MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006...

17
1 MEA Machine and Experiment Assembly Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 200 6 Thoughts about LDC Hall and Assembly (Work is not finished yet. Sorry for confusing pictures) General LDC/TESLA detector assumption Moveable Shielding Questions: Hall Width Underground Hall Size Beam Position Question: Separating Shielding Wall Question: Shielding Block Material Garage Position Question: Electronic Location Question: Shaft Position Question: Orientation Surface to Underground Hall Surface Assembly

Transcript of MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006...

Page 1: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

1

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

Thoughts about LDC Hall and Assembly

(Work is not finished yet. Sorry for confusing pictures)• General• LDC/TESLA detector assumption• Moveable Shielding• Questions: Hall Width• Underground Hall Size

Beam Position Question: Separating Shielding Wall Question: Shielding Block Material

Garage Position Question: Electronic Location Question: Shaft Position

Question: Orientation Surface to Underground Hall

• Surface Assembly

Page 2: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

2

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

General

• 2000t parts are not easy to handle!CMS needs 1day to close one yoke ring! (Goal: ½ day)

• Do not forget: Escape routes Scaffolds, Lifts (scissor or cherry pickers) Cables and other supply lines

(to the detector and at the walls) SupportsI assumed 3m space arround the open detector!

Page 3: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

3

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

LDC/TESLA detector assumptions

• Reasonable fast access to the inner detector• Access to the vertex detector without

breaking the machine vaccum

Picture from“Mechanical Concept of the TESLA Detector” (LC-DET-2001-045)

Page 4: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

4

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

LDC fully open (Beam Pipe Exchange)

Page 5: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

5

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

Q: Hall Width ?

Not rectangular shape!

25m seemed to be okay!

Page 6: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

6

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

Detector inBeam Position

Q: Shielding Wall ?• Shielding Wall

3,5m separatingthe detector hall

Gap at the top

Why is it necessary? Do we have access

to the hall with thebeam on or not?

Do we have two categories of worker:* radition worker * non radiation worker?

(Only 2m for the machine, but could be changes!)

Page 7: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

7

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

Moveable Shielding

• Shielding Portals are impossible with the thicknesses (≥3m) demanded at the moment.

C-shape movable shielding(or C-I-shape) andmove transverse

• At TESLA at thickness of the shielding of 2m was required.

• The gap between the detector and the fixed shielding was closed with a huge portal.

Page 8: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

8

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

Detector in Beam Position

Q: Shielding Wall ?• No Shielding WallBut 5.5m Shielding(Mistake: 3+3.5=6.5)

Shielding Material (?)

Heavy Concrete (3.7t/m³)insteed of Normal (2.35t/m³) saves 20% thickness at HERA (~90º to the beam)6.5m*0.8=5.2m

(Only 2m for the machine, but could be changes!)

Page 9: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

9

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

Detector in Beam Position

Shielding modifed(Similar picture)

• 4m for Machine• C- and I-Shape• Overlaps at the

Gaps E-Trailer smaller

Page 10: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

10

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

Detector in Garage Position(It was a surprise for me!)Q: E-Trailer ?• It is in way!• Alternativies:

Split it Electronic Cavern At the yoke

Q: Allowed cable length?(Detector to Electronic)

Q: Necessary space for electronic?

Q: Cable route for the inner detectors?(Along the support tube?)

Page 11: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

11

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

Detector in Garage Position

Q: Shaft Position ?

NO!

Page 12: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

12

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

Detector in Garage Position Q: Shaft Position ?

Move it around!

Page 13: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

13

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

Detector in Garage Position Q: Shaft Position ?

Best position with E-Trailer! (?)

Page 14: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

14

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

Detector in Garage Position Q: Shaft Position ?

Nearly best position without trailer! (?)

5-10m more length

Page 15: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

15

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

Detector in Garage Position Q: Shaft Position ?

Best shaft position without trailer! (?)

Only trailer problem left

Q: But how the stair case and the elevator in the shaft?

Turn rectangle and all detector rings (?)

Q: Second shaft?Safety

Page 16: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

16

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

Surface AssemblyIt would be possible!

(Attention: HERE Surface Hall 90º to Underground Hall)(In case of a shallow hall I would stick to the TESLA concept)

Page 17: MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

17

MEA

Mac

hin

e an

d E

xper

ime

nt A

sse

mbl

y

Norb

ert

Meyners

, M

EA

E

ngin

eeri

ng F

oru

m a

t C

ER

N12

.Okt.

2006

Summary

• Garage Position incorporated• Underground Hall size:

55m x 25m; Shaft at the end OKAY

• Surface Assembly CMS style OKAY GLD style (I have not fully understood)

Possible

Open Questions:• Where Electronic and Auxiliary Caverns? (Size?)• Radiation Shielding

Separation Wall: No (or Yes?) Tickness?

• Surface Hall Orientation?• ………..