May 13, 2004 1
FNAL Hybrid Thermal Test StatusFNAL Hybrid Thermal Test Status
Hybrid Thermal Test Procedure
Test Results
Eva MedelEva MedelFNAL CMS Group
June 22, 2004June 22, 2004
May 13, 2004 2
Hybrid Thermal TestHybrid Thermal Test
Test ProcedureTest ProcedureWe follow exactly the 4 Hybrid Thermal Test Procedure;basically:
I. Pre-LoadingTurn the chiller on,activate ACDC, NIM crate and peltier power supply power on.
II. LoadingLoad the hybrids onto the peltier plate. Hybrid registration. Turn on ARC Board power supplies. Initialization in testation_start.vi.
III. Testing (failures)One or more shorted channels, orFive or more noisy or open channels.
May 13, 2004 3
Hybrid Thermal TestHybrid Thermal Test
Test ProcedureTest Procedure
After the test, an automatic report is generated for each hybrid in
teststation_final_report.vi
xml files generated and saved in the same directories, ( e.g. C:\TrakerDB\results).
Uploading of the xml files into the data base when the program arcs_auto.xml.exe is run.
May 13, 2004 4
Hybrid Thermal TestHybrid Thermal Test
ResultsResults
430 TEC hybrids have been tested
69 TEC hybrids failed the thermal test ( 16% ) 361 passed the test ( 84% )
Hybrids that failed 44 showed at –20 PLL failure. 25 for other reasons
May 13, 2004 5
Hybrid Thermal TestHybrid Thermal Test
ResultsResults
210 TOB hybrids have been tested
29 TOB hybrids failed the thermal test ( 14% ) 181 passed the test ( 86% )
Hybrids that failed 24 showed at –20 PLL failure. 5 for other reasons
May 13, 2004 6
Hybrid Thermal TestHybrid Thermal Test
TEC HYBRIDS
Failure at –200C.
22 do not present any apparent damage. The rest show certain damage mainly done during the wire-bonding like:
OUTER BONDS REPAIRS NEW WIRE, NEW TOOL, PROGRAM MODE-SOFTWARE UPGRADES IRREGULAR LOOP HEIGHTS
Or problems due to PA dirty, scratched or bad chips.
May 13, 2004 7
Hybrid Thermal TestHybrid Thermal Test
TEC HYBRIDS For failed hybrids ( except –20 PLL failure) we used Lance’ s
Labview program to know how noisy is an APV, ploting the noise and pedestal vs channel.
This tool allow us to determine short channels. The cut applied on the calibration signal height was 1.7 ADC counts. Short channels due to the wire bonding.
To determine open channels we analyze the pedestal distribution
expecting a smooth spectrum. Open channels are attributed to open bonds and PA damages.
A visual inspection, clean some hybrids and retest were done.
May 13, 2004 8
Hybrid Thermal TestHybrid Thermal Test
TEC HYBRIDSExample of short and noisy channels
May 13, 2004 10
Hybrid Thermal TestHybrid Thermal Test
TEC HYBRIDSResults
Using Lance’ s program we found less short channels than reported.
Noisy channels are consistent with the reported ones.
Visual inspection was done and then some hybrids were retested. The majority failed for the same reason than the first time, ( no visible problem).
83% of the failed are 6 chip hybrids. The number of short channels should not be the same for 4 and 6 chip hybrids.
May 13, 2004 11
Hybrid Thermal TestHybrid Thermal Test
TOB HYBRIDS
29 TOB hybrids that failed the thermal test
25 showed at –20 PLL failure
For the rest of the TOB hybrids (4) an analysis using Lance’ s program was done, and visual inspection trying to fix something.
May 13, 2004 12
Hybrid Thermal TestHybrid Thermal Test
TOB HYBRIDS
Failure at –200C.
10 do not present any apparent damage. The rest show certain damage on the pitch adapter mainly:
SCRATCHES ON PA
BAD SURFACE (bond pads,1)
May 13, 2004 13
Hybrid Thermal TestHybrid Thermal Test
TOB HYBRIDSA hybrid without problems (peddecon_file 1)
May 13, 2004 14
Hybrid Thermal TestHybrid Thermal Test
TOB HYBRIDSA hybrid without problems (peddecon_file 2)
May 13, 2004 15
Hybrid Thermal TestHybrid Thermal Test
TOB HYBRIDSA hybrid without problems (peddecon_file 3)