Mechanical and Electrical requirement Pumps Water pumps Due to the reports of unstable hydrostatic pressure in Kuala Krai water supply networks, it is advisable to install a pump to supply water to the elevated water tank. Moreover this pump is only allowed to operate when the hydrostatic pressure drops. Therefore an average multistage pump with the more than 25 feet is sufficient for the school. The Regaline Pumps Sdn Bhd has a suitable choose for the requirement. Below are the details of the pump Correlli Horizontal Pump This is a horizontal stainless steel multistage pumps are widely used in domestic and commercial premises for pressure boosting where the existing water supply is insufficient to meet the demand requirement. Its compacted design ensures easy installation even in constrained spaces. Operating condition Capacity 2-30 M 3 /h Head: 10-55 m

description

civil engineering

Transcript of M&E Requirement

Page 1: M&E Requirement

Mechanical and Electrical requirement

Pumps

Water pumps

Due to the reports of unstable hydrostatic pressure in Kuala Krai water supply networks, it is advisable to install a pump to supply water to the elevated water tank. Moreover this pump is only allowed to operate when the hydrostatic pressure drops. Therefore an average multistage pump with the more than 25 feet is sufficient for the school. The Regaline Pumps Sdn Bhd has a suitable choose for the requirement.

Below are the details of the pump

Correlli Horizontal Pump

This is a horizontal stainless steel multistage pumps are widely used in domestic and commercial premises for pressure boosting where the existing water supply is insufficient to meet the demand requirement. Its compacted design ensures easy installation even in constrained spaces.

Operating condition

Capacity 2-30 M3/h

Head: 10-55 m

Page 2: M&E Requirement

Fire Safety

Fire safety is the set of practices envisioned to decrease the destruction caused by fire. These measures include the methods of preventing ignition of uncontrolled fire and to limit development of fire after it starts. Fire safety is an important factor in any type of project, and especially in civil engineering project fire safety is given exceptional consideration starting from planning stage up to construction stage in order to reduce fatality. There are also law and regulation that must be followed to that a good fire safety rating is obtained.

For school a fire alarm is very important and should be fixed in a strategic place so that the alarm sound can alert people during fire outbreak. Along with smoke detector and heat sensor is a must to prevent the fire from development. Heat sensor and smoke detector should be fixed in very classroom, staffroom, storage rooms. Symbol and such fire assembly fire points and exits must be place in the school so that student and staffs can be directed to a safe assembly point.

Fire pump

According to Malaysia Fire safety act , the water supply for fire emergencies shall be obtained from atleast two centrifugal pumps of which one is electric motor-driven and one driven by a fully independent power source e.g. a diesel engine. In case if there is power outage during the fire, the independent power source engine can be used. The most suitable choose for fire pumps is offer by bomba ideal S.A company. They offer Foc Une Standard pump under their fire fighting package which is designed according to NFPA-20 standards of Malaysia.

Below are the description of this pump:-

Page 3: M&E Requirement
Page 4: M&E Requirement

01 Control panel for the diesel driven main pump

02 Valve

03 Rubber expansion joints

04 Discharge manifold

05 Pressure swith & manometer

06 Vessel

07 Flowmeter

08 Testline

09 Testing valve

10 Electrically driven main pump & jockey control panel

11 Check valve

12 Relief valve

13 Pressure swith

14 Main electric driven pump

Page 5: M&E Requirement

15 Jockey pump

16 Main diesel driven pump

17 Double set batteries

18 Fuel tank

19 Emergency push button

Reference

http://www.bombas-ideal.com/Eng/Fire-Fighting-Packages/Bombas-Ideal-Foc-Cepreveb-RT2-ABA-Requirements-Set.html

https://www.scribd.com/doc/106198285/Building-Plan-Submission-What-Bomba-Wants

https://www.scribd.com/doc/135136903/General-Requirements-for-DBKL-bomba-English