Material Requiremant Mrp
Transcript of Material Requiremant Mrp
-
8/14/2019 Material Requiremant Mrp
1/24
Good morning to all of u.presented by:-Lishma Soni
Nancy Parveen jainRavesh
Divya.
-
8/14/2019 Material Requiremant Mrp
2/24
MATERIAL REQUIREMANT
PLANNING(MRP) MRP is a technique of determining the
requirement for raw material
components,& spare parts etc required formanufacturing products. if delievery dateof product is known then everything can
be planned very easily like time requiredor quality of material required etc.
-
8/14/2019 Material Requiremant Mrp
3/24
Material requirement planning isa system used for planning thefuture requirement of dependent demand items.thisplanning is done on threeinputs:-
-
8/14/2019 Material Requiremant Mrp
4/24
Inputs in MRP.
No. of items already in the inventory(inventory status).
No. of finished goods to be produced inthe near future using these items.
No.of units of the item required formanufacturing a single unit of the finishedproduct.
-
8/14/2019 Material Requiremant Mrp
5/24
Inputs of MRP
BILL OF MATERIAL MASTER PRODUCTION SCHEDULE. INVENTORY STATUS.
-
8/14/2019 Material Requiremant Mrp
6/24
BILL OF MATERIAL.
Bill of material is a document which tellsus about an items product
structure,showing the sequence in whichcomponents are assembled & theirrequired numbers.it also contain detailes
about the workstations at which the itemsis assembled.
-
8/14/2019 Material Requiremant Mrp
7/24
Master production schedule.
An aggregate production plan tells us howmany units of a product have to be
manufactured in the coming 6-18monthson a weekly or monthly basis.
-
8/14/2019 Material Requiremant Mrp
8/24
Inventory status.
It tells us about the status of the inventory of anitems at present,or in a given interval of time in
the coming future.this includes scheduledreceipts of units of items in the interval of timeas a result of orders placed in the recent past tosuppliers.the inventory status files also contain
details about the suppliers of the items,the leadtime taken by him to supply the item,& the sizeof each order to be placed to him.
-
8/14/2019 Material Requiremant Mrp
9/24
Outputs in MRP
Planned orders report Orders release report Order changes report
-
8/14/2019 Material Requiremant Mrp
10/24
Planned order report
This report gives information aboutplanned orders to be released on some
future date during a given interval of time.it is helpful in preparing for the fundsrequired for the payments to the suppliers
in the future according to the dates & order sizes.
-
8/14/2019 Material Requiremant Mrp
11/24
Order release report
This report gives the information aboutplanned orders to be released on the
present date.it helps the purchse managerto release purchase order to the suppliers.
-
8/14/2019 Material Requiremant Mrp
12/24
Order change report
Open order are those which have beenplaced in the past,& the suppliers of the
items is preparing for these suppliers to bemade to the company.during the lead timethe MPS of the company may fluctuate.
-
8/14/2019 Material Requiremant Mrp
13/24
BENEFITS Appropriate use of material so that less
wastage is incurred. Availability of material at right time. Optimum utilization of working capital. More efficiency,more productivity.
No delay in the delievery of products. Efficient working of production.
-
8/14/2019 Material Requiremant Mrp
14/24
Saving in the form of time & money. Minimize the cost of production. Continues flow of control.
-
8/14/2019 Material Requiremant Mrp
15/24
Seasonal Inventory
Decoupling InventoryCyclic InventoryPipe line InventorySafety Stock
-
8/14/2019 Material Requiremant Mrp
16/24
Seasonal Inventory :- Organizationscarry inventory to meet fluctuations in
demand arising out of seasonality. Inorder to meet the demand, inventory buildup happens during non-peak periods.
Decoupling Inventory :- Manufacturingsystems typically involve a series of
production and assembly workstations.One way to simplify the productionplanning and control problem is to
decouple successive stages usinginventor at some intermediate oints.
-
8/14/2019 Material Requiremant Mrp
17/24
Cyclic Inventory :- It is customary fororganizations to order inventory in repeated cycles
and consume them over time. Each cycle beginswith replenishment and ends with completedepletion of the inventory.
Pipeline Inventory :- It pertains to the level of inventory that organizations carry in the long rundue to non-zero lead time for order, transport andreceipt of material from the suppliers.
Safety Stock :- Organizations also haveadditional investment in inventory to buffer
against uncertainties in demand and supply of raw
-
8/14/2019 Material Requiremant Mrp
18/24
There are several costs associated withinventory planning and control. These
costs could be classified under threebroad categories.
Inventory Carrying CostCost Of Ordering
Cost Of Shortages
-
8/14/2019 Material Requiremant Mrp
19/24
Inventory Carrying Cost :- ICC includes cost of stores and warehousing and administrative costs.The other ICC includes insurance costs, cost of obsolescence, damages and wastage. Thecomponents of ICC exert considerable pressure onan organization to keep inventory to low levels.
Cost Of Ordering :- Organizations perform a seriesof tasks related to ordering material. These includessearch and identification of appropriate sources of supply, price negotiation, contracting and purchaseorder generation, follow-up and receipt of material.
All these involve manpower, resources and time thatcould be classified under cost of ordering.
Cost of Shortages :- Despite careful planning, it islikely that organizations run out of stock. It alsointroduces additional costs arising out of pushing
-
8/14/2019 Material Requiremant Mrp
20/24
-
8/14/2019 Material Requiremant Mrp
21/24
Organizations employ some methods tomanage and control inventory. Continuous Review (Q) System The Periodic Review (P) System
Continuous Review (Q) SystemOrganizations widely use a continuous
review system called a two-bin system. Inoperation, the available inventory is stockedin two bins, first in a smaller bin and thebalance in a larger bin. As the material inconsumed, the larger bin is emptied first. Assoon as the larger bin is empty, an order isplaced with a supplier for a predetermined
-
8/14/2019 Material Requiremant Mrp
22/24
The Periodic Review (P) System
An alternative model for inventorycontrol, known as periodic review system,operates differently from the Q system. Ina periodic review system, the inventorylevel in the system is reviewed at fixedintervals of time. Therefore, thesesystems are also known as fixed orderinterval systems.
In P system, the twodecisions when and how much are
made in a different fashion compared to
-
8/14/2019 Material Requiremant Mrp
23/24
Managing inventory is an issue pertaining toa large no and variety of items.Organizations, therefore, devise suitableways of categorising the items and adoptmechanisms that have variable levels of control on the different categories of items.
ABC Classification :- The ABC classification
of inventories is based on the cost (orvalue) of items consumed. Very high valueitems are A class items and may require
tighter control. Medium value items are
-
8/14/2019 Material Requiremant Mrp
24/24
On the basis of unit cost of the item(XYZ classification)a) High unit cost (X Class item)b) Medium unit cost (Y Class item)c) Low unit cost (Z Class item)
On the basis of movement of inventory(FSN classification)a) Fast movingb) Slow movingc) Non-moving
On the basis of criticality of items(VED classification)a) Vitalb) Essentialc) Desirable
On the basis of sources of supplya) Importedb) Indigenous( National suppliers)