May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

18
Post Approval Monitoring : A tool to improve best A tool to improve best practices for animal use in practices for animal use in science science May 14th 2010, CCAC Christian Demers and Geneviève Lauzon

Transcript of May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

Page 1: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

Post Approval Monitoring : A tool to improve best practices A tool to improve best practices

for animal use in sciencefor animal use in science

Post Approval Monitoring : A tool to improve best practices A tool to improve best practices

for animal use in sciencefor animal use in science

May 14th 2010, CCAC

Christian Demers and Geneviève LauzonChristian Demers and Geneviève Lauzon

Page 2: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

Overview

1. CRCHUM;

2. PAM program:A. Which protocols are monitored;

B. Who visits;

C. What happens with the results;

D. Categories of non-compliance.

Page 3: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

Animal Care CommitteeCRCHUM

Page 4: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

Number of protocols per category of invasiveness (April 2010)

0

30 29

108

10

20

40

60

80

100

120

A B C D E

Categories

Nu

mb

er

of

pro

toc

ols

Page 5: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

Number of protocols per researcher (04/2010)

18

11

4

6

4

6

4

0 5 10 15 20

One

Two

Three

Four

Five

Six

More than six

Nu

mb

er

of

pro

toc

ols

Number of researchers

Page 6: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

Animals used at CRCHUM in 2009

3595

22318

97

17

2

0 5000 10000 15000 20000 25000

Rat

Mouse

Rabbit and hamster

Dog

Pig

Sp

ec

ies

Page 7: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

Objectives of PAM

• Monitoring one third of AUPs each year.

• Reducing concerns, problems or complaints received from members of the research center community.

• Establishing a confident relationship between animals users and ACC.

Page 8: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

WHY?

• ACC is responsible for identifying and correcting gaps in relation to compliance with approved protocols and SOPs so that procedures with animals are done efficiently and in the best conditions possible.

Page 9: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

Which protocols are monitored?

• All E protocols are monitored;• All protocols that raise concerns, problems or

complaints are monitored;• For all breeding protocols, checking the number of

animals produced and reported by the animal care staff and / or users against the number approved in the protocol;

• All other protocols are monitored randomly (protocol number drawn and put back in pool) at the ACC monthly meeting; It should be noted that Category C and D protocols are more likely to be the subject of post-approval monitoring.

Page 10: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

USERS

Animal facilities

Animal health

Technicians

Veterinarian

Animal Care Committee

Research Center

Monitoring before and after implementation of post-approval monitoring program

PAM officer

Page 11: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

Who?• All members of the ACC can visit, including researchers using animals or

not, community reps. and coordinators.

• At CRCHUM, the ACC assistant-coordinator is the PAM officer.

• Exceptions: Members of the animal facilities and the veterinarian can’t do PAM visits.

• A minimum of two people are required for a visit. In addition, one of them must be a researcher.

• Exception : Terminal procedures ex.: tissue harvesting (in this case, PAM officer is enough).

Page 12: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

Items to be evaluated during a visit

• Training of users, the safe and proper handling of animals and products used (drugs, radiation, biohazard);

• Procedures as described in AUP, or in a SOP;

• Aseptic surgery;• Proper use of analgesia and

anesthesia;• The number of animals used;• The endpoints and the method of

euthanasia;• Issues raised by team members.

Page 13: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

What happens with the results?

• For each visit, a report is issued to the committee (post-approval monitoring form);

• The user(s) and researcher are acknowledged by email for the visit;

• A copy of the report with the recommendations, if any, is sent to user(s) and the researcher before ACC meeting.

Page 14: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

Categories of non-compliance

Problems most frequently observed

• Minor: – Animal users have no idea of the endpoints

indicated on the protocol;– Users have never read the protocol;– Changes in protocol w/o ACC approved

amendment;– Name of mouse strains.

Page 15: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

• Major: – Incorrect analgesia or anesthesia;– Incorrect aseptic conditions during surgeries.

Categories of non-compliance

Page 16: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

Actions taken • According to the problems noted, an amendment to

the protocol may be required;• If the number of animals produced in breeding is

different from what has been referred to in the protocol, the principal researcher / applicant is contacted and a justification is requested;

• If necessary, there will be a requirement to attend laboratory animal training;

• Any deviations must be corrected; the corrective action for the major problems will be decided by the committee.

Page 17: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

How to obtain success in a PAM program

• The officer knows the users;

• Presence of a researcher;

• PAM officer may help to apply 3R principles;

• Visit must be performed in a positive way;

• In case of non-compliance, the PAM officer must quickly find ways in collaboration with the users for them to comply.

Page 18: May 14 th 2010, CCAC Christian Demers and Geneviève Lauzon.

New CRCHUM• Expected opening: 2013