Master HA CM Summary Message Draft 07APR11 1100

23
DRAFT UNCLASSIFIED OPERATIONAL IMMEDIATE O XXXXXZAPR11 (STANDRD DTG, NOT YET RELEASED) FM COMJSF TO PACAF COMSEVENTHFLT CG III MEF COMUSJAPAN YOKOTA AB JA CG 3RD MARDIV 353RD SOG INFO HQ USPACOM HONOLULU HI//J01/J02/J2/J3J4//J5/J6/J9/SJFHQ/JIOC// COMUSFK SEOUL KOR//J00/J3/J4/J5// COMPACFLT PEARL HARBOR HI HQ PACAF JOINT BASE PH-HICKAM HI//A00/A3// COMMARFORPAC CAMP SMITH HI 5AF YOKOTA AB JA CDRUSARPAC FT SHAFTER HI ALCOM ELMENDORF AFB AK COMSOCPAC HONOLULU HI COMNAVFORJAPAN YOKOSUKA JA CDR USARJ MCB ACTIVITIES, CG MCB CAMP BUTLER JP BT UNCLAS OPER/TOMODACHI// MSGID/ORDER/JSF// SUBJ/OPERATION TOMODACHI CONSOLIDATED TASKING ORDER FOR 07 APR 2011// REF/A/ORDER/COMJSF/301210ZMAR11// REF/B/ORDER/COMJSF/051120ZAPR11// REF/C/ORDER/USFJ/262006ZMAR11// REF/D/ORDER/COMJSF/301100ZMAR11// REF/E/ORDER/COMJSF/302236ZMAR11// REF/F/ORDER/COMJSF/021246ZAPR11// REF/G/ORDER/COMJSF/040400ZAPR11// REF/H/ORDER/COMJSF/041015ZAPR// REF/I/MSG/COMJSF/ XXXXXXZAPR11// REF/J/MSG/PACOM/180956ZMAR11// REF/K/MSG/JSF/311247ZMAR11// NARR/ REF A IS COMJSF MSG OPERATION TOMODACHI CONSOLIDATED HA TASKING ORDER FOR 31 MAR 2011. REF B IS COMJSF HA TASKING UPDATE FOR 06APR11. REF C IS JSF OP TOMODACHI EXORD. REF D IS JSF OP TOMODACHI EXORD MOD 1. REF E IS JSF OP TOMODACHI EXORD MOD 2. REF F IS JSF OP TOMODACHI EXORD MOD 3. REF G IS JSF OP TOMODACHI EXORD MOD 4. REF H IS JSF OP TOMODACHI EXORD MOD 1

Transcript of Master HA CM Summary Message Draft 07APR11 1100

Page 1: Master HA CM Summary Message Draft 07APR11 1100

DRAFTUNCLASSIFIED

OPERATIONAL IMMEDIATE

O XXXXXZAPR11 (STANDRD DTG, NOT YET RELEASED)FM COMJSF TO PACAFCOMSEVENTHFLTCG III MEFCOMUSJAPAN YOKOTA AB JACG 3RD MARDIV353RD SOGINFO HQ USPACOM HONOLULU HI//J01/J02/J2/J3J4//J5/J6/J9/SJFHQ/JIOC//COMUSFK SEOUL KOR//J00/J3/J4/J5//COMPACFLT PEARL HARBOR HIHQ PACAF JOINT BASE PH-HICKAM HI//A00/A3//COMMARFORPAC CAMP SMITH HI5AF YOKOTA AB JACDRUSARPAC FT SHAFTER HIALCOM ELMENDORF AFB AKCOMSOCPAC HONOLULU HICOMNAVFORJAPAN YOKOSUKA JACDR USARJMCB ACTIVITIES, CG MCB CAMP BUTLER JPBTUNCLASOPER/TOMODACHI//MSGID/ORDER/JSF//SUBJ/OPERATION TOMODACHI CONSOLIDATED TASKING ORDER FOR 07 APR 2011//REF/A/ORDER/COMJSF/301210ZMAR11//REF/B/ORDER/COMJSF/051120ZAPR11//REF/C/ORDER/USFJ/262006ZMAR11//REF/D/ORDER/COMJSF/301100ZMAR11//REF/E/ORDER/COMJSF/302236ZMAR11//REF/F/ORDER/COMJSF/021246ZAPR11//REF/G/ORDER/COMJSF/040400ZAPR11//REF/H/ORDER/COMJSF/041015ZAPR//REF/I/MSG/COMJSF/XXXXXXZAPR11//REF/J/MSG/PACOM/180956ZMAR11//REF/K/MSG/JSF/311247ZMAR11//NARR/ REF A IS COMJSF MSG OPERATION TOMODACHI CONSOLIDATED HA TASKING ORDER FOR 31 MAR 2011. REF B IS COMJSF HA TASKING UPDATE FOR 06APR11. REF C IS JSF OP TOMODACHI EXORD. REF D IS JSF OP TOMODACHI EXORD MOD 1. REF E IS JSF OP TOMODACHI EXORD MOD 2. REF F IS JSF OP TOMODACHI EXORD MOD 3. REF G IS JSF OP TOMODACHI EXORD MOD 4. REF H IS JSF OP TOMODACHI EXORD MOD 5. REF I IS COMJSF DAILY INTENTIONS MESSAGE FOR 07APR11. REF J IS DIRECTION TO ESTABLISH JSF JOINT REQUIREMENTS REVIEW BOARD. REF K IS JSF AUTHORIZATION TO CONDUCT FLIGHT OPS ISO JMSDF SEARCH EFFORTS.//RMKS/1. THIS MESSAGE SUPERSEDES REFS A AND B, PROVIDES AMPLIFYING DETAILS OF TASKS ORDERED IN REFS C THROUGH I, AND MUST BE READ IN THE CONTEXT OF THOSE REFERENCES. THIS MESSAGE PROVIDES THE SPECIFIC AUTHORIZATION AND GUIDANCE TO COMPLETE TASKS IN SUPPORT OF OPERATIONS WITHIN THE

1

Page 2: Master HA CM Summary Message Draft 07APR11 1100

DRAFTHUMANITARIAN ASSISTANCE AND CONSEQUENCE MANAGEMENT MISSIONS OF OPERATION TOMODACHI.1.A. THE HABITUAL MILITARY-TO-MILITARY (MIL-TO-MIL) RELATIONSHIPS BETWEEN JAPAN AND THE U.S. ENHANCES EXECUTION OF OPERATION TOMODACHI. HOWEVER, DUE TO THE NATURE OF RELIEF AND CONSEQUENCE MANAGEMENT OPERATIONS, JSF MUST SPECIFICALLY AUTHORIZE MANY ACTIONS THAT WOULD TYPICALLY FALL UNDER THE AUTHORITY OF SUBORDINATE COMMANDERS EXECUTING APPROVED CONOPS IAW MISSION ORDERS.1.A.1. REQUIREMENTS GENERATED BY GOJ AND DIRECT MIL-TO-MIL REQUESTS FOR ASSISTANCE MUST BE VALIDATED AND APPROVED BY THE JRRB IAW REF J.1.A.2. OPERATIONS EXECUTED UNDER OPERATION TOMODACHI AUTHORITIES MUST BE APPROVED BY THE JSF. THE JECB IS THE PRIMARY VENUE FOR APPROVING OPERATIONAL EFFECTS. 1.A.3. COMMANDERS RETAIN THE AUTHORITY TO EXECUTE ROUTINE COMREL AND OUTREACH EVENTS UNDER EXISTING THEATER AND SECURITY COOPERATION GUIDANCE. SUCH MISSIONS MAY BE CONDUCTED WITHOUT JSF APPROVAL OR FUNDING.1.B. MILITARY OPERATIONS CONDUCTED IN SUPPORT OF HA AND CM TO JAPAN WILL ONLY BE CONDUCTED IN ACCORDANCE WITH THE FOLLOWING PROCESS:1.B.1. A REQUEST FOR ASSISTANCE (RFA) FROM THE GOVERNMENT OF JAPAN (GOJ) OR JAPANESE SELF DEFENSE FORCE (JSDF) IS SUBMITTED TO THE JSF VIA EITHER THE JAPANESE JOINT STAFF (JJS) OR THE BILATERAL CRISIS ACTION TEAM (BCAT).1.B.2. UPON ENTRY TO THE JSF HQ, THE RFA SHALL BE ROUTED TO THE JOINT LOGISTICS OPERATIONS CENTER (JLOC) FOR TRACKING.1.B.3. HA REQUESTS WILL BE VALIDATED BY A USAID REPRESENTATIVE. IF DETERMINED TO BE A VALID HA REQUEST, IT WILL BE ASSIGNED A USAID/OFDA DOD MISSION TASKING MATRIX (MITAM) NUMBER.1.B.4. THE REQUEST WILL THEN BE REVIEWED BY A COMBINED JOINT EFFECTS COORDINATION BOARD (JECB) / JOINT REQUIREMENTS REVIEW BOARD (JRRB).1.B.5. IF APPROVED BY THE JECB/JRRB:1.B.5.A. JSF J3 WILL ISSUE NECESSARY OPERATIONAL TASKING VIA CONSOLIDATED TASKING ORDER.1.B.5.B. JSF J4 WILL COORDINATE NECESSARY LOGISTICS SUPPORT VIA STANDARD LOGISTICS PROCESSES. 2. CONSOLIDATED TASKING ORDER STRUCTURE. 2.A. THIS CONSOLIDATED ORDER TERMINATES ACTIONS (DIRECTED BY FRAGO OR PRIOR JSF TASK) THAT ARE COMPLETE AND REPLACES REMAINING ACTIVE FRAGOS WITH SERIALIZED JSF TASKS.2.B. CHANGES (TERMINATING, MODIFYING, OR ISSUING TASKS) WILL BE VIA DAILY UPDATE TO THIS ORDER. DAILY UPDATE WILL BE TRANSMITTED JUST AFTER DIMS RELEASE. DAILY UPDATE WILL NOT BE TRANSMITTED IF NO CHANGES ARE REQUIRED.2.C. NO LESS THAN ONCE A WEEK A NEW CONSOLIDATED TASKING ORDER WILL BE RELEASED, SUPERSEDING ALL PREVIOUS CONSOLIDATED HA, CM, AND JSDF SUPPORT MESSAGES AND DAILY UPDATES.--------------------------------------------------------------------------3. COMPLETED ACTIONS.3.A. THE FOLLOWING FRAGOS AND THEIR MODS ARE COMPLETED AND/OR CLOSED; NO FURTHER ACTION ISO OF THEIR TASKING IS AUTHORIZED. FRAGO 001 THRU 004 FRAGO 006 THRU 008 FRAGO 010 THRU 040 FRAGO 042 THRU 056 FRAGO 058 THRU 068 FRAGO 070 THRU 075 FRAGO 078 THRU 079 FRAGO 082 THRU 092

2

Page 3: Master HA CM Summary Message Draft 07APR11 1100

DRAFTFRAGO 095 THRU 100 FRAGO 102 THRU 104 FRAGO 107 THRU 110 FRAGO 114 THRU 115 FRAGO 118 THRU 120 3.B. THE FOLLOWING JSF TASKS ARE COMPLETE, NO FURTHER ACTION IS AUTHORIZED.JSF-004JSF-007JSF-011JSF-013JSF-014JSF-0163.C. IF AN ABOVE FRAGO OR TASK IS LISTED AS COMPLETE IN ERROR CONTACT THE JSF CAT CHIEF IMMEDIATELY. -----------------------------------------------------------------------4. PREVIOUSLY APPROVED HUMANITARIAN ASSISTANCE(HA), CONSEQUENCE MANAGEMENT(CM), AND JSDF SUPPORT TASKS:4.A. SERIAL: JSF-0014.A.1. PRIORITY: HIGH4.A.2. MISSION. CONDUCT HARBOR CLEARANCE AND PORT OPENING OPERATIONS IN NE HONSHU4.A.3. LEAD COMPONENT: JFMCC4.A.4. CONOPS. CONDUCT HARBOR CLEARANCE AND PORT OPENING OPERATIONS IN NE HONSHU TO ENABLE INITIAL OPERATING CAPABILITY (IOC) AT SELECTED PORTS. FOR THE PURPOSES OF THIS TASK, IOC SHALL MEAN THE PORT IS ABLE TO SAFELY RECEIVE, UNLOAD, AND SEND OFF SHIPS CARRYING ESSENTIAL GOODS.4.A.4.A. DIRECTLY COORDINATE WITH HN LOCAL AUTHORITIES TO ENSURE THE OPERATIONS TO CLEAR PORTS IS APPROVED.4.A.4.B. AS REQUESTED BY HN AND AS FEASIBLE, REMOVE OBSTRUCTIONS THAT RESTRICT PORTS' CRITICAL CAPABILITIES4.A.4.C. LIMIT OPERATIONS TO THE FOLLOWING APPROVED PORTS: 4.A.4.C.1. HACHINOHE (JFMCC MISSION COMPLETE)4.A.4.C.2. MIYAKO (JFMCC MISSION COMPLETE)4.A.4.C.3. OSHIMA4.A.5. TASKS.4.A.5.A. JFMCC: ASSIGN MISSION LEAD FOR PORT OPENING AND HARBOR CLEARANCE MISSION AND DIRECT COMMANDER TO: 4.A.5.A.1. ASSUME TACON OF ALL FORCES REQUIRED TO ACCOMPLISH TASK4.A.5.A.2. SUBMIT RFFS FOR ADDITIONAL FORCES REQUIRED4.A.5.A.3. ESTABLISH AFLOAT FORWARD STAGING BASE IF REQUIRED4.A.5.A.4. MINIMIZE IMPACT TO HN AND US INSTALLATIONS4.A.5.A.5. MAINTAIN POSITIVE COMMUNICATIONS WITH HIGHER AND ADJACENT COMMANDERS4.A.5.B. JSF / USFJ: ENSURE SUPPORT FOR SALVAGE OPERATIONS AND PORT OPENING IS PROVIDED THROUGH COORDINATION WITH ASSIGNED MISSION COMMANDER, LOCAL GOVERNMENTS, AND LOCAL INSTALLATION COMMANDERS4.A.6. COORDINATING INSTRUCTIONS.4.A.6.A. DIRLAUTH WITH OTHER UNITS OPERATING IN THE AREA.4.A.6.B. LIAISE WITH HN LOCAL AUTHORITIES TO ENSURE THEY CONCUR WITH OPERATIONS TO CLEAR PORTS AND LOCAL PRIORITIES ARE ADDRESSED.4.A.6.C. UTILIZE AVAILABLE FORCES TO SURVEY AND ASSESS PORT OBSTRUCTIONS. AVAILABLE FORCES INCLUDE AN AMPHIBIOUS SHIP (AS AFSB), EODMU FIVE HQ AND PLATOONS, MDSU ONE COMPANIES IN C7F AOR, T-ARS SALVAGE SHIP, C7F ASSIGNED SHIPS NOT ALREADY ENGAGED IN HADR MISSIONS, HELICOPTER ASSETS ON AN AS NEEDED BASIS.4.A.6.D. OTHER FORCES MAY BE REQUESTED THROUGH RFF PROCESS IF NOT AVAILABLE WITHIN C7F

3

Page 4: Master HA CM Summary Message Draft 07APR11 1100

DRAFT4.A.6.E. IF UNABLE TO COMPLETE THIS TASK, NOTIFY JSF CAT CHIEF. ADDITIONAL SUPPORT MAY BE PROVIDED, UPON REQUEST, IF NEEDED AND BASED UPON MISSION ANALYSIS AT USFJ.4.A.7. REPORTING REQUIREMENTS: REPORT STATUS OF THIS MISSION TO USFJ-CAT-CHIEF DAILY NLT 1100I AND COMPLETION (AT EACH PORT) NLT 2 HRS AFTER COMPLETE. DSN: 315-225-2469, EMAIL: [email protected]. START DATE: 261147Z MAR 11 4.A.9. END DATE: UPON LISTED PORTS REOPENING, OR TRANSITION OF MISSION TO GOJ.4.A.10. EXECUTION STATUS: IN PROGRESS.--------------------------------------------------------------------------4.B. SERIAL: JSF-002 4.B.1. PRIORITY: LOW4.B.2. MISSION: PROVIDE USFJ INSTALLATION ACCESS ID CARDS TO NON-DOD PERSONNEL IN SUPPORT OF OPERATION TOMODACHI.4.B.3. LEAD COMPONENT: CDR USARJ, CDR USAFJ, CDR CNFJ, CDR MARFORJ, CDR III MEF. 4.B.4. CONOPS: PROVIDE USFJ INSTALLATION ACCESS TO NON-DOD PERSONNEL SUPPORT OPERATION TOMODACHI.4.B.5. TASKS: SERVICE COMPONENTS: FOR INSTALLATIONS THAT HAVE CAPABILITY OF GENERATING DBIDS IDENTIFICATION CARDS, PROVIDE DBIDS GENERATED ID CARDS TO NON-DOD PERSONNEL SUPPORTING OPERATION TOMODACHI. ALL USFJ INSTALLATIONS WILL ACCEPT THIS CARD AS VALID IDENTIFICATION FOR INSTALLATION ACCESS.4.B.6. COORDINATING INSTRUCTIONS: PASS AND ID SECTION. PHONE NUMBER IS DSN 225-7510; CURRENT HOURS OF OPERATIONS ARE 0730-1500; COORDINATE WITH MPS CUSTOMER SERVICE FOR ADDITIONAL TIMES WHEN ID CARD CAN BE ISSUED.4.B.7. REPORTING REQUIREMENTS: REPORT STATUS OF THIS FRAGO TO USFJ-CAT-CHIEF UPON COMPLETION. DSN 225-2469 EMAIL [email protected]. START DATE: 181816Z MAR 11. 4.B.9. END DATE: CEASE MISSION UPON TERMINATION OF OPERATION TOMODACHI. USAR-J: COMPLETED.4.B.10. EXECUTION STATUS: IN PROGRESS.--------------------------------------------------------------------------4.C. SERIAL: JSF-003 4.C.1. PRIORITY: MEDIUM4.C.2. MISSION: RECEIVE AND BED DOWN ONE (1) KING AIR 200 IN SUPPORT OF OPERATION TOMODACHI.4.C.3. LEAD COMPONENT: JFACC 4.C.4. CONOPS: RECEIVE AND BED DOWN ONE (1) GOOGLE AIR IMAGERY SYSTEM KING AIR 200 (SIMILAR TO C-12) AT YOKOTA AIR BASE UNTIL MISSION COMPLETION.4.C.5. TASKS:4.C.5.A. 374TH AW: RECEIVE AND PROVIDE BED DOWN SUPPORT FOR ONE (1) GOOGLE AIR IMAGERY SYSTEM KING AIR 200 (SIMILAR TO C-12) AT YOKOTA AIR BASE4.C.5.B. USAFJ: WORK CLEARANCE AND ENROUTE SUPPORT REQUIREMENTS4.C.5.C. USAFJ/A3/A4: WORK AIRCRAFT REQUIREMENTS FOR PARKING AND MAINTENANCE WITH 374TH AW4.C.5.D. USAFJ/A1: WORK LODGING SUPPORT FOR FOUR (4) AIRCREW MEMBERS WITH 374TH AW.4.C.6. COORDINATING INSTRUCTIONS: NONE4.C.7. REPORTING REQUIREMENTS: REPORT STATUS OF THIS FRAGO TO USFJ-CAT-CHIEF UPON COMPLETION. DSN 225-2469 EMAIL: [email protected]. START DATE: 200148Z MAR 11 4.C.9. END DATE: UPON TERMINATION OF OPERATION TOMODACHI. 4.C.10. EXECUTION STATUS:IN PROGRESS--------------------------------------------------------------------------4.D. SERIAL: JSF-005 4.D.1. PRIORITY: MEDIUM

4

Page 5: Master HA CM Summary Message Draft 07APR11 1100

DRAFT4.D.2. MISSION: DISTRIBUTE WATER ON BEHALF OF MINISTRY OF AGRICULTURE, FORESTRY, AND FISHERY (MAFF). 4.D.3. LEAD COMPONENT: J4 (JLOC) IN COORDINATION WITH JFACC 4.D.4. CONOPS: SUPPLIES WILL BE DELIVERED TO YOKOTA AB, PREPARED FOR FURTHER TRANSPORT, AND STORED UNTIL MAFF IS ABLE TO RECEIVE AND DISTRIBUTE. DELIVERY, AND FLOWN TO DESIGNATED AREAS IN NORTHERN JAPAN IN SUPPORT OF OPERATION TOMODACHI.4.D.5. TASKS: USAFJ, JFACC4.D.5.A. YOKOTA AB WILL RECEIVE APPROXIMATELY 10,000 CASES OF WATER (550ML BOTTLES) ON 210 PALLETS. THE SIZE OF PALLETS IS APPROXIMATELY 900MM X 1100MM X 1500MM.4.D.5.B. THE ITEMS IN THE ABOVE PARAGRAPH REQUIRE PREPARATION FOR DELIVERY VIA GROUND OR AIR TRANSPORT. 4.D.5.C. USAFJ AND JFACC SHALL LIAISON WITH POCS BELOW TO COORDINATE RECEIPT AND DELIVERY OF SUPPLIES TO YOKOTA AB AS WELL AS COORDINATE THE RECEIPT AND OFFLOAD OF SUPPLIES FROM AIRCRAFT AT FINAL DESTINATION.4.D.6. COORDINATING INSTRUCTIONS:4.D.6.A. THE DESTINATION OF AIR DELIVERY IS FUKUSHIMA/SENDAI AIRPORT.4.D.6.B. DIRLAUTH. 4.D.6.B.1. POC FOR WATER SHIPMENT TO YOKOTA IS MR. SATOSHI FUKUDA AT JAPAN COMMERCIAL 03-5579-1133 OR 080-1026-6583 (CELL).4.D.6.B.2. POC FOR RECEIPT OF SUPPLIES AT FUKISHIMA AIRPORT IS: FUKUSHIMA PREFECTURE, DISASTER RELIEF HEADQUARTERS, MR. KANNO 024-521-19124.D.6.B.3. JGSDF POC TO COORDINATE AND RECEIVE SUPPLIES AT FUKUSHIMA AIRPORT IS MAJ TSUBAKIHARA DSN 263-9970/9971/99724.D.6.B.4. POC MAJ COOK OR MAJ MATUSAK DSN 225-4329, [email protected]. REPORTING REQUIREMENTS: REPORT STATUS OF WATER DELIVERY AND STORAGE TO USFJ-CAT-CHIEF DAILY NLT 1100 AND NLT 2 HRS AFTER COMPLETE. DSN 225-2469 EMAIL [email protected]. START DATE: 230149Z MAR 11 4.D.9. END DATE: UPON TERMINATION OF OPERATION TOMODACHI4.D.10. EXECUTION STATUS: OPEN-------------------------------------------------------------------------- 4.E. SERIAL: JSF-006 4.E.1. PRIORITY: HIGH4.E.2. MISSION. US FORCES ISSUE FUEL TO JSDF AND OTHER AUTHORIZED GOJ ENTITIES AND TRACK EXPENSES FOR REIMBURSEMENT THROUGH OHDACA DURING EXECUTION OF OPERATION TOMODACHI.4.E.3. LEAD COMPONENT: JFLCC, JFMCC, JFACC AND JFSOCC.4.E.4. CONOPS. FUNCTIONAL COMPONENTS WILL COORDINATE WITH JSDF FOR THE PLACEMENT OF GROUND REFUELING POINTS IN AFFECTED AREAS OF THE AOR TO PROVIDE FUEL TO THE JSDF AND OTHER AUTHORIZED GOJ ENTITIES IN SUPPORT OF OPERATION TOMODACHI.4.E.5. TASKS:4.E.5.A.1. USFJ: SUB-AREA PETROLEUM OFFICER-JAPAN (SAPO-J), THROUGH DLA ENERGY, SHALL COORDINATE FOR REQUIRED STOCK AT DESIGNATED LOCATIONS.4.E.5.A.2. JFLCC: JFLCC WILL COORDINATE CONCEPT OF FUEL RESUPPLY WITH U.S. FORCES AND JSDF FOR THE PLACEMENT OF REFUELING POINTS IN AFFECTED AREAS OF THE AOR. THIS COORDINATION WILL INCLUDE THE SPECIFIC PICK UP LOCATIONS FROM TACTICAL FUEL POINTS OR DLA DEFENSE FUEL SUPPORT POINTS (I.E. GAS STATIONS, FUEL TERMINALS, AND TRUCK LOADING TERMINALS), AND/OR OTHER LOCATIONS WITH STORAGE AND DISTRIBUTION CAPABILITY.4.E.5.A.3. JFLCC/JFACC/JFSOCC: MAINTAIN LOGS OF FUEL RECIPIENTS TO BILL BACK AGAINST OHDACA.4.E.6. COORDINATING INSTRUCTIONS:4.E.6.A.1. RESPONSIBLE ORGANIZATIONS WILL ENSURE ALL TRANSACTION DOCUMENTS PERTAINING TO FUEL FOR HUMANITARIAN ASSISTANCE ARE MARKED WITH THE PROJECT

5

Page 6: Master HA CM Summary Message Draft 07APR11 1100

DRAFTCODE "3JU" AND ELEMENTS PERFORMING HUMANITARIAN FUEL SUPPORT MISSIONS AND OPERATIONS WILL FOLLOW THE PROCEDURES FOR MAINTAINING LOGS OF FUEL RECIPIENTS. 4.E.6.A.2. CURRENT AUTHORIZATION AND RESTRICTIONS: HUMANITARIAN ASSISTANCE IS CURRENTLY AUTHORIZED IN THE QUANTITY OF UP TO 250,000 GALLONS OF DIESEL AND 250,000 GALLONS GASOLINE FROM DFSP MISAWA (MISAWA AB). GASOLINE IS RESTRICTED TO A MAXIMUM OF 5,000 GALLONS PER DAY FOR HUMANITARIAN ASSISTANCE OPERATIONS.4.E.6.A.3. JFLCC FUEL BEING DELIVERED TO DISTRIBUTION TERMINALS WILL BE CHARGED TO THE JFLCC ORGANIZATION HANDLING THE SITE. 4.E.6.A.4. JFSOCC FUEL BEING DELIVERED TO DISTRIBUTION TERMINALS WILL BE CHARGED TP THE JFSOCC ORGANIZATION HANDLING THE SITE. 4.E.6.B. DIRLAUTH ALCON. POCS: LT COL TOBY DYER, DSN: 315-225-2610, EMAIL: [email protected] OR [email protected], MR. VICTOR MADARIS, DSN: 315-225-4706, EMAIL: [email protected] OR [email protected]. SUBORDINATE UNITS WILL BE PREPARED TO PROVIDE AVAILABLE ASSETS AND RESOURCES TO JFLCC UPON REQUEST TO SUPPORT THESE CONOPS. 4.E.6.D. FUEL BEING ISSUED / DISPENSED FOR HUMANITARIAN ASSISTANCE OPERATIONS DIRECTLY INTO JSDF AND / OR CIVILIAN ASSETS AT DFSP MISAWA (MISAWA AB) WILL BE CHARGED TO THE JFACC ORGANIZATION HANDLING THE TRANSACTION.4.E.7. REPORTING REQUIREMENTS. PROVIDED SEPCOR.4.E.8. START DATE: 220749Z MAR 11.4.E.9. END DATE: UPON TERMINATION OF OPERATION TOMODACHI.4.E.10. EXECUTION STATUS: IN PROGRESS.--------------------------------------------------------------------------4.F. SERIAL: JSF-008 4.F.1. PRIORITY: MEDIUM4.F.2. MISSION: USAFJ PROVIDES GENERATORS TO MCGUIRE CRG ISO AERIAL PORT OPERATIONS AT SENDAI.4.F.3. LEAD COMPONENT: USAFJ.4.F.4. CONOPS: PROVIDE TWO (2) GENERATORS TO MCGUIRE CONTINGENCY READINESS TEAM (CRG) TO SUPPORT AERIAL PORT OPERATIONS AT SENDAI.4.F.5. TASKS: USAFJ. 4.F.5.A.1. PROVIDE TWO (2) THREE KILOWATT GENERATORS TO THE MCGUIRE CRG AT SENDAI AIRPORT TO SUPPORT AERIAL PORT OPERATIONS.4.F.6. COORDINATING INSTRUCTIONS: POC FOR THIS ORDER IS MSGT CHAD BALDINI, 13 AF DET 1/A4, EMAIL: [email protected], DSN: 315-225-4173/4453.4.F.7. REPORTING REQUIREMENTS: REPORT STATUS OF THIS FRAGO TO USFJ-CAT-CHIEF NLT 2 HRS AFTER COMPLETE. DSN 225-2469 EMAIL [email protected]. START DATE: 250215Z MAR 11.4.F.9. END DATE: UPON JFLCC DETERMINATION SUPPORT NO LONGER REQUIRED.4.F.10. EXECUTION STATUS: IN PROGRESS. GENERATORS CURRENTLY IN PLACE MCGUIRE.--------------------------------------------------------------------------4.G. SERIAL: JSF-009 4.G.1. PRIORITY: MEDIUM4.G.2. MISSION: USAFJ SUPPORTS WATER DISTRIBUTION AT SENDAI. 4.G.3. LEAD COMPONENT: JFACC.4.G.4. CONOPS: PROVIDE WATER DISTRIBUTION PERSONNEL AND TRUCKS TO SENDAI WITH CAPABILITY OF HOLDING A MINIMUM OF 2,000 GALLONS OF WATER.4.G.5. TASKS:4.G.5.A. USAFJ:4.G.5.A.1. SOURCE WATER TRUCKS CAPABLE OF HOLDING AND DISTRIBUTING A MINIMUM OF 2,000 GALLONS OF WATER AND PREPARE FOR AIR SHIPMENT.4.G.5.A.2. DEPLOY PERSONNEL CAPABLE OF OPERATING WATER DISTRIBUTION TRUCKS TO PERFORM 24 HOUR OPERATIONS WORKING 12 HOUR SHIFTS AT SENDAI.4.G.6. COORDINATING INSTRUCTIONS: DIRLAUTH ALCON. POC AT YOKOTA IS MAJ SAMUEL LEE, DSN: 315-225-6453, EMAIL: [email protected]. POC AT SENDAI IS MAJ LARRY WARFIELD, DSN: 315-263-9963, EMAIL: [email protected].

6

Page 7: Master HA CM Summary Message Draft 07APR11 1100

DRAFT4.G.7. REPORTING REQUIREMENTS: REPORT STATUS OF THIS FRAGO TO USFJ-CAT-CHIEF DAILY NLT 2 HRS AFTER COMPLETION. DSN 225-2469 EMAIL [email protected]. START DATE: 260345Z MAR 11.4.G.9. END DATE: UPON JFLCC DETERMINATION SUPPORT NO LONGER REQUIRED.4.G.10. EXECUTION STATUS: IN PROGRESS. TRUCKS / PERSONNEL IN PLACE SENDAI.--------------------------------------------------------------------------4.H. SERIAL: JSF-010 4.H.1. PRIORITY: HIGH.4.H.2. MISSION: JFACC CONDUCTS FUELING OPERATIONS AT SENDAI.4.H.3. LEAD COMPONENT: JFACC.4.H.4. CONOPS: PROVIDE FUEL PERSONNEL TO SUPPORT AND MAINTAIN THE GROUND FUEL SITE AT SENDAI. 4.H.5. TASKS: JFACC 4.H.5.A. SOURCE AND PROVIDE TWO (2) GROUND FUELS PERSONNEL (AFSC 2F0X1) TO SUPPORT AND MAINTAIN THE GROUND FUEL SITE AT SENDAI.4.H.5.B. PERSONNEL REQUIRED BY 28 MARCH FOR A TWENTY (20) DAY DURATION.4.H.5.C. PERSONNEL NEED TO BRING ALL TOOLS AND PPE REQUIRED FOR GROUND FUEL OPERATIONS TO INCLUDED HAZDECS AND LOAD PLANS FOR 500 GALLON FUEL BLIVETS (SEALED DRUMS).4.H.5.D. PERSONNEL WILL SUPPORT THE SOG AND WILL RETURN WITH THE ESTABLISHED ROTATION OF THE FUEL BLIVETS.4.H.5.E. ON ORDER, PERSONNEL WILL PREPARE EQUIPMENT FOR FOLLOW ON MOVEMENT.4.H.6. COORDINATING INSTRUCTIONS: DIRLAUTH ALCON. POC IS SMSGT CHRISTOPHER PATTON, 225-5821, [email protected]. 4.H.7. REPORTING REQUIREMENTS: REPORT STATUS OF THIS FRAGO TO USFJ-CAT-CHIEF DAILY NLT 2 HRS AFTER COMPLETION. DSN 225-2469 EMAIL [email protected]. START DATE: 281230Z MAR 11.4.H.9. END DATE: UPON JFLCC DETERMINATION SUPPORT NO LONGER REQUIRED.4.H.10. EXECUTION STATUS: IN PROGRESS. PERSONNEL IN PLACE SENDAI.--------------------------------------------------------------------------4.I. SERIAL: JSF-012 4.I.1. PRIORITY: LOW4.I.2. MISSION: JSF CONDUCTS DEBRIS REMOVAL FROM PORT FACILITIES ON OSHIMA ISLAND.4.I.3. LEAD COMPONENT: JFMCC4.I.4. CONOPS: JFMCC DEPLOYS SUITABLE PERSONNEL IVO OSHIMA ISLAND PORT (GRID 54S WJ 5305 0193) TO CONDUCT DEBRIS CLEARANCE OPERATIONS IOT FACILITATE THE LOCAL GOVERNMENTS CONTINUED CLEARANCE AND RECONSTRUCTION OPERATIONS ON OSHIMA ISLAND. 4.I.4.A. THE USFJ HAST ESTIMATES THAT THE CUTTING, CLEARING, AND HAULING OF DEBRIS FROM THE PORT AREA WOULD TAKE APPROXIMATELY 7-10 DAYS FOR A 40 - 60 MAN WORK FORCE. 4.I.4.B. JTF-TH HAS DIRECTED JGSDF TO WORK WITH THE LOCAL GOVERNMENT FOR PROCUREMENT OF HEAVY EQUIPMENT SUPPORT. US HEAVY EQUIPMENT ASSETS HAVE NOT BEEN REQUESTED TO AID IN CLEARANCE OPERATIONS.4.I.4.C. AUGMENTATION OF PERSONNEL TO ASSIST WITH THE OPENING OF SCHOOLS ABOARD OSHIMA ISLAND IN ACCORDANCE WITH THE DESIRED ENDSTATE OF OPERATION FIELD DAY MAY BE CONDUCTED IAW PARA 1.B OF THIS ORDER.4.I.5. TASKS: 4.I.5.A. JFMCC: NLT 01 APRIL 2011, DEPLOY SUITABLE PERSONNEL AND EQUIPMENT TO OSHIMA ISLAND TO COMPLETE DEBRIS REMOVAL OPERATIONS IVO OSHIMA ISLAND PORT. 4.I.5.B. JFLCC: NLT 31 MAR, CONDUCT A HAST SURVEY TO DOCUMENT THE CURRENT SITUATION OF THE OSHIMA PORT IN ORDER TO PROVIDE GUIDANCE AND SITE IMAGERY FOR THE JFMCC DEBRIS CLEARANCE TEAM. COORDINATE WITH JGSDF PERSONNEL AS REQUIRED FOR HEAVY EQUIPMENT SUPPORT TO AUGMENT DEBRIS CLEARANCE OPERATIONS BASED ON IDENTIFIED REQUIREMENTS. (NOTE: HAST SURVEY COMPLETE)4.I.6. COORDINATING INSTRUCTIONS:

7

Page 8: Master HA CM Summary Message Draft 07APR11 1100

DRAFT4.I.6.A. DIRLAUTH.4.I.6.B. MISSION PROPOSED BY COL FUJIOKA, COMMANDING OFFICER, 41ST REGIMENT, 4TH DIVISION AND IS APPROVED BY JTF-TH.4.I.6.C. POCS ARE: JSF-J FWD J3 CELL: LTCOL ROHR, USMC, DSN (315) 263-9907, EMAIL: [email protected]; MAJ SCHOENMAKER, USMC, DSN (315) 236-9907, CELL 080-1385-7134, EMAIL: [email protected]; OR 31ST MEU OPERATIONS OFFICER, LTCOL MONTI, USMC, DSN (315) 453-5854, EMAIL [email protected]. REPORTING REQUIREMENTS: 4.I.7.A. JFMCC, JFLCC - ACKNOWLEDGE RECEIPT.4.I.7.B. REPORT MISSION COMMENCEMENT AND STATUS UPDATES WITHIN NORMAL SITREP REPORTING.4.I.8. START DATE: 31 MAR 11.4.I.9. END DATE: NLT 09 APR 11.4.I.10. EXECUTION STATUS: IN PROGRESS.-------------------------------------------------------------------------4.J. SERIAL:JSF-0154.J.1. PRIORITY: MEDIUM4.J.2. MISSION: TRANSPORT A 5-PERSON HUMANITARIAN ASSESSMENT TEAM FROM HARDY BARRACKS TO ISHINOMAKI (JSDF BASE). 4.J.3. LEAD COMPONENT: JFACC4.J.4. CONOPS: PICK UP 5 WORLD FOOD PROGRAM REPRESENTATIVES FROM HARDY BARRACKS AT 0800 ON 06 APRIL 11 FOR TRANSPORT TO ISHINOMAKI (JSDF BASE). REMAIN AT ISHINOMAKI FOR 3 HRS, RTB 1100. 4.J.5. TASKS: JFACC 4.J.5.A. COORDINATE ROUND TRIP ROTARY WING TRANSPORT FOR 5 PAX FROM HARDY BARRACKS TO ISHINOMAKI.4.J.6. COORDINATING INSTRUCTIONS:4.J.6.A. JFACC CONTACT USAID FOR WFP TEAM PICK-UP AND DETAILS. POCS: SEBASTIAN RHODES STAMPA, 080-3175-0107; YONI BOCK OR TOM FREY ON THE BJOCC WATCH FLOOR. 4.J.6.B. USAID PROVIDE PASSENGER MANIFEST (NAMES, WEIGHTS, AND BAGGAGE) TO JFACC AS SOON AS POSSIBLE.4.J.6.C. WORLD FOOD PROGRAM REPRESENTATIVES WILL MEET LOCAL MUNICIPALITY OFFICIALS AND VOLUNTEER GROUPS TO DISCUSS THE LEVEL OF LOGISTICS ASSISTANCE REQUIRED.4.J.6.D. JSF J4 (JLOC) WILL LEAD TRANSPORTATION COORDINATION TO OPTIMIZE LIFT AND RESOURCES AND AVOID REDUNDANCY.4.J.7. REPORTING REQUIREMENTS: JFACC REPORT MISSION START AND MISSION COMPLETION TO USFJ-CAT-CHIEF.4.J.8. START DATE:06APR114.J.9. END DATE: 06APR114.J.10. EXECUTION STATUS: APPROVED. PENDING.-------------------------------------------------------------------------4.K. SERIAL: JSF-0174.K.1. PRIORITY: MEDIUM4.K.2. MISSION: JSF SUPPORTS GOJ PUBLIC HEALTH OPERATIONS WITH MEDICATIONS AND MEDICAL SUPPLIES4.K.3. LEAD COMPONENT: JFLCC4.K.4. CONOPS: JFLCC TRANSFERS CUSTODY OF REQUESTED MEDICAL SUPPLIES AND MEDICATIONS TO THE MIYAGI PREFECTURAL GOVERNMENT. THESE ITEMS WILL BE UTILIZED BY MOBILE MEDICAL TEAMS FROM THE JAPANESE RED CROSS, PREFECTURAL DMAT TEAMS, AND JGSDF MEDICAL IN A TEMPORARY CLINIC IN MINAMI-SANRIKA CHO VICINITY.4.K.5. TASKS: JFLCC:

8

Page 9: Master HA CM Summary Message Draft 07APR11 1100

DRAFT4.K.5.A. PREPARE REQUESTED MEDICAL SUPPLIES AND MEDICATIONS FOR ONWARD MOVEMENT.4.K.5.B. COORDINATE WITH THE JGSDF FOR THE TRANSFER OF GOODS TO THE MIYAGI PREFECTURAL GOVERNMENT.4.K.5.C. PROVIDE GROUND TRANSPORT AS NECESSARY.4.K.5.D. JFACC: PROVIDE AIR TRANSPORT OF MEDICAL SUPPLIES IF NECESSARY.4.K.5.E. III MEF: PROVIDE REQUESTED SUPPLIES / MEDICATIONS.4.K.5.F. JSF JLOC: COORDINATE TRANSPORTATION SUPPORT.4.K.6. COORDINATING INSTRUCTIONS: MEDICAL SUPPLIES AND MEDICATIONS SHALL BE SOURCED FROM INTERAGENCY EMERGENCY HEALTH KIT (FORMERLY KNOWN AS “WHO KIT”). SPECIFIC LIST HAS BEEN PROVIDED SEPCOR.4.K.6.A. UTILIZE MOST EFFICIENT TRANSPORTATION AVAILABLE WITHIN MISSION TIMELINE CONSTRAINTS.4.K.7. REPORTING REQUIREMENTS: REPORT MISSION STATUS AND COMPLETION WITHIN DAILY SITREP. REPORT MISSION DELAYS BY EXCEPTION.4.K.8. START DATE: 06 APR 11 4.K.9. END DATE: 06 APR 11 OR MISSION COMPLETION.4.K.10. EXECUTION STATUS: APPROVED -------------------------------------------------------------------------5. THE FOLLOWING TASKS REPLACE OPEN FRAGOS AS OF THIS ORDER.5.A. SERIAL: JSF-018 (REPLACES FRAGO 05)5.A.1. PRIORITY: HIGH5.A.2. MISSION: SUPPORT TO AERIAL MEASURING SYSTEM (AMS) TEAM. 5.A.3. LEAD COMPONENT: JFACC5.A.4. CONOPS: PROVIDE AERIAL SUPPORT TO AMS TEAM.5.A.5. TASKS:JFACC SUPPORT AMS TEAM LOCATED YOKOTA AB. 5.A.5.A. PROVIDE ONE (1) EACH UH-1 AND C-12 AIRCRAFT AT 0900 HOURS AND ONE (1) HH-60 AIRCRAFT AT 1000 HOURS FOR AERIAL MEASUREMENT OPERATIONS. 5.A.6. COORDINATING INSTRUCTIONS: JFACC5.A.6.A. EXPECT TO CONDUCT AERIAL MEASUREMENTS IN VICINITY OF FUKUSHIMA REACTORS, SENDAI, YOKOSUKA NAVY BASE, NAF ATSUGI, AND CAMP ZAMA.5.A.6.B. PROVIDE DAILY SUPPORT TO AMS TEAM THROUGH 19 APRIL 20115.A.6.C. DIRLAUTH ALCON. 5.A.6.D. COORDINATE WITH NNSA/AMS TEAM FOR SPECIFICS 5.A.7. REPORTING REQUIREMENTS: REPORT SUPPORT MISSIONS TO THE CAT CHIEF BY THE MOST EXPEDITIOUS MEANS POSSIBLE. 5.A.8. START DATE: 22 MAR 11 5.A.9. END DATE: UNTIL COMPLETION OF OPERATION TOMODACHI5.A.10. EXECUTION STATUS: IN PROGRESS-------------------------------------------------------------------------5.B. SERIAL: JSF-019 (REPLACES FRAGO 69 THRU MOD 1 AND 77 THRU MOD 2)5.B.1. PRIORITY: MEDIUM5.B.2. MISSION: DISTRIBUTE POTASSIUM IODIDE (KI) TO ALL DOD PERSONNEL, DEPENDENTS, MASTER LABOR CONTRACT (MLC) EMPLOYEES, AND INDIRECT HIRE AGREEMENT (IHA) EMPLOYEES WITHIN 200 MILES FROM THE FUKUSHIMA POWER PLANT.5.B.3. LEAD COMPONENT: USARJ/USAFJ/CNFJ/JFMCC/JFLCC/JFACC/MARFORJ 5.B.4. CONOPS: COMPLY WITH PACOM MSG GUIDANCE ON POTASSIUM IODINE (KI) DISTRIBUTION (DTG 210315ZMAR11). ISSUE KI TABLETS WITH APPROPRIATE WARNINGS AND DIRECTIONS. RECORD ISSUANCE AND MAKE EXPEDITOUS PROGRESS REPORTS TO USFJ-RADIATION CONSEQUENCE MANAGEMENT TEAM AND USFJ-CAT-CHIEF5.B.5. TASKS: USARJ/USAFJ/CNFJ/JFMCC/JFLCC/JFACC/MARFORJ 5.B.5.A. ALL DOD PERSONNEL, DEPENDENTS, MLC, AND IHA EMPLOYEES WITHIN 200 MILES OF THE FUKUSHIMA POWER PLANT WILL BE DISTRIBUTED ONE HALF PACKET (7 PILLS) OF POTASSIUM IODIDE (KI). IF SUPPLY IS NOT ADEQUATE TO PROVIDE ONE

9

Page 10: Master HA CM Summary Message Draft 07APR11 1100

DRAFTHALF PACKET PER PERSON, ISSUE ONE QUARTER PACKET (3 OR 4 PILLS) PER PERSON. IF UNABLE TO COMPLY, CONTACT USFJ IMMEDIATELY FOR FURTHER ISSUING OF KI PACKETS. 5.B.5.B. PROVIDE GUIDANCE ON KI PILL USE TO ALL RECEIVING PERSONNEL AS DESCRIBED IN COORDINATING INSTRUCTIONS.5.B.5.C. 100 PERCENT KI ISSUANCE MUST BE COMPLETED BY 000L 25 MAR 11.5.B.5.D. COMPONENT SURGEONS AND MTF COMMANDERS DESIGNATE A KI REPORTING OFFICER FOR EACH AFFECTED UNIT, MTF OR BRANCH CLINIC: SEND NAME, PHONE NUMBER AND EMAIL ADDRESS THROUGH [email protected] ASAP BUT NLT 1600I 22 MARCH 20115.B.6. COORDINATING INSTRUCTIONS:5.B.6.A. THE ORDER TO TAKE POTASSIUM IODIDE (KI) WILL BE GIVEN BY USFJ THROUGH SERVICE COMPONENTS VIA ALL AVAILABLE MEANS OF MASS COMMUNICATION INCLUDING NEWS OUTLETS, AND SOCIAL MEDIA. IN ORDER TO RECEIVE ACCURATE AND TIMELY COMMUNICATION, IT IS STRONGLY RECOMMENDED THAT ALL DOD PERSONNEL AND DEPENDENTS IN THE AFFECTED REGIONS PAY ATTENTION TO COMMUNICATION CHANNELS.5.B.6.B. THE GUIDANCE FOR TAKING POTASSIUM IODIDE (KI), DOSAGE REQUIREMENTS, AND SHELTERING IN PLACE GUIDANCE SHALL BE AS FOLLOWS:5.B.6.B.1. THE FIRST TABLET SHOULD BE TAKEN 1-8 HOURS BEFORE THE RADIOACTIVE PLUME ARRIVES AT YOUR LOCATION.5.B.6.B.2. AFTER THE POTASSIUM IODIDE TABLET IS TAKEN, SHELTER IN PLACE AS DIRECTED BY LOCAL AUTHORITIES. SHELTERING IN PLACE INVOLVES CLOSING ALL WINDOWS AND DOORS, SEALING ANY PLACE THAT AIR COULD ENTER THE HOME, SHUTTING OFF THE AIR CONDITIONER TO AVOID DRAWING AIR FROM THE OUTSIDE INTO THE HOME, AND AVOID OUTSIDE ACTIVITIES.5.B.6.B.3. THE DAILY DOSE EVERY 24 HOURS IS ONE TABLET OF 130 MG FOR ADULTS, 65 MG (HALF A TABLET) FOR CHILDREN AGES 3-18, 32 MG (ONE QUARTER TABLET) FOR INFANTS AGES 1 MONTH-3 YEARS, AND 16 MG (AN EIGHTH OF A TABLET) FOR CHILDREN UNDER 1 MONTH OLD.5.B.6.B.4. LACTATING AND PREGNANT FEMALES SHOULD FOLLOW GUIDANCE FROM THEIR PRIMARY CARE PROVIDER.5.B.6.B.5. ADMINISTRATION OF POTASSIUM IODIDE SHOULD BE STOPPED AFTER SHELTER-IN-PLACE IS TERMINATED, POST-EVACUATION OR DIRECTED BY HIGHER AUTHORITY.5.B.6.C. REPORT ANY ADVERSE REACTIONS FROM PATIENTS WHO HAVE TAKEN KI.5.B.6.D. COMPONENT SURGEONS AND MTF COMMANDERS ENSURE PERSONNEL RECEIVE KI INFORMATION SHEET AND HAVE READ SCREENING QUESTIONNAIRE.5.B.6.E. INSTRUCTIONS AND DOSAGE INFORMATION MUST BE AVAILABLE IN ENGLISH AND JAPANESE. JAPANESE LANGUAGE INSTRUCTION/DOSAGE INFORMATION WILL BE PROVIDED THROUGH SURGEON CHANNELS. 5.B.6.F. ACCEPTANCE BY CIVILIAN EMPLOYEES IS VOLUNTARY. ADMINISTRATIVE LEAVE TIME IS AUTHORIZED TO PICK UP TABLETS. 5.B.6.G. IF ADDITIONAL KI TABLETS ARE NEEDED TO COVER THIS TASK, PROVIDE REQUIREMENTS TO USFJ-CAT-MEDICAL. 5.B.7. POC FOR THIS REQUIREMENT IS LT RUDY MEDINA, USN, AND CAPT ANDREW MATTERN, USAF, USFJ SURGEON’S OFFICE AT [email protected], DSN 225-6702/2228. USFJ-RADIATION CONSEQUENCE MANAGEMENT TEAM, ENS LEE ALLEMAN, [email protected], DSN 225-4712. 5.B.7.A. REPORTING REQUIREMENTS: 5.B.7.A.1. REPORTING OFFICER MUST SUBMIT A STATUS REPORT TWICE DAILY BY 0200L (COVERING 1200L THROUGH 0000L) AND 1400L (COVERING 0000L THROUGH 1200L) THROUGH [email protected]. REPORTING MUST INCLUDE USFJ-CAT-MEDICAL SPREADSHEET. CONTACT USFJ-CAT-MEDICAL FOR SPREADSHEET COPIES.

10

Page 11: Master HA CM Summary Message Draft 07APR11 1100

DRAFT5.B.7.B. UNITS REPORT COMPLETION OF ISSUANCE THROUGH [email protected], INCLUDE THE FOLLOWING INFORMATION ON EMAIL REPORT:5.B.7.B.1. NAME OF UNIT, MTF OR BRANCH CLINIC.5.B.7.B.2. NUMBER OF TROOPS OR PATIENT POPULATION.5.B.7.B.3. NUMBER OF PERSONNEL WHO HAVE RECEIVED KI TO DATE.5.B.7.B.4. REMAINING NUMBER OF KI TABLETS ON HAND.5.B.7.B.5. REMARKS: INCLUDE THE NUMBER OF TABLETS ISSUED PER PATIENT, EXPECTED ISSUANCE COMPLETION DATE, PROBLEMS ENCOUNTERED, PLANS OF ACTION AND OTHER APPLICABLE COMMENTS, TRACK BY NAME PERSONS WHO ACCEPTED THE KI TABLETS. 5.B.7.C. REPORT STATUS OF THIS FRAGO TO USFJ-CAT-CHIEF DAILY NLT 1200 HRS AND COMPLETION NLT 2 HRS AFTER COMPLETE. DSN 225-2469 EMAIL [email protected]. START DATE: 21 MAR 115.B.9. END DATE: UPON COMPLETION OF OPERATION TOMODACHI5.B.10. EXECUTION STATUS: IN PROGRESS-------------------------------------------------------------------------5.C. SERIAL: JSF-020 (REPLACES FRAGO 76)5.C.1. PRIORITY: HIGH5.C.2. MISSION: ALL JFLCC COMPONENTS CONDUCTING DOSE RATE AND CUMULATIVE DOSE MONITORING REPORT MONITOR/SURVEY RESULTS TO THE JFLCC AND RCMT.5.C.3. LEAD COMPONENT: JFLCC5.C.4. CONOPS: EFFECTIVE IMMEDIATELY, ALL JFLCC COMPONENTS CONDUCTING DOSE RATE AND CUMULATIVE DOSE MONITORING WILL REPORT MONITOR/SURVEY RESULTS TO THE JFLCC AND RCMT.5.C.5. TASKS: 5.C.5.A. JFLCC WILL SERVE AS THE RADIOLOGICAL COP MANAGER FOR CDR USFJ AND WILL PUBLISH COP INFORMATION DAILY. 5.C.5.B. ALL JFLCC COMPONENTS WILL REPORT CURRENT DOSE RATE AND TOTAL CUMULATIVE DOSE EVERY SIX HOURS WHILE STATIONARY AND RECORD EVERY THIRTY MINUTES WHILE TRAVELING IN THE AFFECTED AREA OF OPERATION. UPON COMPLETION OF TRAVEL THROUGH AO REPORT READINGS AS DESCRIBED IN COORDINATING INSTRUCTIONS.5.C.6. COORDINATING INSTRUCTIONS: 5.C.6.A. MONITORING MAY BE CONDUCTED UTILIZING THE AN/PDR-77, AN/UDR-13, THE INDENTIFINDER FROM THE ACM SUITE OR THE SERVICE EQUIVALENT. REPORT ANY INCREASE OF.001 REM/HR OR HIGHER AND VALIDATE WITH SECOND READING ON A DIFFERENT PIECE OF GEAR. 5.C.6.B. DIRLAUTH ALCON. 5.C.6.C. POC IS THE JFLCC CBRN OFFICER, CWO2 CHRISTOPHER KAMM AT DSN 315-225-6456, [email protected]. ALL END USER PRODUCTS WILL BE PUBLISHED ON THE FOLLOWING WEBSITE LOCATION: HTTPS://PORTAL.IIIMEF.USMC.MIL/OPERATIONS/HA/DEFAULT.ASPX5.C.7. REPORTING REQUIREMENTS:5.C.7.A. REQUIRED DATA NEEDS TO BE IN THE FOLLOWING FORMAT: MEASUREMENT DATE / MEASUREMENT TYPE / RAW VALUE / MEASUREMENT UNIT / MEASURE TAKEN BY / LATITUDE / LONGITUDE. 5.C.7.B. REPORT INFORMATION DIRECTLY TO [email protected] AND [email protected]. IF EMAIL CAPABILITY IS NOT AVAILABLE CALL RCMT AT DSN 315-225-2303 AND THE JFLCC AT DSN 315-225-6456.5.C.7.C. CBRN TEAMS AT SENDAI, YAMAGATA, AND MATSUSHIMA WILL REPORT ALL READINGS TO 3RD MEB FOR ROLLUP AND REPORTING TO THE JFLCC AND THE RCMT. CBRN TEAMS AT YOKOTA, IWAKUNI, AND ATSUGI WILL REPORT TO THE JFLCC AND THE RCMT DIRECTLY.

11

Page 12: Master HA CM Summary Message Draft 07APR11 1100

DRAFT5.C.7.D. REPORT STATUS OF THIS FRAGO TO USFJ-CAT-CHIEF DAILY NLT 1200 HRS AND COMPLETION NLT 2 HRS AFTER COMPLETE. DSN 225-2469 EMAIL [email protected]. START DATE: 22 MAR 11 5.C.9. END DATE: UPON COMPLETION OF OPERATION TOMODACHI.5.C.10. EXECUTION STATUS: IN PROGRESS.-------------------------------------------------------------------------5.D. SERIAL: JSF-021 (REPLACES FRAGO 93)5.D.1. PRIORITY: MEDIUM5.D.2. MISSION: TRANSPORTATION SUPPORT TO U.S. DEPARTMENT OF ENERGY (DOE) SURVEY TEAMS5.D.3. LEAD COMPONENT: CDR, 13TH AF5.D.4. CONOPS: PROVIDE GROUND TRANSPORTATION FOR U.S. DOE RADIOLOGICAL GROUND SURVEY MISSIONS.5.D.5. TASKS: PROVIDE FOUR (4) 4WD VEHICLES AND 4 DRIVERS TO ASSIST U.S. DOE IN CONDUCTING DAILY RADIOLOGICAL GROUND SURVEY MISSIONS.5.D.6. COORDINATING INSTRUCTIONS: 5.D.6.A. OPERATIONS BEGAN IN THE FUKUSHIMA AREA 25 MARCH 2011 (0800I-2000I)5.D.6.B. U.S. DOE WILL PROVIDE REQUIRED DOSIMETER COVERAGE5.D.6.C. DRIVERS MUST BRING AND BE TRAINED ON REQUIRED PPE5.D.6.D. VEHICLES WILL NEED TO TRANSPORT 2-MAN SURVEY TEAMS WITH RADIOLOGICAL SURVEY GEAR AND 2 ICE CHESTS/COOLERS5.D.6.E. VEHICLES NEED TO HAVE SUFFICIENT FUEL CANS (FILLED) TO DRIVE TO FUKUSHIMA AND RETURN. 5.D.6.F. DIRLAUTH ALCON. POC FOR U.S. DOE IS DR BLUMENTHAL AT (702) 427-7331 OR DR GUSS AT (702) 374-9868, [email protected]. 13TH AF POC IS MAJ LONG AT DSN 225-5151/5327, EMAIL [email protected]. REPORTING REQUIREMENTS: REPORT STATUS OF THIS FRAGO TO USFJ-CAT-CHIEF DAILY NLT 1200 HRS AND COMPLETION NLT 2 HRS AFTER COMPLETE. DSN 225-2469 EMAIL [email protected]. START DATE: 24 MAR 115.D.9. END DATE: 08 APR 11 (TENTATIVELY)5.D.10. EXECUTION STATUS: IN PROGRESS-------------------------------------------------------------------------5.E. SERIAL: JSF-022 (REPLACES FRAGO 101)5.E.1. PRIORITY: MEDIUM5.E.2. MISSION: TECHNICIANS DELIVER DOSIMETERS AND PICKUP AIR/SOIL/WATER SAMPLES.5.E.3. LEAD COMPONENT: USAFJ 5.E.4. CONOPS: SUPPORT RADIATION HEALTH MONITORING. TECHNICIANS WILL FLY TO ONE SITE EVERYDAY TO DELIVER DOSIMETERS AND RETRIEVE SOIL, AIR, AND WATER SAMPLES FOR ANALYSIS5.E.5. TASKS: FLY FOUR TECHNICIANS FROM YOKOTA AB TO ONE SITE EACH DAY. THIS TEAM WILL REQUIRE FOUR HOURS ON THE GROUND, AND WILL RETURN THE SAME DAY. 5.E.6. COORDINATING INSTRUCTIONS: 5.E.6.A. FIRST DESTINATION FOR THIS FRAGO WAS SENDAI (MARCH 25). REPORT MODIFICATIONS TO THIS TASK EACH DAY FOR DIFFERENT DESTINATIONS, TO USFJ-CAT-CHIEF DSN 225-2469 EMAIL [email protected]. MEMBERS MUST BRING THEIR OWN PPE IN CASE THEY HAVE TO RON. 5.E.6.C. TEAM WILL CARRY SIX (6) PELICAN CASES OF EQUIPMENT WEIGHING SIXTY (60) POUNDS EACH. 5.E.6.D. DIRLAUTH ALCON.

12

Page 13: Master HA CM Summary Message Draft 07APR11 1100

DRAFT5.E.6.E. POCS FOR THIS TASK ARE CAPT LANE OR CAPT FERRERI, 225-4712. EMAIL ADDRESS IS [email protected]. REPORTING REQUIREMENTS: REPORT STATUS OF THIS FRAGO TO USFJ-CAT-CHIEF DAILY NLT 1200 HRS AND COMPLETION NLT 2 HRS AFTER COMPLETE. DSN 225-2469 EMAIL [email protected]. START DATE: 25 MAR 11 5.E.9. END DATE: UPON COMPLETION OF OPERATION TOMODACHI5.E.10. EXECUTION STATUS: IN PROGRESS-------------------------------------------------------------------------5.F. SERIAL: JSF-023 (REPLACES FRAGO 105)5.F.1. PRIORITY: MEDIUM5.F.2. MISSION: ENHANCED RADIOLOGICAL SURVEILLANCE AND OCCUPATIONAL / ENVIRONMENTAL HEALTH SITE ASSESSMENTS OF INSTALLATIONS AND CAMPS.5.F.3. LEAD COMPONENT: USARJ/JFLCC5.F.4. CONOPS: PERFORM ENHANCED RADIOLOGICAL SURVEILLANCE AND OCCUPATIONAL/ENVIRONMENTAL HEALTH SITE ASSESSMENTS OF INSTALLATIONS/CAMPS OCCUPIED OR SUPPORTED BY US FORCES AT NON-FIXED LOCATIONS. THIS INCLUDES, BUT IS NOT LIMITED TO: SENDAI AIRPORT, CAMP SENDAI, YAMAGATA AIRFIELD, CASUMINOME, AND MATSUSHIMA.5.F.5. TASKS:5.F.5.A. USARJ: PROVIDE ONE (1) PUBLIC HEALTH TEAM OF SUBJECT MATTER EXPERTS TO PERFORM ENHANCED RADIOLOGICAL SURVEILLANCE AND OCCUPATIONAL/ENVIRONMENTAL HEALTH SITE ASSESSMENTS (OEHS) OF NON FIXED LOCATIONS/CAMPS OCCUPIED BY U.S. FORCES. PERFORM OEHS IAW DODI 6490.035.F.5.B. JFLCC: PROVIDE TRANSPORTATION AND LIFE SUPPORT FOR ONE (1) PUBLIC HEALTH TEAM TO CONDUCT SURVEILLANCE.5.F.6. COORDINATING INSTRUCTIONS: 5.F.6.A. SPECIALIZED REQUIREMENTS: TEAM MUST DEPLOY WITH ENHANCED ENVIRONMENTAL RADIOLOGICAL AND ENVIRONMENTAL SURVEILLANCE EQUIPMENT AND SUPPLIES TO PERFORM DETAILED AIR, WATER, AND SOIL ANALYSIS AND RISK CHARACTERIZATION.5.F.6.B. TEAM AUTHORIZED 400LBS WEIGHT FOR SPECIALIZED EQUIPMENT IN ADDITION TO PAX AND PERSONAL EQUIPMENT. SUPPORT FOR THIS REQUEST FOR FORCES WAS PREVIOUSLY COORDINATED WITH PUBLIC HEALTH COMMAND REGION-PACIFIC, CAMP ZAMA, JAPAN.5.F.6.C. DIRLAUTH WITH JFLCC SURGEON FOR MISSION COORDINATION. 5.F.6.D. BASE OF OPERATION WILL BE CAMP SENDAI. 5.F.6.E. DATE REQUIRED IS 261400IMAR2011. 5.F.6.F. ORIGINAL MISSION DURATION ESTIMATE WAS SEVEN DAYS.5.F.6.G. POCS FOR THIS ORDER ARE MAJ AMY KING AND MAJ LEWIS LONG, AT [email protected], DSN 225-2228/4712.5.F.6.H. ENSURE ALL REPORTS ARE ARCHIVED IAW 9460.03. 5.F.7. REPORTING REQUIREMENTS:5.F.7.A. REPORT IMMINENT HEALTH HAZARDS TO USFJ-CAT-MEDICAL AT DSN 225-2228/4712 IMMEDIATELY. 5.F.7.B. PROVIDE DRAFT AND FINAL REPORTS AS SOON AS AVAILABLE TO [email protected]. 5.F.7.C. REPORT STATUS OF THIS FRAGO TO USFJ-CAT-CHIEF DAILY NLT 1200 HRS AND COMPLETION NLT 2 HRS AFTER COMPLETE. DSN 225-2469 EMAIL [email protected]. START DATE: 25 MAR 115.F.9. END DATE: UPON COMPLETION OF OPERATION TOMODACHI5.F.10. EXECUTION STATUS: IN PROGRESS-------------------------------------------------------------------------

13

Page 14: Master HA CM Summary Message Draft 07APR11 1100

DRAFT5.G. SERIAL: JSF-024 (REPLACES FRAGO 111)5.G.1. PRIORITY: MEDIUM5.G.2. MISSION: OPERATION PACIFIC PASSAGE (VAD) PHASE III PLANNING SUPPORT5.G.3. LEAD COMPONENT: JFACC; CNFJ, USARJ, MCBJ 5.G.4. CONOPS: PLANNERS REPRESENTING THE FOLLOWING INSTALLATIONS: YOKOTA AB, FLEET ACTIVITIES YOKOSUKA, NAF ATSUGI, CAMP ZAMA, MISAWA AB, MCAS IWAKUNI, KADENA AB, AND CAMP BUTLER PARTICIPATE IN JTF-505 PLANNING EFFORTS FOR OPERATION PACIFIC PASSAGE.5.G.5. TASKS: JFACC, CNFJ, USARJ, MCBJ:5.G.5.A. PROVIDE PLANNERS FROM YOKOTA, YOKOSUKA, ATSUGI, ZAMA, MISAWA, IWAKUNI, KADENA, AND BUTLER TO PARTICIPATE IN JTF-505’S PLANNING TEAM.5.G.6. COORDINATING INSTRUCTIONS: 5.G.6.A. JTF-505’S JOINT PLANNING CELL IN OKINAWA IS CONDUCTING OPERATIONAL PLANNING FOR PHASE III (ORDERED DEPARTURE). THE FOCUS OF THIS EFFORT IS ON THROUGHPUT AND PROCESSING AMCITS AND OTHER EVACUEES FROM LOCATIONS THROUGHOUT THE TOKYO METROPOLITAN AREA AND HONSHU TO ASSEMBLY AREAS, ECCS, APOES, INTERMEDIATE BASES, AND SAFE HAVENS. A LARGE PART OF THIS EFFORT WILL BE CONDUCTED BY THE BASES AND STATIONS. FORMAL AND INFORMAL COORDINATION IS ONGOING, HOWEVER, THERE IS A NEED TO DIRECTLY INCORPORATE EACH BASE AND STATION INTO THE PLANNING EFFORT. 5.G.6.B. DIRLAUTH ALCON. JTF-505 FUOPS PLANNER: MAJ JUAREZ, DSN 315-622-3426. JOINT RECEPTION CENTER AND PRE-ARRIVAL POC: LTCOL MILLER DSN 315-622-75.G.7. REPORTING REQUIREMENTS: REPORT STATUS OF THIS FRAGO TO USFJ-CAT-CHIEF DAILY NLT 1200 HRS AND COMPLETION NLT 2 HRS AFTER COMPLETE. DSN 225-2469 EMAIL [email protected]. START DATE: 26 MAR 11 5.G.9. END DATE: UPON COMPLETION OF OPERATION PACIFIC PASSAGE.5.G.10. EXECUTION STATUS: IN PROGRESS-------------------------------------------------------------------------5.H. SERIAL: JSF-025 (REPLACES FRAGO 112 THRU MOD 1, 64, AND 92)5.H.1. PRIORITY: MEDIUM 5.H.2. MISSION: WATER SAMPLING AT U.S. INSTALLATIONS LOCATED ON HONSHU.5.H.3. LEAD COMPONENT: JFACC, JFLCC, JFMCC, JFSOCC 5.H.4. CONOPS: 2 DAILY WATER SAMPLES WILL BE COLLECTED AT ALL U.S. INSTALLATIONS ON HONSHU UNTIL OTHERWISE DIRECTED BY COMMANDER JOINT SUPPORT FORCE (COMJSF). ONE SAMPLE WILL BE SENT TO YOKOTA AIR BASE FOR PRESUMPTIVE TESTING, AND THE OTHER SAMPLE SENT VIA EXPEDITED DELIVERY TO SERVICE SPECIFIED LABORATORIES FOR CONFIRMATORY TESTING.5.H.5. TASKS: JFACC, JFLCC, JFMCC, JFSOCC: DAILY WATER SAMPLES WILL BE COLLECTED AND SENT FOR TESTING FROM ALL U.S. INSTALLATIONS ON HONSHU UNTIL OTHERWISE DIRECTED BY COMMANDER JOINT SUPPORT FORCE (COMJSF). 5.H.6. COORDINATING INSTRUCTIONS: 5.H.6.A. AT A MINIMUM, DUPLICATE (TWO) SAMPLES WILL BE COLLECTED FROM EACH DISCRETE SOURCE AND SUBMITTED AS FOLLOWS: 5.H.6.A.1. ONE SAMPLE WILL BE SENT TO YOKOTA AIR BASE FOR PRESUMPTIVE TESTING. 5.H.6.A.2. SAMPLES SUBMITTED TO YOKOTA AIR BASE WILL BE COLLECTED IN ONE LITER PLASTIC CONTAINERS WITH NO PRESERVATIVES. 5.H.6.B. SUBMIT SAMPLES TO YOKOTA AIR BASE TO ONE OF THE FOLLOWING ADDRESSES: MILITARY ADDRESS: FM5202, 374 MDSS/SGSM, UNIT 5225 BLDG 4145D, APO AP 96328. COMMERCIAL ADDRESS: 374TH MEDICAL LOGISTICS, BLDG 4145D, FUSSA-SHI, TOKYO, JAPAN 197-0001.

14

Page 15: Master HA CM Summary Message Draft 07APR11 1100

DRAFT5.H.6.C. THE SECOND SAMPLE WILL BE SENT VIA EXPEDITED DELIVERY (EXAMPLE DHL OR FEDEX) TO SERVICE SPECIFIED LABORATORIES FOR CONFIRMATORY TESTING. NAVY COMPONENT SAMPLES WILL BE SENT TO: USAFSAM/OEHHL, 365 THIRD ST. BLDG 674C, WRIGHT-PATTERSON AFB, OH 45433-7212. 5.H.6.D. SAMPLES SUBMITTED TO THE SUPPORTING SERVICE LABORATORY WILL BE IN ACCORDANCE WITH THAT LABORATORY’S GUIDANCE FOR CONTAINER TYPE, PRESERVATION AND VOLUME. 5.H.6.E. SAMPLES WILL BE SUBMITTED WITH THE DATE AND TIME OF COLLECTION, COLLECTOR’S NAME, SOURCE NAME AND THE NAME OF THE INSTALLATION AND SUB INSTALLATION TO WHICH THE WATER IS A SOURCE.5.H.6.F. DIRLAUTH ALCON. JSF POCS FOR THIS TASK ARE MAJ AMY KING AND MAJ LEWIS LONG AT [email protected], DSN 225-2228.5.H.7. REPORTING REQUIREMENTS: 5.H.7.A. PRESUMPTIVE SAMPLE RESULTS WILL BE ROUTED THROUGH JSFJ CAT-MEDICAL ([email protected]) TO THE APPROPRIATE INSTALLATION PUBLIC HEATLH/ENVIRONMENTAL HEALTH OFFICIALS. 5.H.7.A.1. CONFIRMATORY TEST RESULTS BE SENT TO JSFJ CAT-MEDICAL FROM THE SUPPORTING SERVICE LABORATORY AS SOON AS AVAILABLE.5.H.7.B. REPORT STATUS OF THIS FRAGO TO USFJ-CAT-CHIEF DAILY NLT 2 HRS AFTER COMPLETION. DSN 225-2469 EMAIL [email protected]. START DATE: 26 MAR 115.H.9. END DATE: UPON COMPLETION OF OPERATION TOMODACHI.5.H.10. EXECUTION STATUS: IN PROGRESS-------------------------------------------------------------------------5.I. SERIAL: JSF-026 (REPLACES FRAGO 117)5.I.1. PRIORITY: LOW5.I.2. MISSION: COMPONENTS MAINTAIN PLANS FOR CONTINGENCY WATER CONSERVATION.5.I.3. LEAD COMPONENT: USAFJ/CNFJ/USARJ/MARFORJ 5.I.4. CONOPS: COMPONENTS GENERATE CONTINGENCY WATER CONSERVATION PLAN WITH MEASURES TO TAKE IN RESPONSE TO CRITICAL WATER SHORTAGES.5.I.5. TASKS: USAFJ, CNFJ, USARJ, MARFORJ.5.I.5.A. PROVIDE WATER CONSERVATION PLANS FOR ALL INSTALLATIONS IN THE TOKYO CAPITAL REGION (KANTO PLAIN), AND THE PREFECTURES OF KANAGAWA, AICHI, CHIBA, FUKUSHIMA, GUNMA, IBARAKI, IWATE, MIYAGI, NAGANO, NIIGATA, SAITAMA, SHIZOUKA, TOCHIGI, TOKYO, YAMAGATA, AOMORI, AKITA, AND YAMANASHI JAPAN. 5.I.6. COORDINATING INSTRUCTIONS: 5.I.6.A. CONTINGENCY WATER CONSERVATION PLANS MUST OUTLINE ACTIONS EACH BASE WILL TAKE IOT MEET MINIMUM CONSUMPTION REQUIREMENTS OF BASE POPULATION, IF RESTRICTED USE OF CITY WATER IS DIRECTED. (PLANNING FACTOR SHOULD BE FIVE (5) DAY SUPPLY).5.I.6.B. DIRLAUTH ALCON: POC IS MAJ GEORGE MATUSAK, JSF J4, [email protected], DSN 225-4715/4712.5.I.7. REPORTING REQUIREMENTS: 5.I.7.A. ANY CHANGES TO PLAN OR USFJ/JSF SUPPORT REQUIRED TO THE JSF J4 ENGINEERS VIA MOST EXPEDITIOUS METHOD AVAILABLE, OR BY EMAIL TO [email protected] AND [email protected]. REPORT STATUS OF CONTINGENCY PLAN WITHIN DAILY SITREP.5.I.8. START DATE: 29 MAR 11 5.I.9. END DATE: UPON COMPLETION OF OPERATION TOMODACHI5.I.10. EXECUTION STATUS: IN PROGRESS-------------------------------------------------------------------------5.J. SERIAL: JSF-027 (REPLACES FRAGO 122, 17, 71)

15

Page 16: Master HA CM Summary Message Draft 07APR11 1100

DRAFT5.J.1. PRIORITY: MEDIUM5.J.2. MISSION: AIR AND AMBIENT DOSE MONITORING.5.J.3. LEAD COMPONENT: JFLCC, JFMCC, JFSOCC, USARJ, USAFJ, CNFJ, MARFORJ 5.J.4. CONOPS: JSF WILL REDUCE THE REQUIRED AMOUNT OF AIR AND AMBIENT MONITORING TO TWICE A DAY. COMPONENTS WILL CONDUCT SAMPLING AT LEAST 8 HOURS APART AT ALL U.S. INSTALLATIONS AND FIELD LOCATIONS IN THE AFFECTED AREAS.5.J.4.A. TASKS: JFLCC, JFMCC, JFSOCC, JFACC 5.J.4.B. COMPONENTS WILL TAKE AIR AND AMBIENT ENVIRONMENT DOSE RATE READINGS AT ALL U.S. INSTALLATIONS AND FIELD LOCATIONS IN THE FOLLOWING AREAS AND PREFECTURES: TOKYO CAPITAL REGION, AKITA, AICHI, AOMORI, CHIBA, FUKUSHIMA, GUNMA, IBARAKI, IWATE, KANAGAWA, MIYAGI, NAGANO, NIIGATA, SAITAMA, SHIZOUKA, TOCHIGI, TOKYO, YAMAGATA, AND YAMANASHI.5.J.4.C. SAMPLING WILL BE CONDUCTED TWICE A DAY, AT LEAST 8 HOURS APART.5.J.5. COORDINATING INSTRUCTIONS: 5.J.5.A. AMBIENT RADIATION READINGS WILL BE PERFORMED USING A BETA/GAMMA PROBE AND RESULTS REPORTED IN MREM PER HOUR (MR/HR). 5.J.5.B. THE AMBIENT RADIATION REPORT FORMAT MUST INCLUDE: DATE, TIME, LOCATION, INSTRUMENT UTILIZED, PROBE TYPE, READING NUMBER, BETA/GAMMA READING EXPOSURE RATE (MR/HR), GAMMA READING EXPOSURE RATE (MR/HR), AND NAME OF THE INDIVIDUAL TAKING THE READING.5.J.5.C. AIR MONITORING WILL BE PERFORMED USING A HIGH VOLUME AIR SAMPLING PUMP WITH A MINIMUM OF 1000 CUBIC FEET (28,316 LITERS) OF SAMPLED AIR.5.J.5.D. THE AIR RADIATION MONITORING REPORT WILL BE REPORTED IN MICRO-CURIES PER MILLILITER OR COUNTS PER MINUTE PER MILLILITER. 5.J.5.E. THE AIR RADIATION MONITORING REPORT FORMAT MUST INCLUDE: DATE, TIME, LOCATION, INSTRUMENT UTILIZED, READING NUMBER, FILTER TYPE, FILTER SIZE, FLOW RATE, TOTAL TIME, TOTAL VOLUME, NUCLIDE, UNITS (CPM/ML), UNITS (UCI/ML), UNCERTAINTY, NAME OF INDIVIDUAL TAKING THE READING. 5.J.5.F. NOTE THAT COUNTING MUST BE PERFORMED NO SOONER THAN 4 HOURS AFTER THE SAMPLE WAS TAKEN TO ALLOW FOR RADON GAS DECAY/EVAPORATION. 5.J.5.G. USE CHARCOAL FILTERS TO COLLECT I-131 SAMPLES IF CAPABILITY IS AVAILABLE.5.J.5.H. PROVIDE A KNOWLEDGEABLE POC AND PHONE NUMBER WITH EACH REPORT.5.J.5.I. DIRLAUTH ALCON: POC FOR THIS ORDER IS LCDR PEDRO GONZALEZ OR LTJG CALVIN WAREN, [email protected], DSN (315) 225-4712 5.J.6. REPORTING REQUIREMENTS: ALL RESULTS WILL BE REPORTED TWICE A DAY NLT 0300I AND 1500I TO [email protected]. 5.J.6.A. REPORT RECEIPT OF THIS FRAGO TO USFJ-CAT-CHIEF UPON RECEIPT. DSN 315-225-2469, EMAIL: [email protected]. START DATE: 31 MAR 11 5.J.8. END DATE: UPON COMPLETION OF OPERATION TOMODACHI5.J.9. EXECUTION STATUS: IN PROGRESS-------------------------------------------------------------------------5.K. SERIAL: JSF-028 (REPLACES FRAGO 94 THRU MOD 1)5.K.1. PRIORITY: MEDIUM5.K.2. MISSION: PROVIDE BASE OPERATING SUPPORT TO AIR FORCE RADIATION ASSESSMENT TEAM (AFRAT) FOR ITS RADIO-CHEMICAL LABORATORY.5.K.3. LEAD COMPONENT: JFACC/JFLCC5.K.4. CONOPS: PROVIDE POWER GENERATORS AND ASSOCIATED EQUIPMENT FOR AFRAT LABORATORY. 5.K.5. TASKS:

16

Page 17: Master HA CM Summary Message Draft 07APR11 1100

DRAFT5.K.5.A. JFACC PROVIDE ON YOKOTA AFB, BLDG 1503, 3 GENERATORS (60 KW); 15 TWENTY-FOOT POWER SUPPLY CABLES, 4 CABLE ADAPTERS, 25 OUTLETS, AND GASOLINE TO SUPPORT EXTENDED 24/7 OPERATIONS.5.K.5.B. JFLCC BE PREPARED TO SUPPORT THE JFACC FOR UNFULFILLED REQUIREMENTS5.K.6. COORDINATING INSTRUCTIONS: 5.K.6.A. THE ITEMS IN THE ABOVE PARAGRAPH MAY REQUIRE PALLETIZATION AND PREPARATION IN ORDER TO BE DELIVERED VIA AIR TRANSPORT.5.K.6.B. COORDINATE AND LIAISON WITH POC FOR THE RECEIPT AND DELIVERY OF SUPPLIES.5.K.6.C. DIRLAUTH ALCON. POC IS CAPT LANE, USAF DSN 225-4712 OR BY EMAIL AT [email protected]. REPORTING REQUIREMENTS: REPORT STATUS OF THIS FRAGO TO USFJ-CAT-CHIEF DAILY NLT 1200 HRS AND COMPLETION NLT 2 HRS AFTER COMPLETE. DSN 225-2469 EMAIL [email protected]. START DATE: 24 MAR 11 5.K.9. END DATE: UNTIL COMPLETION OF AFRAT MISSION5.K.10. EXECUTION STATUS: IN PROGRESS-------------------------------------------------------------------------6. THE FOLLOWING NEW TASKS ARE APPROVED.6.A. SERIAL: JSF-XXX6.A.1. PRIORITY: MEDIUM6.A.2. MISSION:JSF/USFJ CONDUCTS A COMPREHENSIVE RADIOLOGICAL SURVEY OF INSTALLATIONS IN JAPAN.6.A.3. LEAD COMPONENTS: USARJ, CNRJ, USAFJ, MARFORJ 6.A.4. CONOPS: UNTIL FURTHER NOTICE, JSF CONDUCTS WEEKLY SAMPLING OF OPEN FRESH BODIES OF WATER, SAMPLING OF STORMWATER RUNOFF FOLLOWING RAIN, MONTHLY SAMPLING OF RADIOLOGICAL CONCENTRATORS IN GOVERNMENT VEHICLES AND A ONE-TIME SAMPLING OF FACILITIES IN ORDER TO PROVIDE EMPIRICAL AND HISTORICAL DATA REGARDING THE RADIOLOGICAL ENVIRONMENT OF US MILITARY INSTALLATIONS.6.A.5. TASKS: SERVICE COMPONENTS6.A.5.A. CONDUCT OPEN FRESH WATER BODY SAMPLING AS FOLLOWS:6.A.5.A.1. IF AN INSTALLATION HAS OPEN FRESH WATER BODIES (E.G., LAKE, POND, STREAM, WATER HAZARD, RESERVOIR), COLLECT A ONE LITER WATER SAMPLE FROM A REPRESENTATIVE CROSS SECTION OF EACH TYPE OF WATER BODY (NOT TO EXCEED THREE TOTAL SAMPLES). 6.A.5.A.2. EACH THURSDAY, COLLECT AN ADDITIONAL ONE LITER WATER SAMPLE FROM EACH OF THE WATER BODIES SAMPLED INITIALLY.6.A.5.B. CONDUCT STORMWATER RUNOFF SAMPLING AS FOLLOWS:6.A.5.B.1. BEGINNING WITH THE NEXT RAINFALL EVENT GREATER THAN 0.5 INCH (SEE BELOW FOR DEFINITION AND CALCULATIONS), IDENTIFY UP TO THREE LOW-LYING AREAS IN PUBLIC AREAS (E.G., EXCHANGE/COMMISSARY, SCHOOL, RESIDENTIAL, CHILD DEVELOPMENT CENTER) THAT ACCUMULATE RAIN WATER, AND COLLECT A ONE LITER SAMPLE FROM EACH AREA. 6.A.5.B.2. THEREAFTER, COLLECT AN ADDITIONAL ONE LITER STORMWATER SAMPLE FROM THE SAME THREE LOW LYING AREAS AFTER EACH SUBSEQUENT RAINFALL EVENT GREATER THAN 0.5 INCH, NOT TO EXCEED SIX TOTAL STORM WATER SAMPLES PER MONTH.6.A.5.B.3. TO QUALIFY AS A RAINFALLL EVENT, THE RAINFALL EVENT MUST BE PRECEDED BY AT LEAST 24 HOURS OF NO GREATER THAN TRACE PRECIPITATION AND HAVE AN INTENSITY OF AT LEAST 0.5 INCHES OF RAINFALL (DEPTH) IN A 24-HOUR PERIOD.

17

Page 18: Master HA CM Summary Message Draft 07APR11 1100

DRAFT6.A.5.B.4. SAMPLES SHOULD BE COLLECTED AS SOON AS POSSIBLE AFTER THE RAIN EVENT MEETS THE 0.5IN /24 HR CRITERIA AND COLLECTED IN A MANNER CONSISTENT WITH WATER AND WASTE WATER COLLECTION METHODS USING CAUTION NOT TO CONTAMINATE THE SAMPLE OR OVERLY STIR THE SOLID PARTICLES.6.A.5.C. CONDUCT VEHICLE SAMPLING AS FOLLOWS:6.A.5.C.1. TAKE RADIATION LEVEL SCANS OF THE AIR FILTER, VEHICLE WHEEL WELLS AND VEHICLE TIRE TREADS OF THREE INSTALLATION SECURITY FORCES (I.E. POLICE) VEHICLES THAT HAVE BEEN DRIVEN IN NORMAL OPERATION PRECEDING THE SURVEY.6.A.5.C.2. SCAN THE AIR FILTER, WHEEL WHEELS AND TIRE TREADS, MOVING THE PROBE AT A SPEED OF ONE PROBE WIDTH PER SECOND. NOTE THE HIGHEST READING OBSERVED, THEN CORRECT THIS READING BY SUBTRACTING THE BACKGOUND. THEN CONVERT THE CORRECTED COUNTS PER MINUTE (CPM) READING TO DISINTEGRATIONS PER MINUTE (DPM)/100 SQUARE CENTIMETERS (CM2) AS INDICATED BELOW. REPORT IAW COORDINATING INSTRUCTIONS.6.A.5.C.3. READINGS MAY BE ELEVATED CLOSE TO THE GROUND DUE NATURALLY OCCURRING RADIOACTIVE MATERIAL IN SOIL/CONCRETE SO SCAN FILTERS ON A TABLE OR BENCH AND ONLY SCAN THE TOP ONE HALF OF THE TIRE TREAD.6.A.5.C.4. ONE OF THE FOLLOWING RADIAC SETS WILL BE USED TO DETERMINE RADIATION LEVELS IN DISINTEGRATIONS PER MINUTE (DPM) FOR THE PURPOSE OF RADIOLOGICAL CONCENTRATORS: AN/PDR-77 WITH A PANCAKE PROBE (DT-695), ADM-300 WITH A PANCAKE PROBE (BP-100), OR AN AN/PDQ-1 OR EQUIVALENT WITH A FRISKER PROBE (DT-304) OR ANY NIST TRACEABLE CALIBRATED GM PACKCAKE PROBE OR EQUIVALENT. AS USED IN THIS MESSAGE, DPM MEANS THE RATE OF EMISSION BY RADIOACTIVE MATERIAL AS DETERMINED BY CORRECTING THE COUNTS PER MINUTE MEASURED BY AN APPROPRIATE DETECTOR FOR BACKGROUND, EFFICIENCY, AND GEOMETRIC FACTORS ASSOCIATED WITH THE INSTRUMENTATION. FOR THESE RADIACS AND DURING THIS OPERATION, USE A CONVERSION FACTOR OF TEN TO ACCOUNT FOR THE ABOVE FACTORS. FOR EXAMPLE, IF A RADIAC READS 100 COUNTS PER MINUTE, THIS EQUATES TO 1000 DPM/PROBE. THE METHOD FOR SURVEY IS AS FOLLOWS. TAKE AND RECORD A BACKGROUD MEASUREMENT WITH ABOVE METER/PROBE COMBINATION WITH DETECTOR FACE POINTING AWAY FROM SURVEYOR AT CHEST LEVEL.6.A.5.D. CONDUCT FACILITY SAMPLING AS FOLLOWS:6.A.5.D.1. PERFORM THIS SURVEY ONCE.6.A.5.D.2. SURVEY HVAC INTAKE AIR FILTERS ON THE FOLLOWING PRIMARY GATHERING FACILITY TYPES: FACILITIES WITH HIGH VOLUME AIR INTAKES (NOT TO EXCEED FIVE SUCH FACILITIES), HOSPITALS, SCHOOLS, CHILD DEVELOPMENT CENTERS, AND A REPRESENTATIVE SAMPLE OF FAMILY HOUSING (MINIMAL NUMBER OF UNITS THAT REPRESENT THE VARIOUS HVAC CONFIGURATIONS). 6.A.5.D.2.A. TAKE A DOSERATE (MILLIREM/HR) READING ON THE FILTER WITH IT IN PLACE. 6.A.5.D.2.B. IF THE HVAC INTAKE AIR FILTER DOSE RATE READINGS EXCEED THE INSTALLATION RADIOLOGICAL SAFETY STANDARDS, REPLACE THE FILTER IMMEDIATELY, TAKING CARE TO HANDLE, DOCUMENT, AND STORE IN ACCORDANCE WITH EXISTING INSTALLATION RADIOLOGICAL SAFETY STANDARDS. 6.A.5.D.3. ADDITIONALLY, WITHIN THE SAME FACILITY TYPES CONDUCT AN INDOOR AIR SAMPLE IAW JSF-027 (AIR AND AMBIENT DOSE MONITORING, ORIGINALLY TASKED IN FRAGO 122). 6.A.6. COORDINATING INSTRUCTIONS: 6.A.6.A. DIRLAUTH ALCON. 6.A.6.B. SAMPLING LOCATIONS: CONDUCT SAMPLING ABOARD U.S. INSTALLATIONS AND HOUSING AREAS WITH A RESIDENT POPULATION THAT INCLUDES DOD DEPENDENTS AND NEW SANNO HOTEL.

18

Page 19: Master HA CM Summary Message Draft 07APR11 1100

DRAFT6.A.6.C. WATER COLLECTION: ALL WATER SAMPLES WILL BE COLLECTED IN ONE LITER PLASTIC CONTAINERS WITH NO PRESERVATIVES. 6.A.6.D. SUBMIT ALL WATER SAMPLES TO YOKOTA AIR BASE TO ONE OF THE FOLLOWING ADDRESSES: MILITARY ADDRESS: FM5202, 374 MDSS/SGSM, UNIT 5225 BLDG 4145D, APO AP 96328. COMMERCIAL ADDRESS: 374TH MEDICAL LOGISTICS, BLDG 4145D, FUSSA-SHI, TOKYO, JAPAN 197-0001. ALL SAMPLES WILL BE SUBMITTED WITH THE DATE AND TIME OF COLLECTION, COLLECTOR’S NAME, SOURCE NAME, NAME OF THE INSTALLATION AND SUB INSTALLATION FROM WHICH THE SAMPLE WAS COLLECTED, AND FOR STORMWATER SAMPLES ONLY, THE NUMBER OF DRY DAYS BEFORE THE SAMPLE WAS COLLECTED.6.A.6.E. INCLUDE THE FOLLOWING DATA IN VEHICLE REPORTS (FORMATTED TABLE AVAILABLE FROM POC):6.A.6.E.1. SURVEYOR6.A.6.E.2. DATE6.A.6.E.3. FOR THREE VEHICLES6.A.6.E.3.A. VEHICLE MAKE, VEHICLE MODEL6.A.6.E.3.B. MAXIMUM AIR FILTER READING (DPM/100CM2)6.A.6.E.3.C. MAXIMUM WHEEL WELL READING (DPM/100CM2)6.A.6.E.3.D. MAXIMUM TIRE TREADS READING (DPM/100CM2)6.A.6.F. ANTICIPATE SAMPLING WILL CONTINUE BEYOND THE TERMINATION OF OPERATION TOMODACHI.6.A.7. REPORTING REQUIREMENTS: REPORT RECEIPT. REPORT ANY ISSUES WITH SAMPLE COLLECTION. POC FOR THIS TASK IS BIO/ESO/EHO OFFICER, 225-4712, [email protected]. START DATE: 07 APR 116.A.9. END DATE: CONTINUE UNTIL ORDERED TO CEASE BY USFJ.6.A.10. EXECUTION STATUS: APPROVED.

7. POINT OF CONTACT. JSF CATCHIEF, EMAIL: USFJ-CAT-CHIEF(AT)USFJ.MIL, DSN: 315-225-2469.//BT

19