MCC Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP-010134.

4
MCC Task 160 May Status Report Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP-010134

Transcript of MCC Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP-010134.

Page 1: MCC Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP-010134.

MCC

Task 160 May Status ReportTask 160 May Status Report

Shicheng HU, MCC07 May, 2001

TP-010134

Page 2: MCC Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP-010134.

Task 160 (TTCN) - FundingTask 160 (TTCN) - Funding• Completion of all contracts for the received 3GPP 2001 funding

(26 mm) for the 1 half of this year.

• PCG acknowledged the needs from TSG-T for the funding shift from FY 2002 to FY 2001 and approved the request.

• A call for the TTCN voluntary contributions has been circulated within the SDOs (ref. ETSI CL 2083).

– Answer deadline set to end of May,

– 6 mm of the voluntary funding from Motorola received,

– The remaining need for the 2nd half of 2001 will be funded by the shifted funding.

• For the further spending request for TTCN project during FY2002 and 2003, requested budget (58mm with 50% extra allowance) will be discussed in October.

Page 3: MCC Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP-010134.

Progress & MeasuresProgress & Measures• Progress in TTCN draft

– 400 TTCN test cases available in 34.123-3 v.102,

– 60 new GMM test cases drafted,

– TTCN for SS control largely updated in accordance with ASP update v.102 (RAB reconfiguration, security & DL channel power control) .

• During Feb. – May, 3 TTCN experts were available.

• Considering high CR volume in the core spec, two experts allocated for the TTCN maintenance.

• Warning: the goal for 460 TTCN test cases in June will NOT reached. (estimated 410).

• In order to maintain the Sept. goal to approve 34.123-3, additional 3-4 experts will be started soon. Their result is expected in August.

– L2 (MAC, PDCP & BMC) tests,

– Multi-cell TTCN tests (RRC measurement and idle mode),

– SMS over PS.

Page 4: MCC Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP-010134.

TTCN plan 2002-2003TTCN plan 2002-2003

2002 2003 Maintenance of existing test cases 9 9 TDD mode 34 -

R99

Intersystem / Inter RAT HO 6 - Low Chip Rate TDD 9 15 Inter RAT HO - 3 Enhanced Radio Bearer - 3

Rel-4

Facsimile and emergency call enhancements - 2 L2 ARQ II/III - 3 UMTS 1800 (release independent) - 3 Voice over IP - 15

Rel-5

HSDPA - 5 58 58