material in the east treatment cell, and improve flow in ...

5
Project Location Section 36 T-2S, R-8W and Section 1 T-3S, R8W Lat: 38°17'28" Lon: 87°15'00" AML Site Boundary Site No. 898 NPDES Discharge Point 001 Lat: 38°17'31" Lon: 87°14'53" AML Site Boundary Site No. 978 AML Site Boundary Site No. 979 ENOS WETLAND SITE NO. 898 CONTRACT NO. DEL2115208087/E008-317 PIKE COUNTY STATE OF INDIANA INDIANA DEPARTMENT OF NATURAL RESOURCES DIVISION OF RECLAMATION ABANDONED COAL MINE RESTORATION ENOS WETLAND SITE 898 CONTRACT DEL2115208087/E008-317 PIKE COUNTY APPROVED FOR LETTING: DIVISION OF RECLAMATION DATE Remove and replace substrate material in the west treatment cell, stir the substrate material in the east treatment cell, and improve flow in the sediment pond. SCALE SITE SHEET PROJECT AS NOTED E008-317 1 OF 5 898 GENERAL NOTES Plans developed from topographic mapping survey flown in 2008 by Williams Aerial & Mapping, Inc. in NAD 83, Indiana State Plane West, Feet. INDEX SHEET TITLE SHEET NO. 1 TITLE, INDEX, & LOCATION MAP 2 3-4 SITE PLANS SITE MAP 2010 AML Standard Specifications to be used with these plans. UTILITIES ELECTRIC: Duke Energy, Inc. 390 N Main Street Martinsville, IN 46151 (317) 776 - 5341 NATURAL GAS: Vectren (South) 1800 W. 26th St. Muncie, IN 47302 (765) 287 - 2119 TELECOM: Frontier 8001 West Jefferson Blvd Fort Wayne, IN 46804 (260) 461 - 3324 WATER/SANITARY: Pike-Gibson Water, Inc. 300 N Jackson St. Oakland City, IN 47660 (812) 749 - 4916 Spurgeon Water Corporation 11440 S State Road 61 Spurgeon, IN 47584 (812) 721 - 2043 Call Before You Dig. Indiana Underground Plant Protection Service (IUPPS) 1-800-382-5544 or 811 from your mobile phone. The facilities of the following utilities exist near the project site but are not expected to be affected by the proposed construction. If questions arise, the utility may be contacted using the information below. PLANS PREPARED BY: (812) 665-2207 PHONE NUMBER Project Location Map Augusta and Oakland City US TOPO Series Maps (USGS, 2019) CERTIFIED BY: DATE INDIANA DEPARTMENT OF NATURAL RESOURCES DIVISION OF RECLAMATION 0 2,000 4,000 5 DETAILS An NPDES permit is required for this project.

Transcript of material in the east treatment cell, and improve flow in ...

Page 1: material in the east treatment cell, and improve flow in ...

Project LocationSection 36

T-2S, R-8W andSection 1

T-3S, R8WLat: 38°17'28"Lon: 87°15'00"

AML Site BoundarySite No. 898

NPDES Discharge Point 001Lat: 38°17'31"Lon: 87°14'53"

AML SiteBoundary

Site No.978

AML Site BoundarySite No. 979

ENOS WETLANDSITE NO.

898

CONTRACT NO.

DEL2115208087/E008-317

PIKE COUNTY

STATE OF INDIANAINDIANA DEPARTMENT OF NATURAL RESOURCES

DIVISION OF RECLAMATION

ABANDONED COAL MINERESTORATION

ENOS WETLANDSITE 898

CONTRACT DEL2115208087/E008-317PIKE COUNTY

APPROVEDFOR LETTING:

DIVISION OF RECLAMATION DATE

Remove and replace substrate material in the west treatment cell, stir the substratematerial in the east treatment cell, and improve flow in the sediment pond.

SCALE

SITE

SHEET

PROJECT

AS NOTED

E008-317

1 OF 5

898

GENERAL NOTES

Plans developed from topographic mapping survey flown in 2008by Williams Aerial & Mapping, Inc. in NAD 83, Indiana State PlaneWest, Feet.

INDEXSHEET TITLESHEET NO.

1 TITLE, INDEX, & LOCATION MAP

2

3-4 SITE PLANS

SITE MAP

2010 AML Standard Specifications to be used with these plans.

UTILITIES

ELECTRIC:Duke Energy, Inc.390 N Main StreetMartinsville, IN 46151(317) 776 - 5341

NATURAL GAS:Vectren (South)1800 W. 26th St.Muncie, IN 47302(765) 287 - 2119

TELECOM:Frontier8001 West Jefferson BlvdFort Wayne, IN 46804(260) 461 - 3324

WATER/SANITARY:Pike-Gibson Water, Inc.300 N Jackson St.Oakland City, IN 47660(812) 749 - 4916

Spurgeon Water Corporation11440 S State Road 61Spurgeon, IN 47584(812) 721 - 2043

Call Before You Dig. Indiana Underground Plant ProtectionService (IUPPS) 1-800-382-5544 or 811 from your mobile phone.

The facilities of the following utilities exist near the project sitebut are not expected to be affected by the proposed construction.If questions arise, the utility may be contacted using theinformation below.

PLANSPREPARED BY: (812) 665-2207

PHONE NUMBER

Project Location MapAugusta and Oakland City US TOPO Series Maps (USGS, 2019)

CERTIFIED BY:DATE

INDIANA DEPARTMENT OF NATURAL RESOURCESDIVISION OF RECLAMATION

0 2,000 4,000

5 DETAILS

An NPDES permit is required for this project.

chostetler
CJH Stamp
chostetler
CJH Signature
chostetler
Text Box
7/20/2020
chostetler
Text Box
7/31/2020
chostetler
SJW Signature
Page 2: material in the east treatment cell, and improve flow in ...

Sheet 3

Sheet 4

Staging and Mixing AreaAML Site 979

AML Site 898

AML Site 978

Project LimitsN:1,

107,6

20.63

E:2,90

4,622

.64

N:1,10

8,575

.90

E:2,90

5,598

.06

N:1,10

9,088

.27

E:2,90

5,058

.67

N:1,10

8,368

.27

E:2,90

4,397

.29

N:1,105,762.80E:2,903,234.85

N:1,104,387.25E:2,903,247.98

N:1,104,468.49E:2,904,025.66N:1,105,439.34

E:2,904,012.50

SITE MAP

STATE OF INDIANA

DEPARTMENT OF NATURAL RESOURCESDIVISION OF RECLAMATION

DATE MADE

DRAWN BYDESIGNED BY DATE REVISED

5/13/2020

C.J.H. C.J.H. 7/15/2020 11:34:34 AM

SCALE

SITE

SHEET

PROJECT

1" = 300'

E008-317

2 OF 5

898

RECOMMENDEDFOR APPROVAL:

DATE

LegendAML Site Boundary

Site AccessStaging Area

Project Limits

Sheet Index

0 300 600

chostetler
CJH Stamp
chostetler
CJH Signature
chostetler
Text Box
7/20/2020
Page 3: material in the east treatment cell, and improve flow in ...

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SFSF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

West Treatment Cell,remove substrate materialdown to top of limestone

(approx. 437.0' elev.),disposal at stockpile locationas shown on Sheet 4, placenew organic substrate (see

Detial 3, Sheet 5 for organicsubstrate mixture

percentages)

Excavate 3' below waterelev. and 12' wide,dispose in areas onopposite side of berm

Excavationdisposal areas

East Treatment Cell,stir substratematerial down to topof dolomite (approx.437.0' elev.)

Approx. location of wetlandpipes in limestone/dolomite

layers, do not disturb

Silt fence, 777 LFT(see Detail 2, Sheet 5)

N:1,107,620.63E:2,904,622.64

N:1,108,575.90E:2,905,598.06

N:1,109,088.27E:2,905,058.67

N:1,108,368.27E:2,904,397.29

SITE PLAN - TREATMENT CELLS & SEDIMENT POND

STATE OF INDIANA

DEPARTMENT OF NATURAL RESOURCESDIVISION OF RECLAMATION

DATE MADE

DRAWN BYDESIGNED BY DATE REVISED

5/13/2020

C.J.H. C.J.H. 7/15/2020 11:34:34 AM

SCALE

SITE

SHEET

PROJECT

1" = 100'

E008-317

3 OF 5

898

RECOMMENDEDFOR APPROVAL:

DATE

LegendExisting Contour

Project Limits

Existing Paved Road/Drive

Exist. Unpaved Road/Drive

Existing Water

Existing Tree Line

Existing Guardrail

Existing FenceX X

Utility Pole

Staging AreaDisposal (material as noted)

Existing Spot Elevation

Exist. Bathymetric Contour

Existing Building/Structure

Site Access

0 100' 200'

chostetler
CJH Stamp
chostetler
Text Box
7/20/2020
chostetler
CJH Signature
Page 4: material in the east treatment cell, and improve flow in ...

SF

SFSF

SFSF

SFSF

SFSF

SF SF SF SF SF SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF SF

SFSF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

Staging and Substrate Mixing Area(approx. 1.5 ac)

Substrate Disposal Area (approx. 0.5 ac), placesubstrate in 12" lifts and apply agricultural lime

at a rate of 50 tons/acre on each lift

Silt fence, 803 LFT(see Detail 2, Sheet 5)

Silt fence, 1,148 LFT(see Detail 2, Sheet 5)

N:1,105,762.80E:2,903,234.85

N:1,104,387.25E:2,903,247.98

N:1,104,468.49E:2,904,025.66N:1,105,439.34

E:2,904,012.50

SITE PLAN - STAGING, MIXING, & DISPOSAL AREAS

STATE OF INDIANA

DEPARTMENT OF NATURAL RESOURCESDIVISION OF RECLAMATION

DATE MADE

DRAWN BYDESIGNED BY DATE REVISED

5/13/2020

C.J.H. C.J.H. 7/15/2020 11:34:34 AM

SCALE

SITE

SHEET

PROJECT

1" = 100'

E008-317

4 OF 5

898

RECOMMENDEDFOR APPROVAL:

DATE

LegendExisting Contour

Project Limits

Existing Paved Road/Drive

Exist. Unpaved Road/Drive

Existing Water

Existing Tree Line

Existing Guardrail

Existing FenceX X

Utility Pole

Staging AreaDisposal (material as noted)

Existing Spot Elevation

Exist. Bathymetric Contour

Existing Building/Structure

Site Access

0 100' 200'

chostetler
CJH Stamp
chostetler
Text Box
7/20/2020
chostetler
CJH Signature
Page 5: material in the east treatment cell, and improve flow in ...

DETAILS

STATE OF INDIANA

DEPARTMENT OF NATURAL RESOURCESDIVISION OF RECLAMATION

DATE MADE

DRAWN BYDESIGNED BY DATE REVISED

5/13/2020

C.J.H. C.J.H. 7/15/2020 11:34:34 AM

SCALE

SITE

SHEET

PROJECT

AS NOTED

E008-317

5 OF 5

898

RECOMMENDEDFOR APPROVAL:

DATE

Flow

4" min.

Not to Scale

Temporary Check Dam, Straw Bale1

Stakes to be driventoward next balemin. 12" into ground

1" x 2" woodstakes (typ.)

Straw balesw/ wire ornylon binding

Note:Ends of individual rolls of fabric shallbe securely fastened to a commonpost and overlapped 3 in. min.

Not to Scale

Silt Fence2

SedimentPond

Existing limestoneand/or dolomite layer

Normal pool, approx. 3' above organic substrate

Organic substrate

2'

3'

Standpipe

Not to Scale

Typical Existing Treatment Cell (from As-builts)3

Notes:New organic substrate materialin the west treatment cell shallconsist of a mix by volume ofthe following materials: 60%wood chips, 10% agriculturallime, 20% straw/hay, and 10%compost.

Piping System, Do Not Disturb

chostetler
CJH Stamp
chostetler
Text Box
7/20/2020
chostetler
CJH Signature