Mechanical Plumbing - Fire Protection BIM Services...quality, handling materials and reducing cost...
Transcript of Mechanical Plumbing - Fire Protection BIM Services...quality, handling materials and reducing cost...
Mechanical Plumbing - Fire Protection BIM ServicesRevolutionizing The MEP Industry
ww
w.p
innacl
eca
d.c
om
3D BIM Model
Coordination and Clash Resolution
Design Validation
Constructibility Review
Quantity Take-off
Shop/Installation Drawings
Block out Drawings/Sleeve/Penetration Drawings
Trimble Field Solutions
Fire Protection
Prefabrication and Spool Drawings
Value Engineering
Revolutionizing MEP
Benefits of BIM in Mechanical & Plumbing
Expertise and Specialization
QC Process
Work Process
Testimonials
Why Pinnacle?
Project Snap Shots
INDEX
COMMITMENT
We are committed to our core values and corporate mission:
Maximizing client value by adopting the latest technologies and innovations.
Improving project efficiency by streamlining workflow and providing high quality services.
Saving time by using a large global team to leverage time zone advantages.
Reducing client costs by up to 30% by harnessing a highly experienced global work force.
3
3
HVAC 4
Plumbing 5
14
15
16
17
18
Fire Protection 7
Value Engineering 13
Prefabrication 10
Bill of Material 6
Mechanical Room Modeling 9
COBie Data 10
Revolutionizing MEP
Benefits of BIM in Mechanical & Plumbing
VALUE ENGINEERING & SAVINGS: Reduces Material & Labour Cost, Installation Time, Enhances Safer Construction and Accessibility during pre & post construction. Optimizes Hanger Support, Shaft and Sheet Metal Cost, Resolves Constructability Issues, Saves time on RFIs and Avoids discrepancy with local codes in Model.
03
PROJECT MANAGEMENT: BIM Modeling services, allowing clients to get complete control of construction projects. 3D, 4D & 5D BIM facilitate project coordination, collaboration, asset management, risk mitigation, logistic planning and cost estimate.
CHANGE MANAGEMENT: In construction, change is constant and the opportunities for projects to get off track are endless. BIM takes care of Change Management, incorporating a balanced planning, evaluation and execution of change order to manage project effectively.
COORDINATION & EFFICIENCY: Streamline communication with 3D visualization among all stakeholders for quick decision making during design and pre-construction phase.
Efficiency eliminates RFI’s, work stoppages and rework by checking the accuracy and completeness of drawings before starting construction on-site/off-site.
Proper planning and coordination are the keys to the successful execution of projects in the construction industry. Building Information Modeling (BIM) allows stakeholders to create and examine virtual representations of the Mechanical, Electrical and Plumbing (MEP) systems and other utilities. The simulated 3D construction can be used to show design intent to owners with greater visualization, generate coordinated drawings for eliminating rework & change order and eradicate work-stoppages due of RFIs in view of availability of high degree of detailing within the model itself.
Pinnacle Infotech has been acknowledged as the global leader in providing innovative BIM solutions. We have received several awards and recognitions for our expertise, from the government and from various trade associations, including excellence awards, innovation awards and top exporter and highest job creator awards. NASSCOM, the
leading IT trade association, has acknowledged Pinnacle among the Top IT Innovators for 6 years, between 2007 and 2017. We are now an ISO 9001:2015 and Environment Management System (EMS) 14001:2015 certified company.
The successful completion of more than 5051+ BIM projects in 36 countries has provided Pinnacle with a deep understanding of international building codes and procedures. We recognize the importance of effective work process management and regular communication while delivering outsourced services. Our global delivery system allows us to maintain constant contact with our clients, making geographical separation meaningless. We have developed an ideal mix of infrastructure, experience, global presence and commitment to excellence that has led to long-term relationship with more than 1151 clients worldwide.
HVAC
A model of the HVAC system, including Hangers, Trapeze and seismic restrainers, is created and augmented using information from architectural, structural and other trade and utility sources. The final model is generated after resolving all clashes by re-routing ductwork, changing elevations and duct re-sizing. We produce the detailed shop-drawings for installation, spool-drawings for pre-fabrication and various other drawings for field automation using GPS equipment. We follow SMACNA and other local codes as applicable for projects. We have an ISO certified process to document the client's standards and preferences to ensure complete compliance.
Block-Out Drawings are required before a contractor can start pouring concrete on the site. Block-Out Drawings are created from the coordinated BIM model after alignment with the architectural grids. Our experienced team keeps the necessary clearances for the block-out as per the contract documents and construction codes.
Block-Out/ Penetration Drawing
Equipment Pad Layout
Equipment Pad Layouts need to be accurately determined to ensure the proper installation of MEP equipment along with access clearance. BIM model provides accurate pad layout with reference to the architectural grids and structural drawings along with access clearance.
04
05
Shop Drawings
Shop Drawings are created based on project standards and are useful to contractors, fabricators, suppliers and manufacturers during construction. BIM is highly useful for construction of any irregular or complex structures. We generate accurate sleeves, penetration and hanger locations from the BIM model before start of construction. These drawings are generated directly from coordinated BIM models and are detailed enough for workshop fabrication and/or on-site construction.
Plumbing
Model Coordination & Clash Resolution
The plumbing model is created from the contract/design drawings in strict compliance with contract specifications, technical submittals and the relevant codes (UA/EU or the country/state codes, UPC/IPC and other local codes.
We generate a coordinated BIM model after resolving the clashes among all the trades (Architecture, Structure, Concrete, Mechanical, Electrical, Plumbing, Fire Protection, etc.). Clashes are resolved through WebEx meetings / sharing 3D clash snapshot. Clashes are resolved by re-routing utilities, changing elevation and re-sizing. Value Engineering is also offered to improve system efficiency, reduce costs and easier construction and maintenance.
06
Installation Drawings
We provide detailed Installation Drawings to help the contractors in planning and installing plumbing services efficiently.
Insert & Hanger DrawingSleeve Drawing
Mechanical Bill of Material
BIM model generates accurate quantity of all materials. These quantities are automatically updated with any changes in the BIM model. Bill of Material (BOM) reports can be formatted in MS Excel and exported to a database for detailed analysis. Quantities can be generated for a specific time period or project area (4D/5D) to help manage material procurement and save inventory costs. BOM covers all duct, duct-fitting, equipment, hanger, etc.
Bill of Material / Quantity Take-off
The significant benefit of 3D modeling is accurate quantity information. Bill of Material can be detailed and tabulated as per the client requirement for procurement, fabrication and installation. It is software generated and automatically updates with the changes in the model.
Sleeve, Inserts and Hanger Drawings
A critical component of plumbing project is proper sleeve location, inserts, and hanger positions. We can generate accurate sleeve, penetration, and hanger locations from the plumbing model prior to plumbing installation. These drawings can be directly downloaded on GPS instruments for fast and accurate layout on-site.
Plumbing Bill of Material
The significant benefit of 3D modeling is accurate quantity information. Quantity take-off can be detailed and tabulated as per the client requirement for procurement, fabrication and installation. It is software generated and automatically updates with the changes in the model.
07
Fire Protection
Coordinated Model
A clash free Fire Protection model is developed by using revit software. The model reflects the exact location of every equipment like pump, fire hose cabinet etc. as well as pipe routing and sprinkler position. To develop this model we are always considering the value engineering like improve system efficiency, cost reducing by rerouting the pipe network and relocate the fixture/ equipment.
Fire Protection: Pinnacle specialize in fire fighting design validation, 3D modeling with shop drawings and have emerged as a favored BIM service provider. We follow NFPA Standard 13 for Installation of Sprinkler Systems, NFPA 14 for Installation of Standpipe and Hose Systems, NFPA 20 for Installation of Stationary Pumps for Fire Protection, NFPA 17 for Dry Chemical Extinguishing Systems, NFPA 22 for Water Tanks for Private Fire Protection and NFPA 2001 for Inert Gas based suppression system.
Coordinated Model
08
Sprinkler Coverage Area Review
We check the coverage area of every individual sprinkler and ensure the total building is under the coverage of sprinkler.
Shop Drawing
Shop Drawings are provided to the contractors from the coordinated model for installation the service efficiently.
Sprinkler Coverage Area Review Shop Drawing
3D Equipment Model
Fire Suppression System Tank
Pendent Sprinkler Dry Valve Fire Pump
Bill of Material
3D coordinated model helps to generate the the exact quantities of material, fixtures and equipment. It helps the contractor to plan and estimate the project cost.
Bill of Material
09
Mechanical Room Modeling
A building's mechanical room is the hub of its heating, ventilation and air conditioning system. This can include central utility plants, boiler and chiller rooms, especially equipment used to control the environment in a building. The specific equipment found in a mechanical room depends on what is needed for the particular building in which it is located as well as local building codes. For example, boilers heat water supplied to the building either through pipes to heat the air or for direct use such as in a kitchen. Chiller tubes and compressors may be used to circulate chilled water through the building for cooling purposes. Heat transfer coils, pumps, fans, motors, and numerous other items may also be found
in mechanical rooms.Design considerations for a mechanical room include appropriate equipment layout and effective drainage. Equipment must be laid out so that there is sufficient room for regularly scheduled maintenance and repair. Sufficient ventilation of the room helps prevent overheating of mechanical equipment such as boilers, water heaters, hot water pipes, and others. The floor of the room should be properly pitched toward drains and be free of depressions where condensation or hazardous chemicals could collect.
3D Equipment Model
Compressor Hot Water Pump
Mechanical
Valve Kitchenette
Plumbing
Actual Virtual
10
Title COBie COBie for QF FM, prepared by Pinnacle Infotech Solu�onsVersion 2 1Release 4 0Status IFC2x3Region en-USPurpose This spreadsheet supports the exchange of building, system and product informa�on through the life of the project.Outline Individual worksheets are organized by project phase as shown below
All Phases Sheet ContentsContact People and Companies
Early Design Worksheets Sheet ContentsFacility Project, Site, and FacilityFloor Ver�cal levels and exterior areasSpace SpacesZone Sets of spaces sharing a specific a�ributeType Types of equipment, products, and materials
Detailed Design Worksheets Sheet ContentsComponent Individually named or schedule itemsSystem Sets of components providing a serviceAssembly Cons�tuents for Types, Components and othersImpact Economic, Environmental and Social Impacts at various stages in the life cycle
Construc�on Worksheets Sheet ContentsNote: all submi�als added under Documents with approvalsNote: manufacturer, model, serial, and tag added on Component
Opera�ons and Maintenance Worksheets Sheet ContentsSpare Onsite and replacement partsResource Required materials, tools, and trainingJob PM, Safety, and other job plans
NOTE: Warranty informa�on added on 'Type' worksheet
All Phases Sheet ContentsDocument All applicable document referencesA�ribute Proper�es of referenced itemCoordinate Spa�al loca�ons in box, line, or point formatConnec�on Logical connec�ons between componentsIssue Other issues remaining at handover
Legend
Text Required
Text Reference to other sheet or pick list
Text External reference
Text If specified as required
Text Secondary informa�on when preparing product data
Text Customized for QF FM applica�on
Text Not required for the given phase
NotesNOTE: Regional, owner, or product specific data may be added as new columns to the right of standard templateNOTE: Regional classifica�on codes may be subs�tuted for the specifiable picklists used in the United States.
Copyright USACE ERDC (c) 2006-2013
Prefabrication
Prefabrication refers to the creation of building components at a factory or manufacturing site, before they are assembled onsite. Modular construction is a type of prefabrication where building components are constructed in box-like modules and transported to the building site for final assembly. Whether to increase quality, improve programs or to deliver margins, Prefabrication has continually demonstrated that it can benefit all stakeholders within a project. Pinnacle provides Digital Prefabrication and helps customers get real-time examination of every system, making up the final project, improving quality, handling materials and reducing cost significantly. We produce fabrication drawings from the BIM model for accurate off-site/on-site pre-fabrication. Our segmented spool drawings and spool maps are generated as per the standards and preference of our contractors. Moreover, by combining prefabrication with BIM, the prefabricators can partake in the design process from the beginning of the project, saving time.
All required COBie parameters to be available
System Connection is establish in between Source and destination of all services
Asset or equipments families are modeled as per MBS
Detail connector is provided in individual Equipment Families
COBie extension Sheet 2.4 is linked in the model itself
COBie Data
Key Advantages
Reduced construction costs, especially when combined with economy of scale production (10%+)
Reduced construction time on site (50 to 60%) Increased site productivity (up to 50%)
Reduced wastage in manufacture and on site
Greater reliability and quality
11
Modularization – A Paradigm Shift
Modular Construction - This shows How Modularization is bringing a paradigm shift. The images displayed above show Traditional Installation using Individual Hangers and the adjacent image shows modular construction.
Re-locatable buildings constructed offsite in controlled settings
Modular construction sites proved safer than traditional on-site building
Corridor Module - Best Implementation of Modular Construction
12
Advantages of Modular Construction beyond Prefabrication
Modular Prefabrication- All disciplines integrated to create fully coordinated modules
Modular racks installed into ceiling /corridor /mechanical space as per requirements
Replace the “stick” building process - each service installed piece by piece and site coordination
Significant reduction in time and costs
Spool
Spool Drawings can be generated from the model for accurate pre-fabrication off-site/on-site. Segmented Spool Drawings are generated in accordance with the contractor’s pre-fabricating standards and preferences.
Spool detailing - isometric Spool detailing - isometric
Implementation of Prefabrication and Module Construction for a Riser
13
Value Engineering
A proven management technique for generating benefits and improving the value of construction projects. Value Engineering through BIM helps in better constructability review and helps saving cost by eliminating clashes and simplifying complex design without impacting the MEP components.
Improves System Effectiveness & Constructability
Reduces Material & Labor Cost
Lowers Installation Time
Enhances Safer Construction
Ease in access during construction & post construction stages
Hanger Support Optimization
Sheet Metal Cost Optimization
Benefits of Value Engineering
Resolves Constructability Issues
Coordinates MEP Utilities
Clean layout for MEP Model
Shaft Optimization
Saves time on RFIs
Avoids discrepancy with local codes in Plumbing Model
Central Plant / Mechanical Room Layout - Before Central Plant / Mechanical Room Layout - After
Inputs as received in Contract Document Value Engineered by Pinnacle
14
Quality Control Process
QC 2
Screen Check
Performed by QC Dept./Team
DELIVERY
TO
CLIENT
100% Quality
QC 1
Plot Check
Performed by Production Team
QC 3
Pre-Shipment Check
Performed by Project Manager
QC Check Phase I
The model is plotted on paper and a preliminary grid by grid check is done comparing it with the original contract documents. Member of the Project Management team assists in this process.
The project team leader sends status report to the QC Department to begin QC Phase II.
QC Check Phase III
The Project Manager conducts the pre-shipment check before sending them to the client.
QC Check Phase II
The QC Team performs a more detailed comparison of the Contract Documents against the 3D BIM model. Specific Checklist is prepared to review/check the deliverables. Their main objective is to review, identify and address the following:
The QA/QC Team continuously interacts with the Project Lead and other team members to resolve all technical issues related to the project.
Missing data (if any)Compliance with contract documentsClashes (Old/New), Elevation, Routing, Fittings, etc.Construction point of view.Fly-Zones requirementsAttribute Checking (Pressure class, Pipe material, etc.)Location of Equipment such as VAV, Sleeves, Hangers, Valves.Equipment Connection details as per Schematic Drawings.Equipment Models as per Technical Submittals.Annotations & Dimensions, Aesthetic View.Miscellaneous issues
Our QC process is ISO 9001:2015 certified and managed by an independent QC team. We have implemented Environment Management Systems (EMS) 14001:2015.
The main objective of the quality control (QC) process is to detect errors and rectify it. Ensuring quality is a group effort and our dedicated QC team is led by a highly qualified and experienced Manager in M&E Coordination and Quality Control.
The entire QC process is handled in three phases:
Work Process Flow Chart
15
CLIENTArchitects / Engineers / General Contractors / Sub-Contractors
ESTIMATION TEAM
CO
NTR
AC
T S
TAG
E
US BASED
RELATIONSHIP MANAGER
Inputs/Redline Markups/ Comments
PROJECT
FEEDBACK
Deliv
era
ble
s Escalation
BIM PROJECT MANAGER (Point of Contact)
• Kick off Meeting(Upon receipt of Project Order)
• Web Meetings
• RFIs/Clarifications
• Progress Status
• Change Management
• File Delivery
• Quality Check - Stage3
(Checklists, Coordinated Model, Client standard, RFIs)
• Invoice
• Project Closure
SERVICE DETAILS1• Bill of Material
• Rendering
• Walkthrough/Animation
• 4D/5D Phasing
23
Architecture Civil Structure
• 3D Model• General Arrangement Plans
• Assist Material Selection Detailing
• Code interpretation
• Concept 3D Model (LOD100/200)
• Outline Drawings
• Concrete volume• Rendering and Animation
Architecture Civil Structure
• 3D Model• Construction documentation• Assist Design options
• Assist Space Planning
• Constructability Report
• Rendering /Animation
• Shop/Lift Drawing and Details
• Reinforcement Drawings and Bar bending Schedule (BBS)
• Detailing
• Redline updates• RFI
• Bill of Materials
Mechanical Electrical Plumbing Fire Protection
• 3D Model• General Service Layout
• Design Assist
Mechanical Electrical Plumbing Fire Protection
• 3D Model• Individual Service Drawings
• Combined Service Drawings
• Assist Load Calculation• Assist Design Development
• Constructability Review
• RFI
4
Architecture Civil Structure• 3D Model
• Constructability Review
Mechanical Electrical Plumbing Fire Protection
• 3D Model
• Constructability Review
• Service Layout Modification
• Clash Report Generation
• Lead in Coordination Process
• Project Sign-off
• Combine Service Drawing
• RFI Management
5
Architecture Civil Structure
• Shop Drawing
• Lift Drawing and Details
• Bill of Material
Mechanical Electrical Plumbing Fire Protection
• Shop Drawing
• Fabrication Drawing
• Spool Drawing
• Bill of Material
6• Scan to BIM
• Asset Information Model
• COBie
• 2D Drawings/Redline Update
• Document Collaboration
• Bill of Materials
Center of Excellence
• Process Monitoring
• Tool Support
• Technical Support
• Research & Development
• Knowledge Sharing
• Project Health Check
SERVICES
OU
TPU
T
EXEC
UTI
ON S
TAG
E
QU
ALI
TY C
HEC
K -
Sta
ge 1
& S
tage
2As p
er S
chem
atic, IF
C, R
ece
ived In
form
ation, L
ate
st I
nputs
, Code, S
peci
fica
tion C
heck
list, Q
ualit
y C
heck
list, E
quip
ment s
ubm
itta
l, R
FI re
sponse,
Constr
uct
abili
ty, M
ark
up, C
om
ments
1
Business Presentation
2
Design Development Support
3
Pre-Construction Support
4
BIM Modeling & Coordination Support
5
Construction Support
6
As-Built Support
MARKETING TEAM
Request For Proposal/Scope
Scope Clarification&
Proposal
Agreement / Purchase Order
SERVICES
16
Why Pinnacle?
Quality Output
Our Quality Control Team is led by employees who have more than 30 years of experience. Our process orientation & quality control is as per ISO 9001:2015 and ISO 14001:2015 standards. Our Pre-construction & Pre-fabrication reviews with RFI generation help clients make better use of manpower and improve the quality of construction, reducing rework and wastage. Detailed Material BOQ & Shop Drawings with 3D visualization enable a better look at “The Big Picture” and aid in the review, scheduling and monitoring of each project.
Pinnacle is a global leader in providing innovative BIM services. Our in-house team of more than 1250+ experienced Architects, Engineers and BIM professionals helps us provide end-to-end solutions to discerning clients around the world. Our 3,80,000 sq. ft., multi locational, world-class production facility is equipped with high-end workstations, advanced servers with real time backup and a high speed data and voice network. Prompt interaction with US Based Relationship Mangers for Consultation and Solution. There is a 24 x 7 uninterrupted power supply security system by CISCO.
Fast Turnaround
Our skilled team of professionals can provide quick turnarounds on complex projects. Pinnacle has successfully completed several large-scale projects across multiple verticals.
Less Expensive
Clients rely on us for our top-of-the-line services at reasonable rates. We help clients assemble projects in a virtual environment for identifying and correcting potential problems before construction. We offer cutting-edge advantage in terms of Building Information Modeling services, facilitating project coordination, collaboration, asset management, risk mitigation, logistic planning and cost optimization.
Technical Strengths
Our professionals use the latest BIM software: Autodesk Suite (Revit, all versions), AutoCAD Architecture, MicroStation, Navisworks, Inventor, AutoCAD Civil 3D, Plant Design Suite, Pro/Engineer, SysQue, All Plan, Adobe Photoshop, Adobe Illustrator, Adobe After Effects, 3DS Max, Tekla Structure, SolidWorks, Autodesk Fabrication Suite, SketchUp, Bluebeam, PIPENET, and other design software. As we have a deep understanding of global and regional codes and standards, we have ensured that our Quality Management System is as per ISO 9001:2015.
Global Presence
Pinnacle has offices around the world (USA, UK, UAE, ITALY, INDIA - Durgapur, Kolkata & Jaipur) enabling us to serve our clients around the clock.
Experience in BIM Domain
We have a global experience of 15+ years and have successfully collaborated with several leading contractors on BIM projects for specialty hospitals, stadiums, universities, dams, apartment
Communication
Pinnacle's Project Management team is available to clients through a number of communication channels including: 1. Global telephone networks for instant communication2. Amazon Web Service (S3) for file transfers3. Email (on Google server) for reports and interactions4. Video and teleconferencing for presentations and conversations5. Web conferences with US based phone systems6. BIM collaboration through BIM 360, Revizto, Bluebeam Studio etc.7. Newforma project information management system8. Engagement of US based Relationship Managers
complexes, hotels, casinos, large retail center, high school, airport, commercial buildings, convention center, high rise towers, and industrial projects.
Canada
CA
Aruba
Brazil
FinlandSwedenNorway
Ireland
France
Turkey
SAUDI ARABIA
Delhi
Hyderabad
Sanghai
Japan
Singapore
WA
Production Centres
AZ
Puerto Rico
Australia
Columbia
Iraq
Kazakhstan
LibyaMexico
Rwanda
Sri Lanka
OR
NV
MT
TX
PA
NYMI
MA
NJRI
CO
MN
OK
OHIN VANC
ALGASC
FL
MDDCIL
West Indies
LA
TNKY
Lebanon
USA
INDIAOman
Kuwait
UAE
BahrainJordan
Israel
QatarRiyadh
SWITZERLAND
Denmark EUROPE
BelgiumNetherlands
Malaysia
China
UK
DURGAPUR
KOLKATA
JAIPURDUBAI
Abu Dhabi
ITALY
LONDON
HOUSTON
Germany
Global Leader in BIM Engineering
Testimonials
17
“Communication between different time zones has its challenges. One must be completely clear about what they want and offer. Considering the 11:30 hr difference I am very pleased with the results. The correspondence I received was cordial and concise. The product I received was prompt and well developed.”
Patrick Madrid | U.S. Engineering Company
“Team has done an amazing job so far on this project. The projects deadlines are constantly changing and this team has been able to keep up and meet all deadlines. They have been outstanding to work with and I hope to continue to work with them on other projects in the near future.”
Leonard Musselle | Comprehensive Energy Services, Inc
“Pinnacle team exceeded my expectations on this project. The Sample Booth project was built into an existing warehouse building at GNE and placing a validated project in that environment was a challenge to say the least. The Team even modeled the Arch & Structural components in efforts to show GNE the constraints of the installation.”
Tom Zimmer | United Mechanical
“The drawings were what we had discussed and they were done on time. Communication on missing items and issues was very good by Pinnacle. Pinnacle follows up to make sure they have the answers needed and are very professional.”
Michael A Rivera | Heating & Plumbing Engineers INC
“The spool annotation we received and the quality of the work was excellent, every sheet was well organized and very detailed, you understand our dimension requirement. Thank you!Overall, this was really well done!”
Aven Wu | Moden Niagara Alberta Inc.
“The experience has been good working with Pinnacle. The Pinnacle team pushes to get all the correct info before starting a project and return a quality finished project in a timely fashion.”
Anthony Warren | Minton & Robertson
“This was a difficult project because we changed CAD platforms half way through. Thank you for working with us on all the changes and revisions to complete the job.”
Jason Pecha | Iron Mechanical
“Pinnacle's team has done a wonderful job for us. The team was very professional and responsive to our needs. Any changes that needed to be implemented were completed and turned around to us in a very rapid manner. Your services will allow us to build a culture of prefabrication going forward and we anticipate doing more business with Pinnacle in the future.”
Mickey W. Cantrell, II | Keith Lawson Mechanical
“As with all of the previous projects that we have worked with Pinnacle on, this project came together seamlessly and without any problems. The Pinnacle team is very detailed in their approach, always meets our demanding schedules, and always with excellent quality in the finished product. There are not many companies that work for/with us that can keep up with our pace, but Pinnacle can every single time. I would personally recommend them to anyone in need of BIM, CAD, and drawing coordination services.”
Jeriot Burr | Rivers Plumbing and Electric
The project was very confusing and difficult for all parties, Pinnacle team did a great job understanding the project and working with us to get it to a good position. We are very pleased with the performance of Pinnacle overall.
Corey Gray | Bernhard MCC
We made some VDC team member changes midway through this project and Pinnacle stepped up and gave us the attention and support to get the job done. Since the change, our Project Managers have learned a lot and gained an enjoyable relationship & comrade with the Pinnacle Infotech Team members assigned to
Phillip Doran | RKS Plumbing and Mechanical
Project Snap Shots
LOCATIONBIM ENDDATE
PROJECT AREAAVG. TEAM SIZE
PROJECT NAMECLIENTROLE
SECTORSCOPE OF WORK
18
Culver City, California, USA
704,812 sq ft & 859,184 sq ft
MechanicalContractor
Ivy Station Wilshire
Our scope of work for the project included:1. 3D BIM Model Creation of Plumbing services - Plumbing pipes with associated pipe fittings, accessories, equipment modeling & hangers2. BIM Clash Coordination with other trades3. Plumbing Service Shop Drawing Creation - Detailed 2D Drawings showing annotations and dimension tagging
October2018
4 Engineers
Mixed Use
Tempe, Arizona, USA
354,000 sq ftMEP Sub Contractor
ASU - Arizona State University Hayden Library
Model Creation of Plumbing, Sheet Metal & Mechanical Piping of all buildings, BIM Clash Coordination, Preparation of Shop Drawings/2D Drawings for Plumbing, Sheet Metal & Mechanical Piping, Facility Management
October2018
6 Engineers
Library
Honolulu, Hawaii, USA
109,828 sq ftMechanicalContractor
St. Francis Healthcare System
Our scope of work for the project included: 1. 3D Model Creation of Sheet Metal & Mechanical Piping of all buildings 2. Basic Coordination (3D coordination, clash mitigation) 3. Preparation of Shop Drawings/2D Drawings for Sheet Metal & Mechanical Piping (2D drawings of Sleeve Deck/Wall, Riser) - 2D drawings prepared showing annotations, dimensions and tagging
May2018
6 Engineers
Hospital
Washington DC,USA
10,000 Sq ftGeneralContractor
The G30 Project: Phase I & II- Boiler & Chiller Plant Room
3D Model Creation of all elements as per point cloud
February2018
8 Engineers
Industrial Plant Room
Sylvania, Georgia, USA
734,986 sq ftMechanicalContractor
Worth County High School
Our scope of work for the project included: 1. Plumbing 3D Model Creation of all levels including pipes, associated fittings, accessories & equipment 2. 2D Clash Coordination with Architecture & Structure 3. Preparation of 2D Drawings/Shop Drawings - Drawings for New Construction of Sub-Basement, Basement, 1st Floor, 2nd Floor, Attic Level & Roof4. Using rack hanger for corridor areas 5. Preparing rack spool
December, 2017
4 Engineers
Educational
Marina Del Rey, California, USA
1,182,800 sq ftMechanicalContractor
Neptune Marina
Our scope of work for the project included: 1. 3D model creation of ductwork and mechanical piping with hangers, associated fitting, valve, equipment & accessories 2. Preparation of Shop Drawing, Insert & Hanger 2D Drawings for Garage & Podium Levels
July, 2017
4 Engineers
Hospital
Nashville,Tennessee,USA
460,000 Sq ftMEPContractor
JW Marriot Hotel
Our scope of work for the project included creation of 3D Models of Sheet Metal, Mechanical Piping and Plumbing (accessory, equipment and fittings) of all buildings, Basic & Other trade coordination as well as preparation of Shop Drawing/2D Drawings for HVAC, MP and PL trades. We provided As-Built Updates as per mark-up drawings and facility management as per available information.
June2017
6 Engineers
Hotel
Texas, USA
429,347 sq ftMEPContractor
Twelve Cow Boys
BIM Model Creation of Fire Protection Trade, BIM Coordination with Clash Resolution, Shop Drawing Preparation - Detailed 2D drawing creation,As-Built Drawings
November2018
4 Engineers
Residential
Project Snap Shots
LOCATIONBIM ENDDATE
PROJECT AREAAVG. TEAM SIZE
PROJECT NAMECLIENTROLE
SECTORSCOPE OF WORK
19
Tampa,Florida,USA
462,000 Sq ftMEPContractor
The Manor at Harbour Island
Our scope of work for the project included:Mechanical & Plumbing underground modeling, Coordination & Shop drawing creation - Modeling comprised of transition floor, apartment unit, HVAC ductwork, Shop Drawings included Shaft & Stair Case, Sleeve drawings, Roof equipment pad layout
December 2016
5 Engineers
High-Rise Residential
Huntington Beach, California, USA
212,720 sq ftMechanicalContractor
Hilton Water Front Beach Resort
3D BIM Model Creation, Shop Drawing & Spool Drawing of Mechanical and Plumbing components (including associated accessories, fittings & equipment)
December2016
5 Engineers
Hotel
OrlandoFloridaUSA
473,260 Sq ftMEPContractor
Orlando City Soccer Stadium
Our scope of work for the project included creation of 3D Plumbing Model for Coordination among various trades, Hanger placement in the Model and Sleeve Drawing preparation.
August 2016
5 Engineers
Stadium
Tampa,Florida,USA
700,000 Sq ftMEPContractor
Florida Hospital, Carrollwood
Our scope of work for the project included creation of 3D plumbing models of pipes, pipe fittings and accessories, updation/validation of the model as per client specification, hanger placement, coordination and shop drawing preparation in Revit.
May 2016
4 Engineers
Hospital
New Orleans,Louisiana,USA
927,000 Sq ftMEP Contractor
New Orleans International Airport
Our scope of wok for the project included 1. 3D Model Creation of Sheet metal 2. Coordination based on the clash report provided by the client 3. Shop Drawing/2D Drawings for Sheet Metal 4. As-built Update as per mark-up drawings 5. Facility Management 6. BOQ 7. Trimble drawings 8. CAM drawings 9. Block-out Drawings.
April2016
50 Engineers
Airport
Las Vegas,Nevada,USA
791,700 Sq ftMEPContractor
Monte Carlo Concert Hall
Pinnacle's scope of work for the project included: 1. Mechanical Piping and Plumbing Model Creation 2. Hanger Placement 3. MEP Clash Coordination (Ducting, Fire Protection and Electrical Model provided by client) 4. Preliminary Shop Drawing Creation
March2016
8 Engineers
Concert Hall
Miami,Florida,USA
507,000 Sq ftMEPContractor
P620 Studio
Our scope of work for the Project included 3D Model creation with different types of Hangers as well as Coordination and preparation of Shop Drawing, Sleeve Drawing, Spool Drawing, Equipment Pad Layout, As-Built Drawing and BOQ or Quantity Take-Off. Full coordination was done by us and other trade coordination was done as per the clash report provided by the client.
January2017
3 Engineers
Studio
Pensacola,Florida,USA
1,752,223 Sq ftMEPContractor
Navy Federal Credit Union Office Building (Phase 2)
Our scope of work was to provide coordinated 3D models for all the levels with complete construction information as well as shop and sleeve drawings. Moreover, we were responsible for providing hanger placement for HVAC & Mechanical Piping and penetration information for deck.
April2017
3 Engineers
Office & Amenity Building
ww
w.p
innacl
eca
d.c
om
Italy Office
Phone: + 39 0341630070Email: [email protected]
Nunki di M.Brossa,Via Calvi, 10 - 23801Calolziocorte, LC - Italy
Jaipur Office
Plot No - IT-A-016-E, Mahindra World City, (Jaipur) LTD, PO - Mahindra World City, Tehsil - Sanganer, Jaipur - 302037
Pinnacle Infotech Solutions
Texas, USA
Dubai, UAE
Lecco, Italy
Kolkata, India
Durgapur, IndiaJaipur, India
London, UK
Pinnacle Infotech Inc.
6161 Savoy Drive #1125,Houston, TX 77036Phone: 713 780 2135Fax: 713 780 8784Email: [email protected]
USA Office
Biswanath TodiOperations ManagerCell: 832 283 6628
International Office Locations
UAE Office
Office No – 307, 3rd Floor, Building No. 7 PO Box - 345869, Dubai Outsource ZoneDubai, UAE
Pinnacle Infotech Technologies FZ-LLC
Kuntal Chakraborty
Phone: +971 55 736 3498Email: [email protected]
Zurich, Switzerland
India Office Locations
Pinnacle Infotech Solutions
S.S.B. Sarani, Bidhannagar, DurgapurWest Bengal, India - 713212Phone: +91 343 6602222 / 6602231–35Fax: +91 343 6602230
Durgapur Office UK Office
Pinnacle Infotech Limited
Switzerland Office
Transcon InternationalSpirackerstrasse 258044 GockhausenSwitzerland
Kolkata Office
Plot - II/F/11, Block - 4B, 4th Floor, Room No. 402,Ecospace Business Park, New Town, Rajarhat, Kolkata - 700156
Pinnacle Infotech Solutions
Email: [email protected]
Email: [email protected]
Pinnacle Infotech Inc.
Phone: +91 141 722444Email: [email protected]
The Barley Mow Centre, 10 Barley Mow Passage, London, W4 4PH, UK
David BrownPhone: +44 77 9852 8673Email: [email protected]
Bernhard Kössler
Email: [email protected]
Phone: +41 56 535 3267