Meadowridge Capital Improvement Project

Danée McGee, P.E. Project Manager: Charlotte Storm Water Services

Scott Sigmon, P.E.WK Dickson

November 10, 2011

Page 2: meadowridge rev Nov 9 2011

Project Team & Meeting Purpose

Charlotte Storm Water Services: Project Management

WK Dickson: Design Consultant

Explanation of Storm Water Program: Why Are We Here?

Obtain Public Input:Your Part in the Process…

Provide Project Overview: What Are We Doing?

Explanation of Next Steps:What is Coming Next…

Page 3: meadowridge rev Nov 9 2011

Charlotte’s Storm Water Program

Water Quality

Maintenance

Capital Improvements

Page 4: meadowridge rev Nov 9 2011

During the project:

Public Input

– Mailers Every Four Months

– Website Updates: http://Stormwater.Charmeck.Org

– Public Meetings

– Questionnaires and Property Owner Surveys

– Email and Phone Contact as Needed

Page 5: meadowridge rev Nov 9 2011

Project Phases1. Planning

2. Design

3. Permitting (401/404)

4. Easement Acquisition

5. Bid & Construction

– Public Involvement Throughout

Page 6: meadowridge rev Nov 9 2011

Summary of Existing Conditions

Page 7: meadowridge rev Nov 9 2011

MEADOWRIDGE DRIVE

MEADOWRIDGE DRIVE

ALL SAINTS LANE

Page 8: meadowridge rev Nov 9 2011

DID NOT MEET STANDARDS

DID NOT MEET STANDARDS

DID NOT MEET STANDARDS

Page 9: meadowridge rev Nov 9 2011

LOCALIZED STREAM EROSION

EROSION AT PIPE AND

HEADWALL LOCALIZED STREAM EROSION

STRUCTURAL FLOODING

SEDIMENT DEPOSITION

Page 10: meadowridge rev Nov 9 2011

Localized Stream Erosion

Page 11: meadowridge rev Nov 9 2011

Erosion at Pipe and Headwall

Page 12: meadowridge rev Nov 9 2011

Sediment Deposition

Page 13: meadowridge rev Nov 9 2011

Localized Stream Erosion

Page 14: meadowridge rev Nov 9 2011

Final Project Phases – How things Work:

Next Steps

– Additional Planning, Modeling and Field Surveys

– Design Phase

– 401/404 Permitting

– Easement Acquisition

– Bid and Construction