MBP1133 | Project Management Framework Prepared by Dr Khairul Anuar
L4 – Project Time Management
www.notes638.wordpress.com
Content
1. Scheduling
2. Common Scheduling Techniques
3. PERT
4. Network Fundamentals
5. Standard PERT Nomenclature
6. Conversion of PERT Chart
7. 7. Constructing the PERT
8. PERT and WBS
9. Dependencies
10. Advantages of Network Scheduling Techniques
2
1. Scheduling
• Scheduling is a plan to implement a project using an
ordered sequence of activities with time allotted for
each activity.
• A project schedule is the delivery of a project scope.
• In order to complete the schedule, a project manager
should have access to:
• WBS, the project plans, the project charter, the
project scope, a list of all available resources, the
process assets of the organization, and the
requirements for the project
1. Scheduling
• Several project management software packages are
available to help the project manager calculate and
schedule project activities automatically.
• The following are popular:
• Microsoft Project
• Primavera
• Zoho
• FastTrack
• SAP PS
1. Scheduling
• Scheduling is a very important facet of project management as it
helps a project manager to complete the project within scope,
time, and budget as well as use the available resources
effectively in order to perform and provide value to the
organization.
• Scheduling helps a project manager break down a complex
project into simple activities.
• Project manager has to input these simple activities in the right
order along with the likely amount of time and resources needed
to complete each activity.
1. Scheduling
• The order in which these activities have to be completed, i.e., the
predecessors and successors of each activity, has to be
determined.
• Some of these activities may be completed in parallel and others
in series. For example, two activities such as coding and testing
can be accomplished only in series, i.e., testing can be started
only after coding.
• Scheduling helps a project manager overlap several activities by
different members of the project team to complete the overall
project in the shortest period of time possible.
1. Scheduling
• A project manager can use the schedule to manage
the project effectively.
• The goal of an effective project schedule is to answer
the following questions:
• What activities will be accomplished?
• What is the sequence of those activities?
• When will those activities be accomplished?
• Who will accomplish those activities?
2. Common Scheduling Techniques
• The most common scheduling techniques are:
Gantt or bar charts
Milestone charts
Line of balance
Networks
Program Evaluation and Review Technique (PERT)
Arrow Diagram Method (ADM) [Sometimes called the Critical Path
Method (CPM)]
Precedence Diagram Method (PDM)
Graphical Evaluation and Review Technique (GERT)
9
2.1 Gantt Chart
10
2.2 Milestone Chart
11
2.3 Critical Path Method
12
2.4 Precedence Diagram Method
13
3. PERT
• In the early 1960s, the basic requirements of PERT/time as established by
the Navy were as follows:
All of the individual tasks to complete a program must be clear enough to be
put down in a network, which comprises events and activities; i.e., follow the
work breakdown structure.
Events and activities must be sequenced on the network under a highly
logical set of ground rules that allow the determination of critical and
subcritical paths. Networks may have more than one hundred events, but not
fewer than ten.
Time estimates must be made for each activity on a three-way basis.
Optimistic, most likely, and pessimistic elapsed-time figures are estimated by
the person(s) most familiar with the activity.
Critical path and slack times are computed. The critical path is that sequence
of activities and events whose accomplishment will require the greatest time.
4. Network Fundamentals
• The major discrepancy with Gantt, milestone, or bubble charts is the
inability to show the interdependencies between events and
activities.
• These interdependencies must be identified so that a master plan
can be developed that provides an up-to-date picture of operations
at all times.
• Interdependencies are shown through the construction of networks.
• Network analysis can provide valuable information for planning,
integration of plans, time studies, scheduling, and resource
management. The primary purpose of network planning is to
eliminate the need for crisis management by providing a pictorial
representation of the total program.
15
4. Network Fundamentals
• The following management information can be obtained from such a
representation:
Interdependencies of activities
Project completion time
Impact of late starts
Impact of early starts
Trade-offs between resources and time
“What if” exercises
Cost of a crash program
Slippages in planning/performance
Evaluation of performance
16
4. Network Terminologies
• Networks are composed of events and activities. The following
terms are helpful in understanding networks:
Event: Equivalent to a milestone indicating when an activity
starts or finishes.
Activity: The element of work that must be accomplished.
Duration: The total time required to complete the activity.
Effort: The amount of work that is actually performed within
the duration. For example, the duration of an activity could be
one month but the effort could be just a two-week period
within the duration.
Critical Path: This is the longest path through the network
and determines the duration of the project. It is also the
shortest amount of time necessary to accomplish the project.
17
5. Standard PERT Nomenclature
• Figure 12–1 shows the standard nomenclature for PERT
networks.
circles represent events, and
arrows represent activities.
numbers in the circles signify the specific events or
accomplishments.
• The number over the arrow specifies the time needed (hours,
days, months), to go from event 6 to event 3.
• The events need not be numbered in any specific order.
However, event 6 must take place before event 3 can be
completed (or begun).
18
5. Standard PERT Nomenclature
19
3 weeks
Complete Final Report Complete Testing
Legend:
Event
Activity
6 3
Figure 12-1 - Standard PERT and nomenclature
5. Standard PERT Nomenclature • In Figure 12–2A, event 26 must take place prior to events 7, 18, and 31.
• In Figure 12–2B, the opposite holds true, and events 7, 18, and 31 must
take place prior to event 26. Figure 12–2B is similar to “and gates” used
in logic diagrams.
20
FIGURE 12–2. PERT sources (burst points) and sinks.
26
7
18
31
(A) Burst Point 7
18
31
26
(B) Sink
6. Conversion of PERT Chart
• Gantt and milestone charts can be used to develop the PERT network,
as shown in Figure 12–3.
• The bar chart in Figure 12–3A can be converted to the milestone chart
in Figure 12–3B. By then defining the relationship between the events
on different bars in the milestone chart, we can construct the PERT
chart in Figure 12–3C.
• Refer to page 498 of Kerzner (handout) for the chart
21
7. Constructing the PERT
• PERT is basically a management planning and control tool.
• It can be considered as a road map for a particular program or
project in which all of the major elements (events) have been
completely identified, together with their corresponding
interrelations.
• PERT charts are often constructed from back to front because,
for many projects, the end date is fixed and the contractor has
front-end flexibility.
22
7. Constructing the PERT
• One of the purposes of constructing the PERT chart is to determine
how much time is needed to complete the project.
• PERT, therefore, uses time as a common denominator to analyze those
elements that directly influence the success of the project, namely, time,
cost, and performance.
• The construction of the network requires two inputs:
First, do events represent the start or the completion of an activity?
Event completions are generally preferred.
The next step is to define the sequence of events, as shown in
Table 12–1, which relates each event to its immediate predecessor
23
7. Constructing the PERT
24
Activity Title Immediate
Predecessors
Activity Time, Weeks
1-2 A - 1
2-3 B A 5
2-4 C A 2
3-5 D B 2
3-7 E B 2
4-5 F C 2
4-8 G C 3
5-6 H D, F 2
6-7 I H 3
7-8 J E, J 3
8-9 K G, J 2
Table 12-1 – Sequence of Events
7. Constructing the PERT
• Large projects can easily be converted into PERT
networks once the following questions are answered:
What job immediately precedes this job?
What job immediately follows this job?
What jobs can be run concurrently?
25
7. Constructing the PERT
• Figure 12–4 shows a typical PERT network.
• The bold line in Figure 12–4 represents the critical path, which is
established by the longest time span through the total system of events.
The critical path is composed of events 1–2–3–5–6–7–8–9.
• The critical path is vital for successful control of the project because it
tells management two things:
Because there is no slack time in any of the events on this path,
any slippage will cause a corresponding slippage in the end date of
the program unless this slippage can be recovered during any of
the downstream events (on the critical path).
Because the events on this path are the most critical for the
success of the project, management must take a hard look at these
events in order to improve the total program.
26
7. Constructing the PERT
27
FIGURE 12–4. Simplified PERT network.
8. PERT and WBS
• Using PERT we can now identify the earliest possible dates on which
we can expect an event to occur, or an activity to start or end.
• There is nothing overly mysterious about this type of calculation, but
without a network analysis the information might be hard to obtain.
• PERT charts can be managed from either the events or the activities.
• For levels 1–3 of the Work Breakdown Structure (WBS), the project
manager’s prime concerns are the milestones, and therefore, the
events are of prime importance. For levels 4–6 of the WBS, the project
manager’s concerns are the activities.
28
9. Dependencies
• There are three basic types of interrelationships or dependencies:
Mandatory dependencies (i.e., hard logic): These are dependencies
that cannot change, such as erecting the walls of a house before
putting up the roof.
Discretionary dependencies (i.e., soft logic): These are
dependencies that may be at the discretion of the project manager
or may simply change from project to project. As an example, one
does not need to complete the entire bill of materials prior to
beginning procurement.
External dependencies: These are dependencies that may be
beyond the control of the project manager such as having
contractors sit on your critical path.
29
9. Dependencies
• Sometimes, it is impossible to draw network dependencies without
including dummy activities.
• Dummy activities are artificial activities, represented by a dotted line,
and do not consume resources or require time.
• They are added into the network simply to complete the logic.
30
9. Dependencies
• In Figure 12–5, activity C is preceded by activity B only. Now, let’s
assume that there exists an activity D that is preceded by both activities
A and B.
• Without drawing a dummy activity (i.e., the dashed line), there is no way
to show that activity D is preceded by both activities
• A and B. Using two dummy activities, one from activity A to activity D
and another one from activity B to activity D, could also accomplish this
representation.
• Software programs insert the minimum number of dummy activities, and
the direction of the arrowhead is important.
• In Figure 12–5, the arrowhead must be pointed upward.
31
9. Dependencies
32
FIGURE 12–5. Dummy activity.
10. Advantages of Network Scheduling
Techniques
• Advantages of network scheduling techniques include:
They form the basis for all planning and predicting and help
management decide how to use its resources to achieve time and
cost goals.
They provide visibility and enable management to control “one-of-a-
kind” programs.
They help management evaluate alternatives by answering such
questions as how time delays will influence project completion,
where slack exists between elements, and what elements are crucial
to meet the completion date.
They provide a basis for obtaining facts for decision-making. 33
10. Advantages of Network Scheduling
Techniques
They provide a basis for obtaining facts for decision-making.
They utilize a so-called time network analysis as the basic method to
determine manpower, material, and capital requirements, as well as to
provide a means for checking progress.
They provide the basic structure for reporting information.
They reveal interdependencies of activities.
They facilitate “what if ” exercises.
They identify the longest path or critical paths.
They aid in scheduling risk analysis. 34