Measure 25
Short Term Parking Scheme
13.6.2012
Katerina Oktabcova
Usti nad Labem Municipality
Measure 25
Background and Objectives
• Increasing number of vehicles in the city
• Critical parking conditions, primarily in the citycentre and in densely build-up residential areas
• New parking strategy for the city is required
• Objectives:
Improve conditions for parking in the city with regard to future development
Reduce negative impacts of individual transport and improve living environment in the city
Measure 25
Measure overview
Tasks
• 11.3.3 Parking Strategy Research– Finished in M18
– RTD task
– Analysis of current conditions of parking in the city and future development
• 3.7 Short Term Parking scheme
– Finished in M40
– DEMO task
– Feasibility of a proposal for a parking scheme in the city centre and in residential areas
Measure 25
Task 11.3.3
Parking strategy research
• General background –current stateof traffic and parking conditions inthe city
• Analysis of the existing parking policyin Ústí nad Labem – for the city centreand for residential areas
• Overview of tools suitable for parking management
• Baseline field survey
• Identification of problems
• Proposal for appropriate solutions
• Measure generalised to allow application in other areas in the city
Measure 25
Baseline Survey
• Assessing various criteria of parking supply – number of parked vehicles
– type of parking place (parking lanes, strips, bays, garages or other)
– capacity of parking space (field detected or calculated from the official data of the city road network according to dimensional dispositions)
– photo documentation
– characteristic of parking and typical issues
• Conducted on different week-days and at different times during May – June 2009
• Utilising data from previous surveys in the cityand from official records
• Parking demand caclulated from the numberof buildings and character of the communemultiplied by the motorisation index
• Parking deficit caclulated – difference betweensupply and demand
paid unpaid reserved
parking on
roadways
parallel 271 198 53diagonal 179 57 15
perpendicular 146 77 61car parks 270 42 428
parking garages 893* 0 768*
Total1759 374
13252133
individual yards, gardens 281 garages 225
total 506Total parking places 3964
Measure 25
Identification of problems
• Major problems:
– serious deficit in the number of available parking places
– cars parked everywhere, on places inappropriate for parking
• Frequently occurring issues:
– parked vehicles creating road bottlenecks
– parking in the driving lane of the street
– disregard of road signs
– longitudinal parking disregarding insufficient width of the road
– parking within crossroads causing traffic risks
– commercial vehicles parked in the residential area
– insufficient space disables transit of larger vehicles, such as fire trucks, garbage trucks and ambulance
Measure 25
Typical parking issues – insufficient capacity
stání v křižovatcenerespektování SDZ
nedostatečná šířka jízdních pruhů stání uprostřed jízdního pásu
Measure 25
Proposed solutions
• Regulation of existing legal parking spaces
– Indication of parking lanes and parking bays on urban road
– Indication of areas with forbidden parking by both road marking and signing, especially near crossroads
– Modification of selected streets to one-way roads to allow longitudinal parking on one side or on both sides.
• Implementation of new parking places
• Development of public garages
• Police enforcement of traffic laws and monitoring
• Implementation of paid parking zones
Measure 25
Task 3.7 – New parking scheme
• Transport policy
– Principles of parking management, parking policy and its effectiveness
– Parking fees
– Influencing behaviour of drivers
– Specifics of the city centre
– Specifics of residential areas
• Instruments suitable for parking restrictions
– Reducing transit traffic, encouraging greater take-up of PT, P&R facilities, paid parking
• Best practice from other cities
• Parking scheme solutions
– Long-term and short-term parking
Measure 25
Results in the city centre
• situation in the city centre analysed by the field survey
• occupancy as parking demand for parking places cannot be reliably determined - practically all parking places permanently occupied, many vehicles park illegally, numerous drivers are not able to park
• Parking demand was derived from the methodology based on the Czech standard (ČSN 736110 – Designing local roads) and on general technical requirements for construction in the capital city
• overall parking deficit calculated
• proposed solutions for the new parking scheme: implementation of paid parking zones and establishing P&G premises on the perimeter of the city centre
• after-data calculated through the transport model
Measure 25
Results in residential areas
• Typical residential area Dobětice surveyed
• total number of legal parking places is 1,649, which covers 76% of the parking demand, significant lack of parking spots.
• The total number of parking places available after implementing measures for parking improvements will be 2,362, which covers the demand for parking by 108.9%
• overall improvement of the parking status is 32.9%
• Not sufficient for future development of motorisation prognosed by the Directorate of Roads and Highways of the CR (2%/year)
• parking reserve exhausted within four years
• more complex long-term solution requires significant investments into collective garages and implementation of charged parking on public roads.
sectionnew
parking places
solution
3 10
Shift to one-way roads5 27 109 11 12
New parking places31 1244 1751 4018 17
Longitudinal parking in new parking bays along
the road
19 1232 1240 6242 3443 1659 3060 3072 10
19 180Collective garages
two-storied
60 206Collective garages
three-storied total 713
Measure 25
Conclusion
• The parking scheme issue is quite extensive
• Numerous existing parking methods but only few are suitable for the situation in Usti nad Labem
• Suitable parking strategy must fulffil compromis between the parking scheme, city traffic, public transportation and public opinion.
• It involves technical solution and conveying information to the public - organising intensive advertising information campaign
• Requires cooperation with the Police of the Czech Republic and the Municipal Police (control)
• It is not possible to cover the present and future parking demand entirely, but the parking deficit can be at least minimised.
Measure 25
Support
Parking information leaflets
• overview of the existing parking scheme and parking possibilities
• basic information about payment methods and rates
• lucid map displaying the parking facilities
• for visitors, commuters and residents
Sample places for delivery vehicles
• 6 parking places implemented in the city centre
• designated only for vehicles supplying local shops
• identified by vertical and horizontal markings
• shopkeepers instructed on the regulations
• parking discs distributed among suppliers as a support.
Measure 25
Evaluation
Final results in progress
Gathering after data from the transport model
Indicators:
• Capacity reserve
– traffic survey
– number of spaces according to valid legislation
– occupancy -> demand for parking
• Perception of accessibility
– determined by expert estimation based on demand for parking (subjective opinions of drivers not decisive)
• Modal split
– constant in residential area
– in the centre – determination by transport model / expert estimation
– Proposal of P&G – the model does not enable calculation of pedestrian flaws
Measure 25
Budget and costs
Purchases:
• implementation of sample parking places for supply vehicles in the city centre
• production and distribution of parking brochures
• production and distribution of parking clocks to local businesses
• Budget 17 000€
• Actual costs cca 5 000€
Subcontract:
• Field survey of parking conditions in the city and development of suitable paid parking scheme for the city
• Budget 60 000€
• Actual costs 62 244€