Implementation of the Symbols Project at MCB Limited Presented By: M.Gohar Iqbal

description

software of symbols implementation methodology

Transcript of Mcb

Page 1: Mcb

Implementation of the Symbols Project at MCB

Limited

Presented By: M.Gohar Iqbal

Page 2: Mcb

AgendaO MIBS (In house developed solution)O AMBIT(SunGard’s Core Banking

solution)O Project ManagementO Implementation stepsO Success before and afterO A right decision

Page 3: Mcb

MIBSO In house developed software for

banking needs.O Four modules: MIBS Multi-currency

Inter-banking systemO GLBS General Ledger Banking

System,O RSBS Remittances Banking System &O LUBCS Utility Billing System.

Page 4: Mcb

Architecture Of MIBS

Key punch operator

Key punch operator

Branch Manager

Chief Teller

Teller

Teller

Chief Teller

Branch Manager

Dial Up Connection

Branch Based Servers

Branch Based Servers

Branch A

Branch B

Page 5: Mcb

Architecture Of MIBSBranch Offices

Regional Offices

Circle Offices

Consolidate Report

Page 6: Mcb

Drawbacks of MIBSO Use of paper based vouchers and manual

sheets.O No Integration b/w branches of data.O Aggregation and reconciliation took enormous

time. O 8-10 steps before closing of branch.O Slow transactions took days to complete b/w

branches.O No single view of customer & separate

processes for separate transactions.O Risk and Redundancy of data due to vouchers.

Page 7: Mcb

AMBITO SunGard's product as core banking

solution.O Integrated extended EBS.O Six modules

O Branch TellerO KernelO General LedgerO DepositsO Customer Lending

Page 8: Mcb

AMBITO 4 add on modules

O Funds TransferO Domestic PaymentsO Knowledge ManagerO Foreign Exchange

O Web enabled especially for customers.

O ATM, Mobile devices enabled services.

Page 9: Mcb

Symbols Project Implementation

O Implementation of AMBIT is Symbols Project.

O A separate Department.O Project Initiated in 2003.O Selection of systems.O Documentation/ mapping of existing

processes (AS-IS, requirement gathering).

O Key Gaps and customizable scope outline(TO-BE, GAP analysis).

Page 10: Mcb

O TestingO 22 MCB employees training in

Singapore.O Services of MCB testing on AMBIT to

evaluate FIT.O Resulted in some GAPS of

O Profit, Loss and ZAKAT processes consolidation.

O Remittance’s structure and terminology.

O Requested accommodation for these GAPS.

Symbols Project Implementation

Page 11: Mcb

O In 2005 first branch of MCB was customized.

O 104 branches moved to AMBIT.O But Change management got delay.

Symbols Project Implementation

Page 12: Mcb

Implementation teamsO Teams made and were set up at

Karachi, Lahore & Islamabad.O With the help of G.Ms, the team had

to design implementation plans.O Also in developing, training

methodology & conducting training session.

O Job support and training providing.

Page 13: Mcb

Migration MethodologyO Standard processes needed.O Data cleansing(involve CNIC

identification).O Signature Verification.O Conversion of MIBS,GLBS & RSBS.O Role based Security and View rights

authorization.

Page 14: Mcb

Success

O Change Management was only hurdle.

Page 15: Mcb

A Right Decision