S.No Material Description
Quantity
per Loco1 2 Core Cable( 1 mm) 12 mt
2 3 Core Cable 1 mt3 8 Core Cable (0.4 mm) 2 mt
4 12 Core Cable (0.4 mm) 14
5 Single Core Cable Red( 1 mm) 14
6 Single Core Cable Black( 1 mm) 14
7 One pair twisted cable with shielding (7/0.2mm) 14
8 One pair twisted cable with shielding (7/0.4mm) 6
9 TNC to TNC CABLE RG223 (6 mt) 1
10 TNC to TNC CABLE RG223 (6.5 mt) 1
11 3/4 " Conduit 34 mtr
12 1/2" Conduit 12 mtr
13 22mm brazed glands to 3/4" conduit 1 mt length 6
14 16mm brazed glands to 1/2" conduit 1 mt length 415 Flat brazed glands to 1/2" conduit 1 mt length 3
16 M4 Lugs 5
17 M14 Lugs 2
18 M3 x 10mm Pan head screws 15
19 M3 Plane Washers 15
20 M3 Spring Washers 15
21 M3 rubber washer 10
22 M4 x 25mm HEX with slot 10
23 M4 Plane Washers 15
24 M4 Spring Washers 15
25 M4 x 12mm Pan head screws 5
26 M4 nut 30
27 M8 Nut 628 M8 Spring Washer 6
29 M8 Plane Washer 6
30 M13 Nut 4
31 M13 Spring Washer 4
32 M13 Plane Washer 4
33 M13 Rubber washer 4
34 1 1/2 " Elbow 3
35 Heat Sinkable Sleeve 8 mm 10 cm
36 Heat Sinkable Sleeve 4 mm 10 cm
37 3/8" x 1/2" BSP Male connector 4
38 3/8" x 1/4" BSP Male connector 2
39 1/4" T connector 140 1/2" Copper pipe with ID:5mm 8 mt
41 1/4" Copper pipe with ID:2.5mm 4 mt
42 3/4" x 1/2" Adaptor 2
43 Rubber Hose pipe 3/4 " 4.5 mt
44 Nipple Shank 2
45 Hose fixing clips 4
46 GPS Antenna Frame 1
REQUIRED MATERIAL FOR LOCO I
-
7/28/2019 Material Required for Loco Installation
2/6
47 Planar Antenna Frame 1
48 3/4" Clamps 20
49 3/4 " clamp base plate one way 10
50 3/4 " clamp base plate two way 5
-
7/28/2019 Material Required for Loco Installation
3/6
Remarks
'
If the glands in the removal Loco are in OKcondition then they can be consumed.
NSTALLATION
-
7/28/2019 Material Required for Loco Installation
4/6
NFR stock.
-
7/28/2019 Material Required for Loco Installation
5/6
S.No
Type of Work/
Material description
Quantity per
Loco
Amount for the
work/material Remarks
1 Welder Charge - 1250
Cutting andwelding rods has
to be provided by
us.
2 Carpenter Charge - 300
3 Driver Console stand 2 180 per stand
4 Copper pipe fixing clamp 6 36 per piece
5 ACD Frame 1 550
6 ABU Frame 1 550
7 BBU Frame 1 App Rs. 200
fabrication of this
item not done
earlier
8 Miscellinious 200
If these are
provided by
company then not
required.This is
the fabrication
cost in the month
February-2012.At
present the cost
may varry
FABRICATION AND LABOUR CHARGES
-
7/28/2019 Material Required for Loco Installation
6/6
S.No Material Description
Quantity per
Loco Remarks1 Insulation Tape 4
2 Non Adhesive Tape 13 Teflon Tape 1
4 Cable Ties 200mm 30
5 Cable Ties 100mm 20
6 Cable Sticks (Big) 10
7 Cable Sticks (Small) 10
8 Welding Rod ( No:10 ) 20
9 Cutting Rod 10
10 HackSaw Blade 1
2 No's Aligner,1 No stripper,1 No Flat File,1 No cutter,1 Nose
plier and 1 No Knife has to be issued during installation
process.
Note : -