Maximizing ROI on Utility Work Management Systems

44
Maximizing ROI on Utility Work Management Systems A look at a low total cost of ownership WMS by SSP Innovations

Transcript of Maximizing ROI on Utility Work Management Systems

Page 1: Maximizing ROI on Utility Work Management Systems

Maximizing ROI on Utility Work Management Systems

A look at a low total cost of ownership WMS by SSP Innovations

Page 2: Maximizing ROI on Utility Work Management Systems

Why we’re here

Page 3: Maximizing ROI on Utility Work Management Systems

About me Over 10 years in Utility Enterprise Systems Consultant / Solution Architect SSP Innovations Previous: Schneider Electric / Telvent / GeoFields GIS and Work Management Many large projects for utilities and energy

companies

Page 4: Maximizing ROI on Utility Work Management Systems

About SSP Innovations Utility Work Management Product: WFM aka Workforce

Management 12-year old Utility technology consulting company (GIS and

WMS) Work exclusively in the U.S. utility/telecom/pipeline industries

Began as a services company – now perform services and offer a line of software products

Page 5: Maximizing ROI on Utility Work Management Systems

Clients – Referral Network Started with 2 Clients… Now with 80+, Still 100% Reference-able

Alabama Power (Southern Co)Alliant EnergyAmerenBelmont LightBenton PUDCity of Beverly Hills, CABlack & VeatchBlack Hills CorporationBurbank Water & PowerBurlington Electric DeptCenterPoint EnergyCentral Lincoln PUDTown of Chapel Hill, NCClallam County PUDColorado DOTConnexus EnergyConsolidated ElectricCoServ ElectricCowlitz County PUDCPS EnergyCSpire Telecom

Kissimmee Utility AuthorityLansing Board of Waster and LightCity of Leesburg, FLLincoln Electric SystemCity of Longmont, COMemphis Light Gas & WaterMidcontinent CommunicationsMiddle Tennessee ElectricMidwest EnergyNavajo Tribal Utility AuthorityNew Braunfels UtilitiesNIPSCONiSourceNorthwest Natural GasNorwich Public UtilitiesNsight Telecom NSTAROconee County, SCPacific Gas & ElectricPasadena Water & PowerPend Oreille PUD

Denton Municipal EnergyDigital GlobeDigital West NetworksDouglas County PUDEnergy UnitedTown of Estes Park, COEugene Water & Electric BoardFayetteville PWCGarland Power & LightGeorgia Power (Southern Co)Glendale Water & PowerGreen Mountain PowerGreenville Utilities CommissionHart EMCHolyoke Gas & ElectricCity of Houston, TXHydro OneIntermountain REAJackson Energy AuthorityKissimmee Utility AuthorityLansing Board of Water and Light

PLA DetroitPortland General ElectricPOWER EngineersPublic Services of New MexicoRedding Electric UtilityCity of Roseville, CASam Houston ElectricSCANASchneider ElectricSMECOSwovaTexas-New Mexico PowerTOA TechnologiesTri-County ElectricTri-State G&TUniSourceUtility Data ContractorsVectrenVerizonWestar EnergyZia Natural Gas

Page 6: Maximizing ROI on Utility Work Management Systems

Agenda Utility Work Management Systems Evaluation Points for Acquisition:

Initial considerations Functional characteristics of low cost WMS Implementation considerations

Summary Questions

Page 7: Maximizing ROI on Utility Work Management Systems

Work Management Systems“Work management is a set of software products and services that apply workflow structure to the movement of information as well as to the interaction of business processes and human worker processes that generate the information. Work management streamlines and transforms crucial business processes and thus can improve results and performance.”

Page 8: Maximizing ROI on Utility Work Management Systems

Utility Work Management Systems?

Capital Work Management Work Order Management Workforce Management Work Management Work Order Asset Management Service Request Management Asset Management

Page 9: Maximizing ROI on Utility Work Management Systems

Utility Work Management Systems

Construction Jobs for Assets Engineering Department

Page 10: Maximizing ROI on Utility Work Management Systems

Asset Construction (and Maintenance)

Page 11: Maximizing ROI on Utility Work Management Systems

WMS History: Construction jobs managed with paper

Page 12: Maximizing ROI on Utility Work Management Systems

WMS History: Construction jobs in Excel

Page 13: Maximizing ROI on Utility Work Management Systems

Historical Problems Disparate data scattered across the organization No enforcement of business process (silos) No standardization of estimation No opportunities for integrations with other

departments / systems Difficulty understanding what was estimated vs.

what was actually constructed

Page 14: Maximizing ROI on Utility Work Management Systems

Construction Jobs in an Enterprise WMS

Page 15: Maximizing ROI on Utility Work Management Systems

Benefits of Enterprise WMS One central system of record Streamline business processes Improved project oversight Regulatory compliance Standardize design and estimation Audit tracking

Page 16: Maximizing ROI on Utility Work Management Systems

Evaluation Points: Initial Considerations

The ‘Fit’ Configuration vs. Customizations vs. Product

Enhancements/Modifications Technology Framework

Web Mobile Support

Integrations and Integration consciousness

Page 17: Maximizing ROI on Utility Work Management Systems

Identify areas of need (WMS)

WMS

Project Organization

Project Estimating

Project Scheduling

Project Task Management

Project Reporting

Field Crew Coordination

As Built Recording

Page 18: Maximizing ROI on Utility Work Management Systems

Identify areas of need (External)

WMS

Work Originatio

n

Customer Payments

Accounting

Project Reporting

Material Man.

Field Crews

GWD / GIS

Asset Man.

Page 19: Maximizing ROI on Utility Work Management Systems

Not all WMS are created equally

Page 20: Maximizing ROI on Utility Work Management Systems

Configuration vs. Customization vs. Product Modifcations

Configuration: No coding required! Use out of the box tools / database values / updates to files to achieve desired outcome.

Customizations: Required a code change to achieve desired results. Intentionally extensible aspect of the core product framework. Does not require a change to the core product. Less costly!

Product Enhancement / Modifications – Requires a code change and a release. Impacts many customers.

Even longer testing cycles May have to wait to prioritize functionality with the market

Page 21: Maximizing ROI on Utility Work Management Systems

Priorities!

1. Configuration2. Customization3. Product Modification / Enhancement

Page 22: Maximizing ROI on Utility Work Management Systems

Integration Consciousness of a WMS

Page 23: Maximizing ROI on Utility Work Management Systems

Integration Consciousness Integration: Configuration vs. Customization vs.

Product Modification Application Design Open data model

Page 24: Maximizing ROI on Utility Work Management Systems

Integration Consciousness Potentially costly (but important!) integrations

GIS – Most expensive integration Work area organization (i.e. points, spans, area)

Accounting Materials Management

2 WFM Examples: WFM Estimates and GWD Designs WFM Estimates and Property Accounting

Page 25: Maximizing ROI on Utility Work Management Systems

WMS Estimates and Graphic Work Design / GIS

Service/Work, Request/Order Workflow – Status, Transitions, and Tasks Estimate/Design Work Locations Compatible Units / GWD objects or features

Resources: Material, Labor and Equipment As Builts

Page 26: Maximizing ROI on Utility Work Management Systems

WMS Estimates and Property Accounting

Page 27: Maximizing ROI on Utility Work Management Systems

Integration Design

Page 28: Maximizing ROI on Utility Work Management Systems

Technology Framework Web-based: Why? Are all web-based systems the same? Mobile considerations

Page 29: Maximizing ROI on Utility Work Management Systems

Device Responsiveness UI / UX

Page 30: Maximizing ROI on Utility Work Management Systems

Evaluation Points: Functional characteristics of low cost systems

Adaptability to utility business processes Handle job types / common tasks What should be configurable?

Efficiency of common data entry (Estimates!)

Page 31: Maximizing ROI on Utility Work Management Systems

Adaptability to utility business process

Lifecycle Management

Initiation Planning Approval Construction

Recording as Built Closeout

Page 32: Maximizing ROI on Utility Work Management Systems

Adaptability to utility business process

Job Scalability Out of the box can you?

Define Job Types Define the project’s job requirements (checklist) by Job

Type Define statuses by Job Types Define available tasks by status Define available tasks by user roles/permissions

Page 33: Maximizing ROI on Utility Work Management Systems

Important Configurations: adapability

Resources Compatible Units Macro Units

Page 34: Maximizing ROI on Utility Work Management Systems

Data input efficiency Estimates! Estimates! Estimates!

Page 35: Maximizing ROI on Utility Work Management Systems

Data Input: A WMS CU / MU Selector

Type ahead and categorization

Page 36: Maximizing ROI on Utility Work Management Systems

Data Input: Estimates: Inline editing for CUs, MUs, and Misc Items

Page 37: Maximizing ROI on Utility Work Management Systems

Data Input: Estimate Worksheet -Work Locations and CU Selection Controls

Page 38: Maximizing ROI on Utility Work Management Systems

Important implementation considerations

Implementation Project Change Management

Page 39: Maximizing ROI on Utility Work Management Systems

Implementation Project Discovery (for internal and/or external team)! System Architecture System Integrators and/or Project Team Familiarity

with: Affected systems Business processes Technology implemented All!

Thorough design vetted by Users!

Page 40: Maximizing ROI on Utility Work Management Systems

Change Management Involve Users, Users, and Users!

From start to finish

Page 41: Maximizing ROI on Utility Work Management Systems

Indications of Inflexible WMS Generic enterprise system that can be used for

any purpose Development required to do things you would expect all

utilities to do Workflows are developed not configured No discussion of common hooks or extensibility No discussion of an API Little or no plans for integrations

Page 42: Maximizing ROI on Utility Work Management Systems

Indications of Flexible WMS Efficient data entry Workflow Engine that can be configured Instant recognition for placement (extensible

framework) of uncommon (company specific) modules

‘You can configure the system’ to do common things you’d expect utilities to do

Page 43: Maximizing ROI on Utility Work Management Systems

Questions?

Page 44: Maximizing ROI on Utility Work Management Systems

Thank You!

Chris Sanders: [email protected]

SSPInnovations.com