    Problem 1:

    The following information of an operators output for six days.

    Days Monday Tuesday Wednesday Thursday Friday Saturday

    Output 500 550 480 400 350 450

    Output below standard = time wage

    Output at standard = time wage + 20% bonus

    Output above standard = higher piece rate on entire production

    The hourly rate of an operator = $10

    Higher piece rate = $2.5/pc

    Standard output per day = 400 pcs and assume each day has 8 working hours.

    Compute the operators Wednesday, Thursday and Fridays salary.

    Solution:

    Day Actual output Payment system Salary of the day

    Wednesday 480 higher piece rate on

    entire production

    480 pcs x $2.5/pc = $1200

    Thursday 400 time wage + 20% bonus 8 hours x $10/hour + (8 hours x

    $10/hour) x 20% = $96

    Friday 350 time wage 8 hours x $10/hour = $ 80