© 2008 IBM Corporation
Maximo GreenDataCenter
© 2008 IBM Corporation
IBM – Global Leader in Data Center Management & Innovation
Total
Client
Tactical
Strategic
IBM Datacenter portfolio
4396Thousand sq.ft.
488Datacenters
294Datacenters
61Datacenters
73Datacenters2536Thousand sq.ft.
1083Thousand sq.ft.
TOTAL
8329Thousand sq.ft.
3,735,388End Users206,355Mid Range
10,312Terabytes1,067,458MIPs
1,291MainframesTOTALCapabilities
Worldwide: 488 datacenters, 61 strategic, 8.3/2.5m sq.ft.Americas: 194 datacenters, 21 strategic, 4.7/1.3m sq.ft.
Compute capability:
FORTUNE 500Top 20 2004, 2005, 2006
20052005
The Climate Group20051998,
1999, 2001
Green Power Purchaser
Award 2006
USEPAClimate Protection Award1998 and 2006
Awards & Recognition Early Actions & Results
40%Between 1990 and 2005, IBM’s global energy conservation actions reduced or avoided CO2 emissions by an amount equal to 40% of our 1990 emissions.
Plus . . . Deep experience in helping our clients’ data center challenges Significant services deployment capability: over 3,300 resources for server, storage and data centers Global breadth: built >30M square feet of data centers; top 5 Chinese banks; India and Egypt telecomm Leverage experience from managing and deploying over 200,000 servers in over 400 centers
© 2008 IBM Corporation
IBM Datacenter Facility Portfolio – A Perspective
All our ITD datacenters would fit into a space
equivalent to Disneyland 8m sq ft
We use the power approximately equivalent
to the entire state of Connecticut –
6Bn kwH
CT
Disneyland
© 2008 IBM Corporation
Energy costs are 50% of the facilities lifetime operational costs Operating costs are 3x the capital costs and energy is up to 50% of the total costs
0
10,000,000
20,000,000
30,000,000
40,000,000
50,000,000
60,000,000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Year
$ M
illio
n Energy CostStaffingBldg. Maint. & Mgnt.R E Tax
DC Cost $17M
0
10,000,000
20,000,000
30,000,000
40,000,000
50,000,000
60,000,000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Year
$ M
illio
n Energy CostStaffingBldg. Maint. & Mgnt.R E Tax
DC Cost $17M
Source: IBM Estimates
© 2008 IBM Corporation
© 2008 IBM Corporation
© 2008 IBM Corporation
© 2008 IBM Corporation
Average Green Building Saves
Maintenance and Operations 10%-15% Savings
© 2008 IBM Corporation
What is the problem we’re trying to solve?• Constrained resources (space / power)• High cost of infrastructure and operations• No holistic view of IT & Facilities infrastructure
resources
Why is it a problem?• Inhibits revenue growth & responsiveness• Increases cost of operations, which undermines
competitiveness• Inability to drive intelligent business decisions around
E2E resource management
What is the high level solution?• Jointly optimize IT & Facility DESIGN• Jointly optimize IT & Facility OPERATIONS
IBM Data Center & Facilities Management
IBM’s Green Data Center Energy Management objective is to:Develop innovative solutions strategyDeployment plans which integrate IT and facilities infrastructureInfuses state-of-the-art hardware and software technologies, in order to optimize economically feasible and environmentally responsible data center designs and operations.
IT Assets(Servers, storage)
Building Systems(HVAC, power, lighting, security)
Data Center Infrastructure(UPS, PDUs)
© 2008 IBM Corporation
IT and Facilities Integration- Crossing Traditional Boundaries
ITFacility
Environment
•Can’t get needed power to grow the business•Facility automation creates data center-like characteristics•Servers required to manage asset monitoring•Want centralized management of IT, Environmental, and
Facilities monitoring
• New regulations on power usage• Energy rebates for using smart assets
• Space planning to optimize utilization of floor space• Predictive maintenance• Ability to efficiently deliver capacity and reliability to
meet business need
•Avoid IT service downtime caused by facility issue
© 2008 IBM Corporation
IBM Strategy- Integrated Maturity Roadmap
IT Infrastructure Energy Efficiency Strategy
Facility Infrastructure Energy Efficiency Strategy
Centralization
Physical Consolidation
Virtualization
Application Integration
Improved Operations
BestPractices
State-of-the-Art
Consolidate from many to fewer data centers
Reduce infrastructure complexity
Improve facilities management
Reduce staffing requirements
Improve business resilience (manage fewer things better)
Improve operational costs
Consolidate many servers into fewer on physical resource boundaries
Reduce system management complexity
Reduce physical footprints
Remove physical resource boundaries
Increase hardware utilization
Allocate less than physical boundary
Reduce software licensing costs
Migrate many applications into fewer images Simplify IT environment Reduce operations resources Improve application specific monitoring and
tuning
Conservation techniques Infrastructure energy efficiency Improved airflow management
Hot and cold aisles Improved efficiency
transformers, UPS, chillers, fans, and pumps
Free cooling
Integrated power management
Direct liquid cooling
Combined heat and power
© 2008 IBM Corporation
Maximo GreenDataCenter
- E2E Energy Efficiency Solution for DataCenter and Facility
Holistic Approach to Data Center and Facility Management
Lifecycle Management of Data Center and Facility
Facilitates Best Practices for Energy Efficiency, Confirmation
Monitors Operations Environment and Assets
Optimization Analysis of Resources, Energy Effectiveness
TempCO2CO
Humidity
© 2008 IBM Corporation
Spatial Managementwith Maximo Spatial
Holistic to detailed views
Map and visualize data center facilities• Facility, building, floor, room,
telephone, electrical, plumbing, substation, generators, UPS, PDU, CRAC
• Racks, servers, storage, switches, routers, network
Query, Analyze, and Symbolize results from aggregated internal and external data sources – monitoring data, assets, ERP, financials, usage
Obtain information on power, temperature, and layout, and identify problem areas
Enable improved facilities management in support of IT
Associate Assets and Service Request Records
© 2008 IBM Corporation
Lifecycle Managementwith IBM, Maximo, and Tivoli Capabilities
Asset Strategy – Requirements driven by organization’s mission and Business Goals
•Maximo Today
Plan – Plans and Policies that provide detailed frameworks for implementation of asset strategy
•Maximo Today
• Engineering and Design - Appraise asset and asset management solutions to ensure that it adds maximum value at the least cost
Create/procure - Carry out procurement processes to ensure that acquisition and outsourcing maximize the potential of the asset strategy
•Maximo Today
Operate - Operate assets more effectively through better information and processes
Maintain - Maintain assets to reduce cost and limit downtime•Maximo Today
Modify - Modify assets to reduce cost and limit downtime •Maximo Today
Dispose - Make the best decisions on asset disposal integrating decisions into strategy, planning and procurement as appropriate
•Maximo Today IBM, Maximo, and Tivoli Capabilities
Leverage information for Intelligent Business Decisions - Green
IBM, Maximo, and Tivoli Capabilities
© 2008 IBM Corporation
Facility Management - (Best Practices & Confirmation)with Maximo Asset & Work Management
• Perform preventive maintenance of building systems to support occupancy requirements
• Reduce facility energy consumption with effective building system maintenance
• Efficiently manage and track work orders
• Optimize scheduling of maintenance personnel – assign work to the right people
• Manage lease, rental, and labor contracts
• Track inventory levels and keep optimal order quantities of spare parts and materials
• Maintain asset information such as asset hierarchies, configurations, warranty data and historical maintenance performed
© 2008 IBM Corporation
Facility Management - (Best Practices & Confirmation)with Maximo Asset & Service Management
Define and deliver service level commitments according to occupancy needs based on variables such as asset type, time of day, end user or incident nature
Use workflow, escalations and automated response plans to ensure service levels are met
Manage sub-contractors and sub-contractor SLAs
Accomplish billing and charge-back to other business units
Integrate with building systems for condition monitoring to automate
© 2008 IBM Corporation
Space floor mounted device layout
Power site / building infrastructure
Demand by site / buildingequipment level @ nameplate kW
Implementationplacement @ 4kW per racknameplate kW vs. peak loadsinhibited by billing methodology
Utilization reports & plans space: floor areapower: building infrastructure
Space Maximo EAM /Spatialfloor mounted device layoutrack elevation device placementfloor load tracking & managementdevice serial link to corporate IWs
Power/Thermal Maximo EAM/Spatial, ITMsite/bldg infrastructure, PDU, IPDU/devicesdesign: Configuration, “What if”, CFDoperations: AEM, BMS, MMT modeling
Demand Maximo EAM/Spatial, ITMby site / buildingequipment level @ peak loadscross competency workflow integration
Implementation Maximo EAM/Spatial, ITM,TUAMoptimal placement criteriaaccurate power/thermal datapinpointed use of liquid coolingbill actual resource consumption
Utilization reports & plans Maximo EAM/Spatialspace: floor area & rack volumepower: data center infrastructureassets: consolidate / virtualize
Ensure space & power availability
Proactive & Policy Based Management
Start: Future: Optimize space & power availability
IBM Experience – IBM IT Delivery- Data Center Facility Evolution toward Efficient Design & Operation
INTEGRATION
ENTERPRISE
© 2008 IBM Corporation
Lifecycle Management – IBM IT DeliveryData Center & Facilities Integration – Capabilities
ITM/EAMRepository
*Space Management
Maximo Spatial• Physical model• Visualize & Analytics• Suitability, cable tracing
• DC (data center) portfolio• ELE (sqft, lbs, kW sizing)• CSC (UPS, GEN, CMP)• Global Site / Building
• IT equipment• SynapSense, IPDU+probes• APC,Liebert, Eaton support
• Bldg / area / non-AEM• BCS, OSIsoft Pi Server• Site / DC infrastructure
ITM for Data Center ITM for Building
Maximo Asset, Work, Service
• Engagement sizings• Device prep, placement• Installation / registration• Work Management
• # Sensor and placement• Cooling: design & assess• Tile placement - “What if”
• Device Discovery• ITAM (physical devices)• TADDM, CCMDB
Maximo Asset, CI’s
Building Monitor / OperationIT Monitor / OperationVisualization / Analysis• 2D (floor layout), 3D (rack
elevation), power, cooling, weight• Optimal placement of equipment• Power trace to floor PDU circuits• Query / pinpoint devices, regions• Asset mgmt collaboration
• Power / thermal measurements• Status, alerts, and controls• OSIsoft Pi Server metrics/analytics• Filtered feeds to ITM / TDW• Data Center PUE measurements
E2E
• Active Energy Manager alerts & controls with AutoCAD layouts
• IBM Tivoli Monitoring w/ MMT• ITUAM for revised billing methods• HW / SW physical & logical assets• CPU utilization metrics
CFD Modeling - MMT
© 2008 IBM Corporation
Facility Alarm Integration – Intelligent Thresholding
Facilities alerts can be integrated with IT events providing tighter awareness of “cause and effects” for IT incidents• What failed first – facilities or IT equipment• Awareness of failures and redundancies• Awareness of intermittent conditions
Out of the box thresholding for key facilities metrics
Event collection and processing via Tivoli event management capabilities• Aggregated events operable from existing
IT event consoles
© 2008 IBM Corporation
Energy management at an IT system level- Integration to IT Hardware
Tools for companies to meter, control, and even cap their power usage
Intelligent “cruise control” for power consumption of servers
Direct connection to IBM Servers
Access to additional resources through Intelligent PDUs
Connections to third party IT, data center, and facilities assets are planned by IBM
Integration to non-IBM servers
© 2008 IBM Corporation
Accounting for Energy Consumption
Usage, Accounting, Charging for Accountability
• Aggregate power consumption data, and determine cost of power consumed
• Knows amount of power consumed, when it was consumed, and what used the power.
• Costs can then be allocated to those who used the server (Accountability).
© 2008 IBM Corporation
Monitoring Power and Thermal
Monitor power usage and thermal data from IT resources through embedded sensors or via remote sensors
Operations dashboard integrates traditional IT measurements and emerging environmental measurements onto common dashboard
Aggregation of IT and environmental metrics with ability to take manual or automated actions when needed
Intelligent thresholding and event generation
© 2008 IBM Corporation
Optimize data center thermal profile to eliminate hot spots and reduce energy consumption.
Thermodynamic Savings: reduces hotspots improves targeted air flow / air flow management removes plenum temperature variations
Transport Savings: improves ACU* utilization improves ACU* flows
hot air is suckedinto cold aisle
13.0oC
54.5oC
33.7oC
Hot spot at long aisle@ 5.5 feet
* ACU = Air Conditioning Units
IBM Research Spotlight:- Thermal Analysis and Optimization – MMT
© 2008 IBM Corporation
12.3oC 42oC27.2oC
54oF 81oF 108oF
5 % of the hottest server covers 11 F ($$)low average temperature (67 F) – overcooled
-140 cfm 630 cfm
Simple provisioning will address hotspots reducing hotspots by 7F increases chiller
efficiency by ~12 %Enables free cooling using chiller bypassInterprets results & communicates guidance
service requestsautonomic commands
over-provisioned
under-provisioned
IBM Research Spotlight: - CFD Modeling - Hotspots and Air Flow Results
© 2008 IBM Corporation
Tivoli Green Management(Monitor, Measure and Manage)
IT Assets
3rd Party Servers and Storage
Tivoli SoftwareIBM® Systems Director
and Active Energy Manager
Facility Infrastructure Assets
Data Center Infrastructure Assets
IBM Tivoli Monitoring
Green Energy AdaptersIBM Tivoli Asset
Management spatial
visualization
Broad base of Partners Enable Data Center & Facility Energy Management
© 2008 IBM Corporation
© 2008 IBM Corporation
8 IBM Corporation 1994-2008. All rights reserved.References in this document to IBM products or services do not imply that IBM intends to make them available in every country.
Trademarks of International Business Machines Corporation in the United States, other countries, or both can be found on the World Wide Web at http://www.ibm.com/legal/copytrade.shtml.
Intel, Intel logo, Intel Inside, Intel Inside logo, Intel Centrino, Intel Centrino logo, Celeron, Intel Xeon, Intel SpeedStep, Itanium, and Pentium are trademarks or registered trademarks of Intel Corporation or its subsidiaries in the United States and other countries.Linux is a registered trademark of Linus Torvalds in the United States, other countries, or both.Microsoft, Windows, Windows NT, and the Windows logo are trademarks of Microsoft Corporation in the United States, other countries, or both.IT Infrastructure Library is a registered trademark of the Central Computer and Telecommunications Agency which is now part of the Office of Government Commerce.ITIL is a registered trademark, and a registered community trademark of the Office of Government Commerce, and is registered in the U.S. Patent and Trademark Office.UNIX is a registered trademark of The Open Group in the United States and other countries.Java and all Java-based trademarks are trademarks of Sun Microsystems, Inc. in the United States, other countries, or both.Other company, product, or service names may be trademarks or service marks of others.
Information is provided "AS IS" without warranty of any kind.
The customer examples described are presented as illustrations of how those customers have used IBM products and the results they may have achieved. Actual environmental costs and performance characteristics may vary by customer.
Information concerning non-IBM products was obtained from a supplier of these products, published announcement material, or other publicly available sources and does not constitute an endorsement of such products by IBM. Sources for non-IBM list prices and performance numbers are taken from publicly available information, including vendor announcements and vendor worldwide homepages. IBM has not tested these products and cannot confirm the accuracy of performance, capability, or any other claims related to non-IBM products. Questions on the capability of non-IBM products should be addressed to the supplier of those products.
All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only.
Some information addresses anticipated future capabilities. Such information is not intended as a definitive statement of a commitment to specific levels of performance, function or delivery schedules with respect to any future products. Such commitments are only made in IBM product announcements. The information is presented here to communicate IBM's current investment and development activities as a good faith effort to help with our customers' future planning.
Performance is based on measurements and projections using standard IBM benchmarks in a controlled environment. The actual throughput or performance that any user will experience will vary depending upon considerations such as the amount of multiprogramming in the user's job stream, the I/O configuration, the storage configuration, and the workload processed. Therefore, no assurance can be given that an individual user will achieve throughput or performance improvements equivalent to the ratios stated here.
Prices are suggested U.S. list prices and are subject to change without notice. Starting price may not include a hard drive, operating system or other features. Contact your IBM representative or Business Partner for the most current pricing in your geography.
Photographs shown may be engineering prototypes. Changes may be incorporated in production models.
Trademarks and disclaimers