MCCN-16-01 Addendum 1...Addendum No: 1 1. In the Specifications 1. General: 1. Sections 00 11 16...

2
7071 Bayers Road, Suite 2002, Halifax, NS B3L 2C2 T: +1.902.453.5555 ! www.exp.com The following information supplements and/or supersedes the bid documents. This Addendum forms part of the Con- tract Documents and is to be read, interpreted and coordinated with all other parts. The cost of all contained herein is to be included in the contract sum. The following revisions supersede the in- formation contained in the original draw- ings and specifications issued for the above named project to the extent refer- enced and shall become part thereof. Acknowledge receipt of this Addendum by inserting its number on the Bid Form. Failure to do so may subject bidder to disqualification. Addendum MTA Project No: MCCN-16-01 Project: McCain Bookstore renovations Date: November 01, 2016 Addendum No: 1 1. In the Specifications 1. General: 1. Sections 00 11 16 Invitation to Tender and 00 21 13 Instructions to Bidder: change closing date to Thursday November 10 @ 4:00 PM Local Time. 2. On the Drawings 1. Drawing 100: 1. Detail 4: extent of flooring removals and installation is entire floor area bounded by bold outline on floor plan. Flooring may have to be installed in phases in order to maintain op- eration of the bookstore during installation. Flooring removals, prep work and installation of new flooring will have to occur after hours or on weekends to minimize impact on Bookstore. 2. Drawing 101: 1. Note existing ceiling height in area between Grid Lines E2 and EX is 94”. 2. All equipment, shelving, books, supplies, etc., will be moved by the University. 3. Work can be performed during regular business hours in the area of the renovation be- tween Grid Lines 1X and 1W. 4. Flooring shall be Mirra Wood by American Biltrite Flooring. 5. Provide 4 boxes (150±SF) of maintenance materials. 3. Drawing M-1: 1. Note that thermostat installed on the South side of column on grid line E7 by 1X will be removed by controls contractor. Patching of gypsum board is included in work of this pro- ject. 4. Drawing E-1: 1. Note that all new data and power devices shall be flush mounted with no exposed conduit or boxes. 2. Refer to attached drawing SK-E1 for location of Comm Room and routing of data wiri

Transcript of MCCN-16-01 Addendum 1...Addendum No: 1 1. In the Specifications 1. General: 1. Sections 00 11 16...

Page 1: MCCN-16-01 Addendum 1...Addendum No: 1 1. In the Specifications 1. General: 1. Sections 00 11 16 Invitation to Tender and 00 21 13 Instructions to Bidder: change closing ... Grille

7071 Bayers Road, Suite 2002, Halifax, NS B3L 2C2 T: +1.902.453.5555 ! www.exp.com

The following information supplements and/or supersedes the bid documents. This Addendum forms part of the Con-tract Documents and is to be read, interpreted and coordinated with all other parts. The cost of all contained herein is to be included in the contract sum. The following revisions supersede the in-formation contained in the original draw-ings and specifications issued for the above named project to the extent refer-enced and shall become part thereof. Acknowledge receipt of this Addendum by inserting its number on the Bid Form. Failure to do so may subject bidder to disqualification.

!

Addendum! MTA Project No: MCCN-16-01 Project: McCain Bookstore renovations Date: November 01, 2016

Addendum No: 1 1. In the Specifications

1. General:

1. Sections 00 11 16 Invitation to Tender and 00 21 13 Instructions to Bidder: change closing date to Thursday November 10 @ 4:00 PM Local Time.

2. On the Drawings 1. Drawing 100:

1. Detail 4: extent of flooring removals and installation is entire floor area bounded by bold outline on floor plan. Flooring may have to be installed in phases in order to maintain op-

eration of the bookstore during installation. Flooring removals, prep work and installation of new flooring will have to occur after hours or on weekends to minimize impact on Bookstore.

2. Drawing 101: 1. Note existing ceiling height in area between Grid Lines E2 and EX is 94”. 2. All equipment, shelving, books, supplies, etc., will be moved by the University.

3. Work can be performed during regular business hours in the area of the renovation be-tween Grid Lines 1X and 1W.

4. Flooring shall be Mirra Wood by American Biltrite Flooring.

5. Provide 4 boxes (150±SF) of maintenance materials. 3. Drawing M-1:

1. Note that thermostat installed on the South side of column on grid line E7 by 1X will be

removed by controls contractor. Patching of gypsum board is included in work of this pro-ject.

4. Drawing E-1:

1. Note that all new data and power devices shall be flush mounted with no exposed conduit or boxes.

2. Refer to attached drawing SK-E1 for location of Comm Room and routing of data wiri

Page 2: MCCN-16-01 Addendum 1...Addendum No: 1 1. In the Specifications 1. General: 1. Sections 00 11 16 Invitation to Tender and 00 21 13 Instructions to Bidder: change closing ... Grille

updn

ramp

up

Corridor

up

Shipping/Receiving

Dock & Canopy

2'-6"

DN

SinkWire Racks

Ice Ice Ice

PizzaImpinger

Pizza

Oven

Hand

Sink

Cash

Menu Sign

On Doors

Ramp

Dn.

Ramp

Dn.Landing

Landing Waste & Recycling

Recycling

Oven Fridge Fridge

Exhaust

Hood

Condiments

RO

Dn.

Grille Grille

Bar

Height

Cooler

DJ Booth

Folding

Grille

7"

Display

Showcase

DSS D1

ColourCopier

Clothing

Books

Clothing

Clothing

Supplies

CashCash

Wall Display Shelves

Work Area

ReproDesk

49'-0 1/2"

7"

7'-8 1/2"

9'-0 1/2"

DN

83'-3"

70'-9"

13'-10 1/2"

8"

3"1'-9"

Ground Floor Lobby

G01

Custodial

G19

Vestibule

G80 Vestibule

G81

Bookstore

G82

Bookstore Storage

G87

Vending

G10

W/C

G09

W/C

G08

Comm.

G02

Vestibule

G20

Dishwashing

G57

Storage

G55

W/C

G53

W/C

G52

Pub

G66

Bar

G67

G71

Keg Stor.

G69

W/C

G68

W/C

G74

Office

G72

4'-5 1/2"

G59

G58

G50

G56

G54

G51

3'-10"

G63

G62

G07

G65

Coats

G60

STG02

Hand

Sink D/W Ice

A

A B

A

A B

A

B

A

B

B

C

SS Work

Table

ABStorage

G59.1

G54.1

Cash

#2

Mail Machine

Server

Safe

Cutter

ClothingBooks

4 High

Mail boxes

G03

7 (10'-0")

Convection

Hood

C

P2

2'-1"

2'-6"

1'-3"

13'-8 1/2"

2'-10"

10 1/2"

4 (5'-0")

AtriumAbove up

AtriumAbove up

16'-6 1/2"

6'-0"8'-5"12'-2" 5'-6" 6'-0" 6'-0" 5'-6"

29'-2 1/2" 7'-0"

P2

P2

P1 P1

P2

P8

P8

P3

P10

P6

P6

P6

P6

P6

P6

P6

P6

P15

P15

P15

P15

P15

P15

P15

P15

P15

P15P15

P15 P15

P15

P15

P15

P1

P1

P1P6

P6P1

P1

P1

P1P1

P12

P2

P13

P17

P17

P17

P17

P17P11

P11

P1

P2

P9

P9 P9P9

P9

P9

P9

P9

P14P14

P9

P10

P10P10

P10

P15

P15

P15

P15

P15

P1

P1

P8 P8

P8

Custodial

G75

5'-10"

P6

P8

P8

P9

83'-7 5/8"

3'-0"3'-11 1/4"

G64

1'-3"

5 1/2"

1'-3"

1'-3"

10'-0"10'-4 1/2"

W32

W29

W30 W31

W33 W33

LSD LSD

8'-7 1/2"

8'-10"

5'-0" 5'-0" 8'-10"

1'-2" 4'-4" 4'-0" 13'-0" 4'-0" 4'-4" 1'-2"

P1P1BEER TOWER

P1ICE MACHINEP1

P1Cooler

1'-9 5/8"

GWCASH MACHINE

P1

G71.1

P1

P1

82'-11 1/4"

6'-1 3/4"

R 9'-10"

BENCH BENCH BENCH

3'-7 1/2"

8'-10 1/2"

CAST CONCRETE STAIR

CAST CONCRETE STAIR

CAST CONCRETE STAIR

TOPPING 1 1/2" ± ON

STAIRS AND LANDINGS

3

A5.8

1

A5.8

2

A1.2a

2

A1.2a

1

SKA-94

11'-10 3/8"

EXTENT OF SILL

& APRON

PLAM ON PLYWOOD SILL

TYPICAL AT WINDOWS

UNLESS NOTED OTHERWISE

EXTENT OF SILL & APRON

12'-1" 6'-6"

PLAM ON 3/4" WOOD

PRODUCT, SILL TYPICAL AT

STAIR CENTER RAIL

24'-0" BULLETIN BOARD

4'-0" BULLETIN BOARD

5'-9 3/8"

6'-2"

8'-8 3/8"

EXTENT OF SILL & APRON

EXTENT OF SILL & APRON

Exhaust

Hood

11"

HDTV Display

3'-11"

5'-0"

4'-9"

3'-5 1/4"

Voice

TV/Cable

AC

CABINET

CABINET

P19

14'-4 5/8" 5'-4" 7'-6 1/8" 9'-2 7/8"

Cafe

G61

30" GWB WALL

Elevated structural

concrete topping on

steel decking infill

over existing stair to

basement

27'-1"

C

3'-6 3/4"

3'-6 5/8"

13'-1 3/4"

4'-7 3/4"P19

P2

P8

7'-1"

7'-5"CONDENSER

10 (13'-0")P1

P1

6'-0" 15'-4"

1 (3'-0")

Add a 1'-4" wall to support

mailboxes on bottom side.

Finish new stub wall to wing

walls as shown in detail

SKA-143. Also See SKA-123-R

10.1 (5'-0")

11'-6"1'-6"

1'-1"

UPA2'-5" 3'-6"

DN

123456

1w1x1y1z

4x5x5y6x

14'-0" 28'-0" 28'-0" 28'-0"

2'-5" 14'-11 1/4" 14'-11 1/4" 14'-11 1/4"

16'-10 5/8"20'-0" 16'-10 5/8"

8'-8" 2'-10 5/8"

50'-8"

25'-4 3/4" 25'-3 1/4"

L

H

E

E2

K

Ex

Ey

C

G1

4y

D

T4

E1

B

Cz

C

4y

E7

J

53'-10 3/4"

8'-2" 10'-1 1/2" 5'-7 1/2" 5'-7 1/2" 10'-1 1/2" 8'-2"

53'-10 3/4"

7'-0"7'-0"1'-4 1/2"

88'-9 3/4"

16'-10 5/8"

T5

T5

T3

Ec

1

A4.1

2

A4.3

2

A4.1

T3ECEB ED EEEA EF

Mount AllisonU N I V E R S I T Y

June 2009

06-37

STAFF

Contractor must check and verify all dimensions on the job, and report

any discrepancies to the Architect before proceeding with the work.

DO NOT SCALE THIS DRAWING.

This drawing will remain the property of Sperry &Partners Limited

whether the project for which it is intended is executed or not. It is

not to be used by any party on any other project or extensions to

this project except by the agreement of, and compensation to,

Sperry & Partners Limited. This drawing and accompanying

specifications shall not be reproduced in any manner without the

express written consent of Sperry & Partners Limited.

Copyright © 2007

MOUNT ALLISON

STUDENT CENTRE

Construction North Stamp

Project Name

Drawing Title

Description No. Date

Designed

Drawn

Checked

Date

Project No.

Drawing No.

Scale

PR

OJE

CT

NO

.

PLO

T D

ATE

:

06- 3

7

102 Portland Street, Dartmouth; Nova Scotia, Canada; B2Y 1H8

Phone: 902 469 9000; Fax: 902 469 4399

Owner

MOUNT ALLISON

UNIVERSITY

SACKVILLE, N.B.

22006

James C. Reardon

SPERRY & PARTNERS

LIMITED

Jun

18, 2

009

JCR

CONSTRUCTION

NORTH

TRUEMAN HOUSE

McCONNELL

HALL

TWEEDIE

HALLEXISTING

FITNESS CENTRE

(NIC)

TP 7.6 Prodema Panels 1 JAN 23, 2008

TP 8.6 Aluminum Curtain Wall & Ent. 1 JAN 23, 2008

TP 5.5 Steel Stairs, HR & Guards MAR 13, 20081

TP 5.4 Glass Railings & Handrails MAR 13, 20081

TP 9.2 Studs, GB, SAT Ceilings NOV 29, 20071

Issued For Construction MAR 20, 20082

TP 6.3 Millwork MAR 25, 20081

TP 10.1 Specialties 1 APR 9, 2008

RECORD DRAWINGSTHIS DRAWING HAS BEEN PREPARED,

IN PART, BASED UPON INFORMATION

FURNISHED BY OTHERS. WHILE THIS

INFORMATION IS BELIEVED TO BE

RELIABLE, SPERRY AND PARTNERS

CANNOT ASSURE ITS ACCURACY, AND

THUS IS NOT RESPONSIBLE FOR THE

ACCURACY OF THIS RECORD DRAWING

OR FOR ANY OMISSIONS WHICH MAY

HAVE BEEN INCORPORATED INTO IT

AS A RESULT. THOSE RELYING ON

THIS RECORD DOCUMENT ARE

ADVISED TO OBTAIN INDEPENDENT

VERIFICATION OF ITS ACCURACY

BEFORE APPLYING IT FOR ANY

PURPOSE.

1/8"=1'-0"

PARTIAL GROUND FLOOR PLAN

BOOKSTORE / PUB / CAFE

A2.1

New raised floor structure with concrete topping

TAS/LMB

Reinforced structural concrete slab

Px Wall Tags-See A6.0 for more information

Limit of Plam sills & aprons; Plam mounted to 3/4"

plywood unless noted otherwise.

X'-X" BULLETIN BOARDBulletin board length and location

X'-X" SIGNAGESignage length and location - Will require

sheet metal backing

routing of network cabling from Comm Room

Exisitng Comm Room

Drawing Issued for Reference onlyto show location of exisitng Comm Room and building dimensions

MCCN-16-01 McCain Bookstore RenovationsAddendum#1

SCALE: 1/16" = 1'-0"

Jim Reardon
DRAWING SK-E12016.11.01
Jim Reardon
Jim Reardon
Jim Reardon
Jim Reardon
Jim Reardon
DRAWING SK-E12016.11.01