Mechanical Installation Workflow
GE proprietary and confidential – Limited diffusion - Internal use only
New architecture (reminder)
22017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
• New cabinet C-FRT instead of C1&C2
• New cabinet PDU compatible UL & CE instead of PDB
• New On/Off management
• New UPS 8KVA � choice between 1, 8 or 20KVA
• Digital Video Distribution introduction (19’’ LCD/LDM)
• LD solution integrated in C-Frt
• New Suspension with Dual Arm (DAS)
� New HW platform introduced on monoplane systems only
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
32017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
Torque 206 Nm
� Mech install same as DAS Analogic (Addendum DOC1974960 & DOC1957173)
� Installation Time: 2 Hours x 2 FE
� Content / Change overview: • The suspension is pre-mounted and pre-cabled • Lift the system and route the internal cables through the central hole of the substructure• Fix the system to the ceiling substructure
� Maintenance: • Same process as current suspension
DAS digital Installation (IST0542) DAS digital Installation (IST0542)
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
42017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
RAD SHIELD & SURGICAL LIGHT SUSPENSIONSRAD SHIELD & SURGICAL LIGHT SUSPENSIONS
Refer to manufacturer installation manual delivered with the 3rd party equipment.
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
52017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
Installation of Group 1 � (Technical room to Exam room)
Installation of Group 2 � (Technical room to Control booth)
Installation of Group 4 � (optional monitors)
Installation of Group 3 � (inside the Technical room)
Installation of option like Fast Link, ECG Cable, Diamentor Cable…
(7X) Installation of Group 5 � (Exam room to Technical room)
SYSTEM CABLE ROUTING (IST0532) SYSTEM CABLE ROUTING (IST0532)
Key Point: - Constraint of routing
between PDU to C-FRT = AWG2 (35mm²) Lg 6m
GE proprietary and confidential – Limited diffusion - Internal use only 62017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
72017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
Installation of Group 1 � (Technical room to Exam room)
Installation of Group 2 � (Technical room to Control booth)
Installation of Group 4 � (optional monitors)
Installation of Group 3 � (inside the Technical room)
Installation of option like Fast Link, ECG Cable, Diamentor Cable…
(7X) Installation of Group 5 � (Exam room to Technical room)
SYSTEM CABLE ROUTING (IST0532) SYSTEM CABLE ROUTING (IST0532)
Key Point: - Constraint of routing
between PDU to C-FRT = AWG2 (35mm²) Lg 6m
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
82017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
CABLE ROUTING (IST0532) CABLE ROUTING (IST0532)
Key Points:
• Mis Map with color by cable groups
• Constraint for routing cable between PDU to C-FRT (Jedi Power MIS 29287A) = AWG2 (35mm²) Lg 6m and specificrouting on the CFRT (see IST0530)
• Only one cables length (24m)
• Additional video cables:- No labels- Equipped with rings to customize on site
WARNING! for config IGS 7OR:• J59 labelled « not use » is for
iPoint 2 ethernet cable
• J5 labelled « Table ITU » isfor iPoint 1 ethernet cable
GE proprietary and confidential – Limited diffusion - Internal use only 92017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
102017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
CABLE ROUTING (IST0532) CABLE ROUTING (IST0532)
Key Points:
• Mis Map with color by cable groups
• Constraint for routing cable between PDU to C-FRT (Jedi Power MIS 29287A) = AWG2 (35mm²) Lg 6m and specificrouting on the CFRT (see IST0530)
• Only one cables length (24m)
• Additional video cables:- No labels- Equipped with rings to customize on site
WARNING! for config IGS 7OR:• J59 labelled « not use » is for
iPoint 2 ethernet cable
• J5 labelled « Table ITU » isfor iPoint 1 ethernet cable
GE proprietary and confidential – Limited diffusion - Internal use only 112017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
Depending the use of the video cable (LIVE or REVIEW or ROADMAP) clip the correct color define by
the table on the 2 sides of video cable (clip are ship with cables)
NOTE : GREEN ring is for lateral
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
122017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
CABLE ROUTING (IST0532) CABLE ROUTING (IST0532)
Key Points:
• Mis Map with color by cable groups
• Constraint for routing cable between PDU to C-FRT (Jedi Power MIS 29287A) = AWG2 (35mm²) Lg 6m and specificrouting on the CFRT (see IST0530)
• Only one cables length (24m)
• Additional video cables:- No labels- Equipped with rings to customize on site
WARNING! for config IGS 7OR:• J59 labelled « not use » is for
iPoint 2 ethernet cable
• J5 labelled « Table ITU » isfor iPoint 1 ethernet cable
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
132017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
LC Gantry & TableLC Gantry & Table
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
142017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
PDU (IST0529) – HandlingPDU (IST0529) – Handling
• PDU has its own wheels and a ramp can be use to transfer cabinet from its pallet.
• 2 persons will be needed to push it in the proper direction and control speed
WARNING! The ramp is included in the packaging
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
152017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
PDU (IST0529) – HandlingPDU (IST0529) – Handling
WARNING! Ramp supports are located with the PDU
• Make the ramps supports and position them under the ramp
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
162017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
PDU (IST0529) – PDU configurationPDU (IST0529) – PDU configuration
• Based on UPS solution, 3 different terminal blocks are used � TB3 : 20 kVa (only yellow jumpers to remove)� TB4 : 8 kVa (only cables straps to remove)� TB5 : 1 kVa (only cables straps to remove)
1 kVA
8 kVA 20 kVA
WARNING! Keep on safe place all straps or jumpers removed
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
172017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
PDU (IST0529) – PDU ConfigurationPDU (IST0529) – PDU Configuration
• Voltage adaptation on primary transformer using red cables (U;V;W)
• Voltage adaptation on secondary transformer (for tube chiller) only using terminal blocks (X4;X5) or (X2;X3)
NOTE : The corresponding cables are labelled with both configurations
� Neutral : X2/X4� Phase : X3/X5
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
182017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
PDU (IST0529) – CablingPDU (IST0529) – Cabling
Connection is possible from the bottom or the Top of the PDU (nominal case is from the bottom)
• Connection from the bottom:� Route the main input power cable from MDP (L1;L2;L3 & PE) to TB0
block (L1;L2;L3) and to the horizontal ground bar (PE - separated)� To be routed through the right side of PDU
• Connection from the top:� Drill holes in upper panel (plastic) with appropriate sealing solution� Remove internal cables between terminal block TB0 and S1 switch�Connect main input power cable from MDP (L1;L2;L3 & PE) to S1
switch (L1;L2;L3) and to the horizontal ground bar (PE - separated)
• The PDU ground bar is now the ground reference for the system.
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
192017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
The cables have to be routed from the leftaperture of the PDU bottom entrance
X-Ray Light (pins 1 and 2)
Room Light (pins 1 and 2)
System ON Light (pins 1 and 2)
Mains status / UPS switch
PDU Output
EPO Spare
EPO PDU DOOR
EPO UPS
EPO MDP
UPS Output 230 V
MUPS Output 230 V
FUPS Output 230 V EPO Thermal sensor transformer
PDU (IST0529) – Cabling On/OFF boardPDU (IST0529) – Cabling On/OFF board
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
202017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
PDU (IST0529) – Mandatory FixationPDU (IST0529) – Mandatory Fixation
Once the cabling has been completed and no access to the rear of the PDU is needed, lower the four adjustable feet until they touch the floor. The cabinet must be stable and not mobile.
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
212017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
PDU (IST0529) – Kit seismic (option)PDU (IST0529) – Kit seismic (option)
For installation where an anti-seismic kit is required, reuse
the transportation brackets (1) and the seismic fixation on wall
(2) provided with the PDU
If part lost during delivery, orderFRU 5786251
WARNING : keep the key in the safe place but out of the PDU
1
2
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
222017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
C-FRT (IST0527) – HandlingC-FRT (IST0527) – Handling
• Like PDU, C-FRT has its own wheels
• 2 persons will be needed to push it in the proper direction and control speed
WARNING! The ramp is included in the package
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
232017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
C-FRT (IST0527) – HandlingC-FRT (IST0527) – Handling
• WARNING! Ramp supports are located with the C-FRT• Use wedge foam supports (2) to reinforce and stabilize the ramp
(1) to transfer cabinet from its pallet.
1
2
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
242017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
C-FRT (IST0528) – CablingC-FRT (IST0528) – Cabling
C-FRT Cabinet bulkhead
C-FRT JEDI power cable from PDU AWG2 (MIS 29287A)
Bulkhead(s) System ;
POS/System ; IGS ;
Power Input and Jedi.
Torque 10Nm
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
252017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
C-FRT (IST0528) – CablingC-FRT (IST0528) – Cabling
For power cables (A) connect
the shielding clamps to the
bulkhead JEDI
Mandatory cables routing
thru the holes.
Cables must be attached.
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
262017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
C-FRT (IST0528) – Cabling video splittersC-FRT (IST0528) – Cabling video splitters
• Live and Review video splitters are delivered by default and pre-mounted in C-FRT Cabinet.
• Ensure the transmitters DVI to RJ45 are connected to:� Live: Output 1 and 2 (for exam and control room)� Review : Output 1 (for exam room)
WARNING! Ensure the EMC foam is inserted on the RJ45 plugs
• Video splitter for roadmap is an option (to be installed on site)
Live (below) and Review (above)video splitters
EMC foam on the RJ45 plug
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
272017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
C-FRT (IST0528) – FixationC-FRT (IST0528) – Fixation
Once the cabling has been completed and no access to the rear of the C-FRT is needed, lower the four adjustable feet until they touch the floor. The cabinet must be stable and not mobile.
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
282017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
C-FRT (IST0527) – Kit seismic (option)C-FRT (IST0527) – Kit seismic (option)
• For installation where an anti-seismic kit is required, reuse the two L shape brackets (1) and install the wall seismic bracket (2) on the top of C-FRT in the correct orientation as described in the following picture (3)
• If parts lost during delivery (1) : FRU � 5786263
1
3
2
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
292017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
UPS 8KVA (IST0526) - HandlingUPS 8KVA (IST0526) - Handling
WARNING! The modules are heavy (80kg).2 persons are needed to lift and carry the equipment with the delivered straps (pre-mounted on the UPS)
• The battery module (1) must be at the right side of the power module (2)
• Install the bracket and the support to secure the two modules
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
bracket support
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
302017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
UPS 8KVA (IST0526) - Configuration UPS 8KVA (IST0526) - Configuration
• Ensure the circuit breaker (A) is OFF
• Make sure the jumper is connected (5) (input source config for our use)
• Check the SNMP board is correctly fixed at the back of the power module
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
312017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
UPS 8KVA (IST0526) - CablingUPS 8KVA (IST0526) - Cabling
Battery Module
• Power battery cable (6)• Battery detection cable (7)
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
Power Module
• Power battery cable (6) • Battery detection cable (7)• Connect Ethernet from C-FRT on SNMP board (8)• EPO UPS (9) from on/off board (J40)
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
322017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
UPS 8KVA (IST0526) - Kit seismicUPS 8KVA (IST0526) - Kit seismic
• Secure the UPS by using the 2 brackets provided in the seismic kit:� 2 straps� 4 brackets to fix on the floor� 1 additional bracket to fix modules on the top
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
332017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
20KVA (IST0538 or IST0540) - Configuration20KVA (IST0538 or IST0540) - Configuration
Key Points:• The 2 straps on Terminal X1 to be installed on site • EPO jumper (JP3) to remove
UL VersionCE Version
2 strapsJP3 jumper
2 straps(4) & (5)
JP3 jumper (3)
WARNING! Requires also parametersconfiguration (item30=1 / item318=10) during Power on (refer to commissioning JC)
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
342017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
Video Splitter Roadmap (IST0535) (option)
• Install the video splitter Roadmap with brackets and screws delivered withunmouted parts in C-FRT, above Video Splitters Live and Review already installed
• Cables connection (ref below picture):� Front panel : CAT Video cables and DVI transmitters (2)� Front panel : Alim DC Cable (3) (already routed from SDB board)� Rear : DVI Input cable (4)
WARNING! Swap Review and Roadmap (bizlink DP cables) on the viper2 outputs
Front Rear Side DL Rear Side
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter, LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
ReviewRoadmapLive
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
352017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter, LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
Optical Video (IST0576) (option)Optical Video (IST0576) (option)
• You can also broadcast the system video to external monitors or other 3rd party devices (video recorders, multiplexers, broadcasting device…) with kit optical (30m).
• Connect the optical DVI transmitter (Tx) to a free DVI output of the splitter and connect the second transmitter (Rx) to the external device.
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
362017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter, LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
Cable routing suspensionCable routing suspension
C-FRT
Interco
suspension
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
372017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
LD option installation (IST0546)LD option installation (IST0546)
List of components for LDM option:
• LMM two models- LMM56800 (27 inputs)- LMM0802 (10 inputs)
• Power strip (provides 230 VAC and 5 VDC)• Kit LDM Mechanical parts • LDM Cables Set • Dual link DVI Transmitters• HD Output Set option (splitter scaler)• Modalities linksets (option)
Key Point: There is no more locking screw on the HDMI cable
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter, LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
382017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
LD option installation (IST0546)LD option installation (IST0546)1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter, LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
Key Point: The upper shelf is available in the LDM Mechanical parts kit coming with the option
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
392017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
LD option installation (IST0546)LD option installation (IST0546)1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter, LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
402017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
CABLESCABLES
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
412017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW
HARDWARE
10. OPTION
11. FINALIZATION
CONTROL ROOM (IST0537)CONTROL ROOM (IST0537)
• New KVM with USB connection for mouse and Keyboard
� WARNING! Power connection of the KVM is on the Live Monitor
GE proprietary and confidential – Limited diffusion - Internal use only
Mechanical Installation Workflow
422017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |
1. SUSPENSION SINGLE OR DAS
2. RAD SHIELD & SURGICAL LIGHT
SUSPENSIONS
3. CABLE ROUTING
4. LC GANTRY
5. INNOVA IQ TABLE AND
INNOVA IQ OR TABLE
6. CABINETS
• PDU
• CFRT
• UPS
• Video Distibution (Splitter,
LMM,Optical video…)
7. CABLES
8. CONTROL ROOM
9. MONITORS and AW HARDWARE
10.OPTION
11.FINALIZATION
MONITORS and AW HARDWARE ; OPTION ; FINALIZATIONMONITORS and AW HARDWARE ; OPTION ; FINALIZATION