i (NIRIIS) b h 2 d 26 fAction national oil spill exercise (NIRIIS) between the 25 and 26 of
September
The project is being co-financed by the European Regional Development Fund
WP 2.5Connection to Existing Emergency Plans
Deliverable 2.5.1Report on standard interface/format to integrate the MEDESS-4MS information and services to existing or new emergency plans
Responsible CEDRE (Kremer Xavier)Responsible CEDRE (Kremer Xavier)REMPEC (Gabino Gonzalez)
Timeline February 2012 - December 2014
Activities This task will be initiated at a later stage of the project
PlannedA ti
CEDRE, supported by REMPEC, will identify and analyse theAction existing local and/or regional emergency plans where available
by developing and writing a standard interface/format to integratethe MEDESS-4MS information and services to existing or newemergency plansemergency plans
The project is being co-financed by the European Regional Development Fund
WP 2.6Project Outreach
Deliverable 2.6.1 and 2.6.2Project Flyer and Brouchures in English and French
Responsible UOM (Aldo Drago, Adam Gauci)
Timeline May 2012 (M4) – Flyer July 2013 (M18) – 1st Project BrochureJuly 2014 (M30) – 2nd Project Brochure
Activities OC-UCY, UOM and CEDRE finalised the text and design of theproject flyer in English and French5000 flyers were printed5000 flyers were printed
Planned Action
Flyer dissimenation by all partners
The project is being co-financed by the European Regional Development Fund
WP 2.6Project Outreach
Deliverable 2.6.1 and 2.6.2Project Flyer and Brouchures in English and French
The project is being co-financed by the European Regional Development Fund
WP 2.6Project Outreach
Deliverable 2.6.3
Activities The first newsletter was sent to all partners and
News Letters
sent to all partners and users in mid-July 2012CNR, OC-UCY and UoMwere mainly involved in the e e a y o ed t epreparation
Planned Action
Preparation for the next news letter (end of Januarynews letter (end of January 2013)Partners are expected to give contributionsg
http://www.medess4ms.eu/?newsletter=luglio-2&lang=en
The project is being co-financed by the European Regional Development Fund
MEDESS-4MS - Work Package 2Information and Awareness Raisingg
Third Steering Committee Meeting12th – 13th September 2012
Rome, ItalyRome, Italy
Further questions, comments and clarifications…
The project is being co-financed by the European Regional Development Fund