MECHANIZED EXCAVATION OF D2 LONG TRANSPORT...

48
Seite 1 27. September, 2004 June 17, 2008 1 1 1 D2 MECHANIZED EXCAVATION OF LONG TRANSPORT TUNNELS Concrete Segments for Tunnel Linings – Field of Application and Design Prague, June 17, 2008 Andreas Beil / Alfred Schulter D2 Consult ZT-GmbH, Linz / Austria

Transcript of MECHANIZED EXCAVATION OF D2 LONG TRANSPORT...

Page 1: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 1 27. September, 2004June 17, 2008

1111

D2

MECHANIZED EXCAVATION OF LONG TRANSPORT TUNNELS

Concrete Segments for Tunnel Linings –Field of Application and Design

Prague, June 17, 2008Andreas Beil / Alfred Schulter

D2 Consult ZT-GmbH, Linz / Austria

Page 2: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 2 27. September, 2004

2

D2

2222

Seite 2 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Content of this presentation

Design Principles and InputsConstruction SystemsSegment Lining SystemsRing GeometrySealing SystemsRequirements to SystemsInfluencesJoint ConfigurationsBolts / Centering ToolsTolerances

Page 3: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 3 27. September, 2004

3

D2

3333

Seite 3 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

• Approx. Length of tunnel with fixed diameterexceeding approx. 2,000 meter.

• Combine TBM- and segment designer immediatelyafter fixing of method and before start of design work.

• Both designs should show minimum 10 years of relevant experience.

• Client to specify dual requirements of TBM and lining .

• Distribution of technical responsibilities at interfa ce.

Principles of Segmental Linings

Page 4: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 4 27. September, 2004

4

D2

4444

Seite 4 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

• Minimum Radius of Tunnel allignment

• Maximum Diameter of Tunnel

• Dual requirements of TBM and lining (e.g. width of thering, segments per ring, max. loadings of TBM thrusts )

• Geotechnical datas (e.g. max. overburden, max. ground water pressure)

Basic Inputs for Design of Segmental Linings

• Other requirements (e.g. fire loadings, tunneloperation loadings, earth quake, minimum tolerances)

Page 5: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 5 27. September, 2004

5

D2

5555

Seite 5 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Thrusters of TBM

Page 6: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 6 27. September, 2004

6

D2

6666

Seite 6 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Master Ring

Master ring for checking of defined tolerance and segme nt details

Page 7: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 7 27. September, 2004

7

D2

7777

Seite 7 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Construction Systems (1)

Segment Lining system with fixed diameter

Lining totally with segments

Closed longitudinal joints – fixed outer diameter

Filling of annular space with gap grouting material

Page 8: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 8 27. September, 2004

8

D2

8888

Seite 8 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Construction Systems (2)

Expendet segment Lining with variable diameter

Lining totally with segments

Variable outer diameter

Segment system with compressing elements –Filling of annular space with gap grouting material

Page 9: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 9 27. September, 2004

9

D2

9999

Seite 9 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Construction Systems (3)

Lining Systems with invert segments

Integration of purpose formed invert segments

Function: immediate fastening (invert, carriageway, drainage)

Invert segment part of final lining

Page 10: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 10 27. September, 2004

10

D2

10101010

Seite 10 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Construction Systems (4)

Lining system with conventional supportingelements and integrated invert segments

precast segments in invert only

Use of shotcrete, anchors and cast-in-place concrete

Carriageway with drainage

Part of final segment lining

Page 11: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 11 27. September, 2004

11

D2

11111111

Seite 11 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Single lining system with invert segment

Page 12: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 12 27. September, 2004

12

D2

12121212

Seite 12 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Construction Systems (5)

Single-lining with segments

Full support of excavation survace

Structural safety of tunnel

Serviceablity of tunnel (water tightness, durability)

Quality requirements to tunnel lining surface

Page 13: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 13 27. September, 2004

13

D2

13131313

Seite 13 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Construction Systems (6)

Double-lining systems with segments and final lining of cast in place concrete

Sustainable final lining constructed as cast-in-place inner layer

Absorbing of ground water loadings by final cast-in-placelining

Segment lining will absorb all other geotechnical loadings

Page 14: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 14 27. September, 2004

14

D2

14141414

Seite 14 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Construction Systems (7)

Double-lining systems with segments and functional final lining

Function of final lining is limited (e.g. fire loading, sealing, collision protection, …)

Function or segment lining equal to single-lining system

Page 15: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 15 27. September, 2004

15

D2

15151515

Seite 15 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Double Lining System

Page 16: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 16 27. September, 2004

16

D2

16161616

Seite 16 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Construction Systems (8)

Double-lining system with invert segmentsCombination of invert segment with shotcrete final liningFunction of integrated invert segment

Immediate fasteningProtection of excavation intradosServiceability of tunnel construction (watertightness, durability)

Page 17: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 17 27. September, 2004

17

D2

17171717

Seite 17 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Segment Systems

Rectangle system

Trapezoid system

Rhomboid system

Hexagonal system

Page 18: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 18 27. September, 2004

18

D2

18181818

Seite 18 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Example for Trapezoid Segments

Page 19: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 19 27. September, 2004

19

D2

19191919

Seite 19 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Rhomboid key stone segment

Page 20: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 20 27. September, 2004

20

D2

20202020

Seite 20 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Example for Hexagonal Segments

Page 21: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 21 27. September, 2004

21

D2

21212121

Seite 21 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Details of Segment Geometry

Page 22: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 22 27. September, 2004

22

D2

22222222

Seite 22 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Ring Geometry

Parallel Ring system

Parallel Ring system with corrections rings

Left-Right-Systems

Universal Ring Systems

Page 23: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 23 27. September, 2004

23

D2

23232323

Seite 23 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Watertightness

Membrane SystemsInstallation between segment lining and cast-in-placeconcrete final liningAbsorbing of ground water loadings by cast-in-placeconcrete final lining

GasketsInstallation in special grooves of the segment jointsAbsorbing of full ground water loadings by thesegments

Page 24: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 24 27. September, 2004

24

D2

24242424

Seite 24 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Ring Geometry Examples

Page 25: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 25 27. September, 2004

25

D2

25252525

Seite 25 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Tailor-Made Gaskets

Tunnel-Type Challenge Dätwyler solution

Big Diameters and offsetsHydrocarbons, Fuels

High PressurePotable Water Contact

Big Diameters,Waste Water Contact

Tunnel Ovalizationwith gap opening

Steps of WaterpressureVery High Water Pressure

Soft Geometry, Soft Corner,

Sliding Surface

Specially StableGeometry,

Hydro-swellingtop and lips

Wide Profile, Protected surface or

CR Rubber

Stable Geometry, Drinkwater Rubber

Quality

Hydro-swellingon top,

EPDM Rubber

Road Tunnels

Metro & RailwayTunnels

Water SupplyTunnels

Low to Medium Water Pressure

Low Reaction Forces

Combined SewerOverflowTunnels

Mountain BasisTunnels

Page 26: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 26 27. September, 2004

26

D2

26262626

Seite 26 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Gasket Details

Page 27: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 27 27. September, 2004

27

D2

27272727

Seite 27 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Watertightening Capacity of Gaskets

Page 28: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 28 27. September, 2004

28

D2

28282828

Seite 28 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Interaction Thrust PressureGasket Relaxation

STAGE 2

0

STAGE 1

Page 29: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 29 27. September, 2004

29

D2

29292929

Seite 29 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Example of Longitudinal Joint

Page 30: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 30 27. September, 2004

30

D2

30303030

Seite 30 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Example of Longitudinal Jointwith Guiding Rod

Page 31: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 31 27. September, 2004

31

D2

31313131

Seite 31 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Example of Joint including Gasket

Page 32: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 32 27. September, 2004

32

D2

32323232

Seite 32 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Joint formations - Shapings

Flat partial area joints

Groove-Tongue joints

Conkave-Convex joints

Page 33: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 33 27. September, 2004

33

D2

33333333

Seite 33 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Circumferential Flat Joint

Page 34: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 34 27. September, 2004

34

D2

34343434

Seite 34 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Longitudinal Joint (Groove-Tongue)

Page 35: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 35 27. September, 2004

35

D2

35353535

Seite 35 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Centering Tools and Fastening Elements

Purpose

Connection of joints (temporary / permanent) throughboltings and dowels

For guaranting stability during implementation

For prohibiting movements

Allow a more precise and simple installation of segments

Page 36: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 36 27. September, 2004

36

D2

36363636

Seite 36 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Inclined Bolt

Page 37: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 37 27. September, 2004

37

D2

37373737

Seite 37 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Centering tools and fastening elements

MethodsFlexible tools

Guiding rod (longitudinal joint), dowel (ring joint)Dowells

In longitudinal joints for absorption of traction and thrustNo additional bolting necessary

BoltsFor temporary protection during assemblingIn longitudinal and ring jointsMostly inclined or curved

Page 38: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 38 27. September, 2004

38

D2

38383838

Seite 38 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

CONEX LINING

BOLTED LINING

Joints

Page 39: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 39 27. September, 2004

39

D2

39393939

Seite 39 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Dowels

Page 40: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 40 27. September, 2004

40

D2

40404040

Seite 40 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Deformation [mm]

For

ce [k

N]

Dowel CONEX Dowel SOF-CLIP Dowel ANEXBUCLOCK (Heavy Duty) BUCLOCK (Standard)

Dowel ANEXcapacity: 97,0 kNmax. def.: 15,0 mm

Dowel CONEXcapacity: 102,0 kNmax. def.: 15,6 mm

Dowel SOF-CLIPcapacity: 97,6 kNmax. def.: 23,0 mm

Dowel BUCLOCK(Standard)capacity: 60,0 kNmax. def.: 20,0 mm

Dowel BUCLOCKHeavy Dutycapacity: 100,0 kNmax. def.: 20,0 mm

Shear capacity test curves of dowels

Page 41: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 41 27. September, 2004

41

D2

41414141

Seite 41 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Steel Dowel

Page 42: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 42 27. September, 2004

42

D2

42424242

Seite 42 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Example for dowel hole in radial joint

Page 43: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 43 27. September, 2004

43

D2

43434343

Seite 43 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Segment Tolerances

Page 44: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 44 27. September, 2004

44

D2

44444444

Seite 44 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Tolerances

SEGMENT PARTITION +-0.02°

THICKNESS +-3mm

RAD

IUS +-2m

mR

ADIU

S +-

1mm

+-1mm

CIRCUMFERENTIAL LENGTH +-1mm

Page 45: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 45 27. September, 2004

45

D2

45454545

Seite 45 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Tolerances

LENGTH +-1mm

DIAGONAL CORD +-1mm

WID

TH

+-1

mm

WID

TH

+-1

mm

Page 46: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 46 27. September, 2004

46

D2

46464646

Seite 46 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

System requirements related to applicationand utilization

Segment systems for railway tunnelsSingle- and double-lining systemsAll systems except „hexagonal system“ in use

Segment system for Metro tunnelsMostly single-lining sealed systemAll systems except „hexagonal system“ in useBasically universal ring and left-right-systems

Page 47: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 47 27. September, 2004

47

D2

47474747

Seite 47 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

System requirements related to applicationand utilization

Segment systems for road tunnelsSingle- and double-lining systemsAll systems except „hexagonal system“ in useRegarding sealing function all feasible

Segment system for water galleries and tunnelsMostly single-lining systems with open segment layerClosure of joints ex postMostly parallel ring systems (with correction segments) and hexagonal segments in use

Page 48: MECHANIZED EXCAVATION OF D2 LONG TRANSPORT TUNNELSd2-consult.cz/seminar2008/Beil_Segmental_lining.pdf · 2014-04-10 · Seite 1 27. September, 2004June 17, 2008 1111 MECHANIZED EXCAVATION

Seite 48 27. September, 2004

48

D2

48484848

Seite 48 27. September, 2004

Andreas BeilConcrete Segments for Tunnel Linings – Field of Applicat ion and Design

June 17, 2008

Thank youfor your

attention!