MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead...

30
MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy 1

Transcript of MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead...

Page 1: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

MCCS Status UpdateSOFIA SITR

2-19-10

Kendall MauldinSOFIA Platform Project Flight Systems Lead

SO

FIA

Str

ato

spheri

c O

bse

rvato

ry f

or

Infr

are

d

Ast

ronom

y

1

Page 2: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

Open Door MCCS Overview

• The MCCS Consists of 10 Subsystems– Platform Interface Subsystem (PIS)

– Power Distribution Subsystem (PDS)

– Mission Audio Distribution Subsystem (MADS)

– Workstation Subsystem (WS)

– Network Subsystem (NWS)

– Time Distribution Subsystem (TDS) (IRIG/NTP)– Video Distribution Subsystem (VDS)

– Archive Subsystem(ARS)

– Data Acquisition Subsystem (DAS)

– Water Vapor Monitor(WVM)

2

Page 3: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

MCCS Current Status

• Verified and operational in open door configuration– Currently supporting envelope expansion flight series

• Modifications and installations in preparation for FORCAST line-ops are on-going (non-interference to envelope expansion)– Currently in a three week downtime where no envelope

expansion flights are occurring, allowing us to complete many installations and mods in preparation for FORCAST Line-ops

• Engineering build to support FORCAST is being checked out in integration labs

Page 4: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

MCCS Overview-Open Door ConfigurationMission DirWorkstation

PlatformNW Switch Platform

Interface

TimeDistribution

PowerDistribution

MissionAudio

SurrogateDAS

Cavity DoorDrive

Cavity ECS

TelescopeAssembly

CockpitIndicator

Power toObservatory

AudioCommunicationfor observatory

IRIG Out

External SystemsMCCS

MCCS NetworkRS-422 DataSubsystem Info

Flight TestInstrumentation

4

Page 5: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

MCCS-Open Door Integration Status

MCCS Subsystem Integration Status

V&V Status Retest Status

Power Distribution PM13-2004

Network PM13-2007

IRIG NTP SV02-2037

Mission Audio SV01-2011

Platform Interface SV01-2012

Workstation SV01-2013

XML SV01-2014

Surrogate Data Acquisition SV01-2014

System Level SV01-2014

Not Started

Being Worked

Complete

Unknown if required

5

Page 6: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

FORCAST Line Ops/ Short Science MCCS Configuration

Page 7: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

Preparations for FORCAST Line-ops

• During current three week downtime:– Installation of several additional fiber optic lines, wiring, brackets, LCD

monitor, network infrastructure, network printer, MADS at PI Rack, PI Panel Ground Lugs

– Informal check-out of PI Patch Panel MCCS Interfaces• Includes safe-to-mate checks prior to connecting FORCAST instrument

– Re-installation of MCCS UPS B– Installations of EB configured SDAS, PIS, network switches,

Workstation, and TAIPS will be installed during the Observatory checkout period before Line-ops

– Risk Mitigation check-outs of EB configured MCCS will be performed during observatory checkout period

Page 8: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

Power Distribution Subsystem

8

Page 9: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

PDS Status• Currently operational in Open Door configuration

– MCCS UPS B currently not installed for open door. Will be re-installed and checked out before FORCAST Line-ops

– Most distribution for future configurations is already installed, but formal V&V would be completed prior to use of the future configuration power distribution

• Power Quality Notes for SI teams:– Both the UPS and FC power (115VAC, 60Hz) have been tested and verified to the following power

quality specs (the 230VAC, 50Hz UPS will be tested to these standards as well):• Voltage stability (zero to full load) +/- 3% of nominal (115 or 230 VAC)• Frequency stability (zero to full load) +/- 1% of nominal (60 or 50 Hz)• %THD: 5% max

– The 28VDC power from the aircraft TRUs has been tested to the following power quality specs:• Voltage regulation between 24 - 32 VDC at all load levels• DC ripple amplitude no greater than 3Vpp at all load levels• DC ripple frequency no greater than 5000 Hz at all load levels

Page 10: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

MCCS Network Subsystem

10

Page 11: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

Network Subsystem

PNS Open door configuration

•Currently operational in Open Door configuration•Scalable for future configurations•FORCAST Line-ops configured units being checked-out in the integration labs

Page 12: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

Network Subsystem

12

Page 13: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

IRIG/NTP

13

Page 14: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

IRIG/NTP Overview

MCCS Forward Rack 5 IRIG NTP

14

•Operational in open door configuration•Scalable to support future configurations•Supplies IRIG-B and NTP time base signals

Page 15: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

Mission Audio Distribution System

15

Page 16: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

MADS Status

16

•Currently in “Open Door +” configuration, which includes expanded capability to support future configurations.•Used for ground and flight ops•FORCAST line-ops config will include MADS at the PI rack

Page 17: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

MADS FORCAST/Short Science Config

Page 18: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

MCCS Platform Interface Subsystem (PIS)

18

Page 19: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

PIS On-Aircraft Configuration

19

•Operational in Open Door Configuration•EB unit loaded in integration labs for check-out prior to FORCAST Line-ops•EB unit will be used for FORCAST Line-ops (will include connection to TA)

Page 20: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

MCCS Workstations

20

Page 21: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

Workstation Status

21

•Currently one workstation installed in upper deck area for door controller. Operational for open door configuration•Two additional workstations will be added for FORCAST Line-ops: TA Operators workstation, Mission Directors Workstation

Page 22: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

GUI Design

22

Page 23: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

MCCS S-DAS

23

Page 24: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

S-DAS Overview

24

•Provides connection between CDDS status data and flight test telemetry system•Currently configured for Open Door configuration

Page 25: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

Video Distribution System (TAIPS)

Page 26: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

VDS (TAIPS) Status

• TAIPS not part of open door configuration (not currently present on aircraft)

• EB version of TAIPS is being checked out in integration labs, in prep for FORCAST Line-ops

• EB version of TAIPS will be installed for FORCAST Line-ops

• Connections to PI patch panel and imagers will be informally checked out prior to line-ops

Page 27: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

PI Patch Panel• Defined per

MCCS_SI_05 ICD

• Installed and ready for FORCAST Line-ops check-outs

Page 28: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

Software

Kyle YorkSoftware Manager SOFIA Platform Project

DFRC Flight Systems Engineering - Tybrin

28

Page 29: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

MCCS -Platform Interface System

• Engineering Build 4 delivered • Blind pointing

• SI boresight setup

• Early Science Nodding

• Engineering Build 5 scheduled to be delivered Feb 24• Full rewind

• 2-point Chopping

• TA imager single and multicast processing (TAIPS)

• TAIPS data archiving

• Corrections to stability issues

• Short Science 1 capabilities• Improved Nodding and Chopping

• Constant Velocity Scan Mapping29

Page 30: MCCS Status Update SOFIA SITR 2-19-10 Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.

MCCS- Workstation

• Workstation• Engineering Build 4 S/W Delivered

• HIL is in configuration to support checkout of connectivity between MCCS subsystems

• Not Formally V&Ved in the H/W or S/W configuration

• Code coverage complete

• Engineering Build 5 delivery on Feb 24• Workstation software delivery 30 days after.• HIL configuration and connectivity check to

follow