MASTER APPEAL FORM ORIGINAL - Los...

23
MASTER APPEAL FORM City of Los Angeles Department of City Planning APPEAL TO THE: City Council (PLANNING AND LAND USE MANAGEMENT COMMITTEE) (DIRECTOR, AREA PLANNING COMMISSION, CITY PLANNING COMMISSION, CITY COUNCIL) REGARDING CASE #: CPC-2009-542-GPA-ZC-HD-ZV-ZAA-SPR PROJECT ADDRESS: 1311 W. Sepulveda (Lot 2 & 3 of Tract No. 65665) FINAL DATE TO APPEAL: May 7, 2014 ORIGINAL TYPE OF APPEAL: 1. a Appeal by Applicant 2. Appeal by a person, other than the applicant, claiming to be aggrieved 3. Appeal by applicant or aggrieved person from a determination made by the Department of Building and Safety APPELLANT INFORMATION Please print clearly Name: Nancy Bush, A&M Properties, Inc. Are you filing for yourself or on behalf of another party, organization or company? 1:1 Self Other: Seabreeze Homes LP & 223rd Normandie Properties LP (property owner) Address: 23545 Crenshaw Blvd., Suite 100 Torrance Telephone: (310) 539-5390 Zip: 90505 E-mail: [email protected] Are you filing to support the original applicant's position? CI Yes LI No REPRESENTATIVE INFORMATION Name: Darryl L. Fisher, Fisher Associates Inc. Address: 21520 Yorba Linda Blvd, Suite G-563 Yorba Linda Zip: 92887 Telephone: 714-777-6802 E-mail, [email protected] This application is to be used for any appeals authorized by the Los Angeles Municipal Code for discretionary actions administered by the Department of City Planning. CP-7769 (11/09/09)

Transcript of MASTER APPEAL FORM ORIGINAL - Los...

MASTER APPEAL FORMCity of Los Angeles — Department of City Planning

APPEAL TO THE: City Council (PLANNING AND LAND USE MANAGEMENT COMMITTEE)(DIRECTOR, AREA PLANNING COMMISSION, CITY PLANNING COMMISSION, CITY COUNCIL)

REGARDING CASE #: CPC-2009-542-GPA-ZC-HD-ZV-ZAA-SPR

PROJECT ADDRESS: 1311 W. Sepulveda (Lot 2 & 3 of Tract No. 65665)

FINAL DATE TO APPEAL: May 7, 2014

ORIGINAL

TYPE OF APPEAL: 1. a Appeal by Applicant2. ❑ Appeal by a person, other than the applicant, claiming to be aggrieved3. ❑ Appeal by applicant or aggrieved person from a determination made by the Department

of Building and Safety

APPELLANT INFORMATION — Please print clearly

Name: Nancy Bush, A&M Properties, Inc.

■ Are you filing for yourself or on behalf of another party, organization or company?

1:1 Self ❑ Other: Seabreeze Homes LP & 223rd Normandie Properties LP

(property owner)

Address: 23545 Crenshaw Blvd., Suite 100

Torrance

Telephone: (310) 539-5390

Zip: 90505

E-mail: [email protected]

■ Are you filing to support the original applicant's position?

CI Yes LI No

REPRESENTATIVE INFORMATION

Name: Darryl L. Fisher, Fisher Associates Inc.

Address: 21520 Yorba Linda Blvd, Suite G-563

Yorba Linda Zip: 92887

Telephone: 714-777-6802 E-mail, [email protected]

This application is to be used for any appeals authorized by the Los Angeles Municipal Code for discretionary actions administered bythe Department of City Planning.

CP-7769 (11/09/09)

JUSTIFICATION/REASON FOR APPEALING — Please provide on separate sheet.

Are you appealing the entire decision or parts of it?

ID Entire 0 Part

Your justification/reason must state: See attachment

• The reasons for the appeal • How you are aggrieved by the decision

• Specifically the points at issue • Why you believe the decision-maker erred or abused their discretion

ADDITIONAL INFORMATION/REQUIREMENTS

• Eight (8) copies of the following documents are required (1 original and 7 duplicates):

• Master Appeal Form• Justification/Reason for Appealing document• Original Determination Letter

• Original applicants must provide the original receipt required to calculate 85% filing fee.

• Original applicants must pay mailing fees to BTC and submit copy of receipt.

• Applicants filing per 12.26 K "Appeals from Building Department Determinations" are considered original applicantsand must provide notice per 12.26 K 7.

• Appeals to the City Council from a determination on a Tentative Tract (TT or VTT) by the City (Area) PlanningCommission must be filed within 10 days of the written determination of the Commission.

• A CEQA document can only be appealed if a non-elected decision-making body (i.e. ZA, APC, CPC, etc...) makes adetermination for a project that is not further appealable.

"If a nonelected decision-making body of a local lead agency certifies an environmental impact report, approves anegative declaration or mitigated negative declaration, or determines that a project is not subject to this division, thatcertification, approval, or determination may be appealed to the agency's elected decision-making body, if any."--CA Public Resources Code § 21151 (c)

I certify that the statements d in this application are complete and true:

Appellant Signature:

Planning Staff UAe Only

Date: 1707120/

Amount ..,1 )1102..44.9 Reviewed and Accepted by 251:.&...wirtpta_..41-- Date

Date

1///772..(ifReceipt No. 0,0D. (r3 M Deemed Complete by

❑ Determination Authority Notified

CP-7769 (11/09/09)

❑ Original Receipt and BTC Receipt (if original applicant)

Specifically the points at issue

1. The Industrial Land Use Policy (ILUP)

In December 2007, the Los Angeles Department of City Planning (DCP) and the CommunityRedevelopment Agency of the City of Los Angeles (CRA/LA) published a report thatemphasized the preference of using industrially zoned land for creating jobs. However, HarborGateway was not part of the area selected for the study (Figure 1). Moreover, issues discussed inthe report are less relevant to Harbor Gateway. The following table compares these major issuesof industrial land use in Harbor Gateway vs. those areas covered in the report.

Major Land Use Issues Harbor Gateway' ILUP2Percent of land zoned for industrial use 41% 8%Housing units built/approved in industrialareas since 2001

None 2,332 units(Downtown only)

With regards to the opportunities for housing development, the ILUP report points out that "TheGeneral Plan Framework and the Community Plans, which together make up the Land UseElement of the General Plan, direct housing development to job centers, mixed use districts, andareas with access to transit and neighborhood amenities. Such areas can attract and support thecommercial uses, amenities, and services that residents need and desire and that createneighborhoods." Such statements indicate that in certain situations, the Plan does support theconversion of industrial to residential land uses. Due to a lack of vacant or under-utilizedresidential land for multi-family housing development, selected areas in Harbor Gateway, suchas the Sepulveda commercial corridors, meet this guideline for housing development.

I. Harbor Gateway Community Plan updated October 2001.2. Los Angeles' Industrial Land: Sustaining a Dynamic City Economy, December 2007.

2. Update to General Plan along Sepulveda Blvd Commercial Corridor

As noted in the Harbor Gateway Community Plan, Sepulveda Boulevard is a main commercialcorridor. Had the plan been updated to reflect the actual land use along Sepulveda Boulevard(Figure 2), the industrially zoned land shown in blue, should have been changed to neighborhoodcommercial, shown in red (Figure 3). The proposed request for amendment of the General Planwould be part of the Sepulveda Blvd commercial corridor.

3. Industrial Land Use in Harbor Gateway

The Harbor Gateway plan area is located in southern Los Angeles, south of 120th Street andnorth of Sepulveda Boulevard. The Community Plan consists of approximately 3,229 acres'. Therecently completed Harbor Freeway Transit Way along the Harbor Freeway (Interstate 110), aswell as the 1,015 car lot at the corner of Vermont Avenue and Artesia Boulevard, have increasedmass transit connections to downtown Los Angeles and San Pedro.

The Industrial Land Use Policy (ILUP) report by the Los Angeles Department of City Planning(DCP) and the Community Redevelopment Agency of the City of Los Angeles (CRA/LA)

1

indicated that just eight percent (8%) of the City of Los Angeles is zoned for industrial use. Incontrast, Harbor Gateway designates approximately forty-one percent (41%), or 1,050 acres, ofland for industrial use.

Harbor Gateway enjoys excellent access to Interstate Freeways 110, 405, 91 and 105; LosAngeles International Airport (LAX); and San Pedro, the port of Los Angeles. Industrial landlocated east of the Harbor Freeway and south of the San Diego Freeway has been developed intomid-to high-rise office buildings (Figures 4 and 5).

Recent redevelopment of industrially zoned sites led to the construction of large scale warehouseand distribution facilities. Along 190th Street, a former 42-acre Honeywell manufacturing plantwas converted into a self-storage facility and a warehouse for PC Mall, an Internet retailer.

The most noticeable development in recent years was a 67-acre industrial site formerly used asaerospace production facilities by Martin Marietta on the southeast corner of 190th Street andWestern Avenue. Large warehouses and distribution facilities have been built on the site(Figures 6 and 7). East of the site, a zoning change from industrial use to neighborhoodcommercial allowed for the construction of a hotel, Wal-Mart store, and other retail shops(Figures 8 and 9).

Another large industrial site was rezoned to neighborhood commercial (M3 to C4-1) for aHoliday Inn on Vermont Avenue south of the San Diego Freeway (Figures 10 and 11).

At the southeast corner of 182nd Street and Vermont Avenue, a vacant 350-acre area planned forheavy industrial land is currently used for a used car auction operation (Figure 12).

In summary, due to the strategic location of Harbor Gateway between LAX and the port of LosAngeles, most of the industrial land uses are related to import/export activities such as logistics,warehouse/distribution spaces, and offices. Former manufacturing facilities have been convertedinto logistics warehouses, offices, and retails. There is still a surplus of industrially zoned sitesthat are used as salvage yards (southeast corner of Vermont Avenue and Artesia Boulevard),storage yards, and used car auction lots (a vacant 350-acre heavy industrial land) in HarborGateway.

4. Shortage of Housing in Harbor Gateway

Due to the shortage of workforce housing in Harbor Gateway in recent years, a 77-unit apartmentbuilding has a waiting list for prospective tenants such as nurses and interns from the adjacentUCLA Harbor Medical Center3. This shortage has even resulted in a concerted effort to helpteachers and families find housing and live closer to their jobs. For example, developerBRIDGE Housing has broken ground to build 90-unit apartments on a L.A. Unified SchoolDistrict-owned site on the campus of Gardena High School (Figure 13) 4.

It can also be noted that no apartment projects of any sizes have been built in Harbor Gatewaysince the late 1980's due to a shortage of developable residential land'.

2

3. Communication with manager at the Gateway Court apartment (Dorothy, 310-782-8338).4. BRIDGE Housing www.bridgehousing.com 5. Communication with executives of CB Richard Ellis Group, Inc. (Mike McKinney, 310-880-2900).

5. Alleged Job Loss as a Result of Complaints from Future Residents

In October 2011, L&B Realty in Dallas, Texas, bought the old section of the Storm BusinessPark that includes tenants such as All Access and Los Angeles Times, which are adjacent to theproposed apartment buildings. Representatives from L&B stated that 500 jobs could be at risk ifthe future tenants of the apartment project start complaining about the outdoor construction,noise, odors, and truck traffic.

However, this statement is not grounded in facts. Since 2008, the developer has had severalmeetings with the president of All Access, which occupies two buildings in the Storm BusinessPark. One of the buildings is located at the entrance of Storm Parkway and is across the streetfrom a new 78-unit condo project built in 2009 (former a used car auction lot) on NormandieAve and 228th Street (Figure 14). For the last 5 years, there have been no complaints reported bythose 78 families about noise, odors, and traffic across the street from the business park. In 2011,L&B did due diligence on the fact that there were residential developments adjacent to thebusiness park such as the proposed apartment project and the new construction of the 78-unitcondos before entering a contract to buy a portion of the Storm Business Park that included AllAccess and Los Angeles Times.

To mitigate these potential issues, the developer sold a 50-foot strip of land to L&B'spredecessor TA Realty Boston to create a buffer zone between the proposed apartment buildingsand All Access and Los Angeles Times (Figure 15). In addition to the 50-feet buffer zone, theproposed building will set back 21 feet from the property line. The total distance between theproposed apartments and their northerly business neighbors is comparable to that shown inFigure 16, i.e. the distance between All Access and the 78-unit condos.

Also, the two proposed buildings will have two levels of above-grade parking and apartmentunits will start on the 3rd floor. The elevated nature of the design of the proposed building willprovide a vertical separation to minimize impacts of potential noise and odors from the BusinessPark.

Furthermore, the developer of Sea Breeze Apartments proposes to sign an indemnificationagreement with L&B and give full disclosure to prospective future apartment tenants aboutpotential issues.

Communication between businesses tenants of Storm Business Park and Los Angeles Times andAll Access in the past 5 years has revealed no indication of concern regarding job losses as aresult of residential development around the Park. Therefore, it is unlikely that there will be joblosses as a result of the development of the proposed apartments.

6. Alleged Job Loss as a Result of Converting Industrial Land for Residential Use

3

Employment for new development as estimated by Fishkind & Associates for the Fiscal ImpactAnalysis Model (FIAM) is as follows:

Warehouse: 5,000 sq. ft. per employee (range: 1,000-7,500 sq. ft. per employee)Office: 350 sq. ft. per employee (range: 275-450 sq. ft. per employee)Retail: 600 sq. ft. per employee (range: 450-650 sq. ft. per employee)

Based on this study, job loss as a result of taking industrial land for residential use isexaggerated. For example, if the proposed Lots 2 & 3 are developed as office/warehouses forlogistics, the estimated employment will be as follows:

Lot size: 222,906 sq. ft. Building size: warehouses: 111,453 sq. ft.; office spaces 3,500 sq. ft. (52% lot coverage)Estimated new employees for warehouses: 22 (Average 5,000 sq. ft. floor space per employee)Estimated new employees for offices: 10 (Average 350 sq. ft. per employee)Total new employees: 32

The 32 new jobs would be fewer than the number created by the proposed apartment buildings(40 jobs) as described in the analysis in the following paragraph.

7. Job Creation through Multi-Family Development

It is a general misconception that residential developments do not create jobs. Class A multi-family communities often contain amenities such as a swimming pool, spa, health club, clubhouse, meeting facilities, recreational facilities, state-of-the-art communication systems, T1, fiberoptic, Wi-Fi, elevators, methane gas detection systems, full sprinkler systems, fire detection andalarm systems, energy efficient lighting and central HVAC systems. In order for these systemsto operate smoothly, multi-family projects rely on the expertise of technicians, plumbers,electricians, carpenters and elevator crews.

In addition to the job opportunities for painters, cleaning crews, gardeners, pool cleaners andsecurity personnel, Class A apartment communities hire well-paid interior designers, architects,engineers, professional managers, marketing executives, advertising agents, and leasingspecialists.

For each dollar of gross income from an apartment, 35 to 40 cents contributes to the expenses ofoperating and maintaining the building'. Compared to jobs at retail stores and warehousedistribution spaces, jobs to operate and maintain multi-family projects often provide higherwages and better opportunities for career advancement.

Furthermore, Class A apartments play an important role as incubator units for entrepreneurialand home-based business operators. The state-of the-art communication systems and meetingfacilities allow apartment tenants to conduct business from the convenience of their homes. Inthe latest survey, about 25% of tenants who lives in the Class A building as proposed in thesubject property have a home-based business'.

4

Examples of types of home-based businesses:• Consulting• Marketing• Advertising• Communications• Film/video production/editing• YouTube video production• Maintenance/janitorial/painting business• Selling beauty products• Interior design• Masseuse• Medical billing• Telemarketing• Financial advising• Landscaping designer• Import/export related business

Class A apartments provide essential amenities for these types of businesses to operate:• Unit amenities:

Office space and tech desk in unitsHigh speed internet via fiber optic cableIn-unit telecommunication networkSatellite data networkTemperature controlled units with heating and A/C

• Building amenities:Wi-Fi available in common areasBusiness center with fax and printerBoard room and meeting roomsTeleconferencing facilities24-hour fitness center

In summary, distribution warehouses recently built to replace manufacturing facilities in HarborGateway do not create as many jobs as the previous use for manufacturing facilities. Theproposed apartment complex is estimated to create 40 full-time, well-paid jobs. It will becomparable to those of a logistics warehouse recently built in Harbor Gateway. Class Aapartment buildings such as the proposed project will not only create jobs but also facilitatehome-based businesses.

6. Data from 2013 annual report, Apartment Owners Association of California, Inc.7. Communication with apartment manager at a Class A, 136-unit apartments building, located in San Pedro (Lumi, 310-514-2515).

How you are aggrieved by the decision?

The property owner is aggrieved by this decision due to the right of the property owner todevelop the subject property in relationship to an up-to-date Community Plan. The 18-year-oldPlan does not accurately reflect the Sepulveda Boulevard commercial frontage developmentbetween Normandie and Western.

5

Further, the decision by the Planning Commission is a great loss for the Harbor Gatewaycommunity, ignoring five years of hard work by the Councilmember of District 15 andNeighborhood Council as well as the need for housing for teachers, police officers, nurses andother professionals in Harbor Gateway.

These points are further described as follows:

1. The 18-year-old General Plan is outdated and should be updated to reflect the actual usealong the Sepulveda Blvd commercial corridor, the proposed zone change then would bewithin the objective and framework of the community plan and part of the mixed-usenature of a residential development along a major highway.

2. Harbor Gateway was not part of the area selected for the study of the Industrial Land UsePolicy (ILUP) and issues discussed in the report are less relevant to Harbor Gateway. ThePlan does support the conversion of industrial to residential land uses in certain areas.The report identifies these situations: "Such areas can attract and support the commercialuses, amenities, and services that residents need and desire and that createneighborhoods." The proposed project will support the logistics use and serve the needsof the Harbor Gateway community.

3. Three-term Councilmember Janice Hahn worked with the developer, the NeighborhoodCouncil, and the community on this project since 2008. On the last day before herdeparture to join the U. S. Congress, she wrote a letter of support for this project(Attachment #1).

4. The proposed project fulfills the Councilwoman's goals in providing new housing whilenot destroying existing single family homes or multiple units in Harbor Gateway(Attachment #2, Los Angeles Times article).

5. Councilman Joe Buscaino recently attended a ground breaking ceremony of a 90-unitapartment development adjacent to a baseball field on the Gardena High School campus.This example demonstrates the shortage of housing for teachers and other professionalsin Harbor Gateway.

6. The proposed project is supported by the Neighborhood Council, the adjacent businessessuch as Storm Industries (East), Mulligan Family Fun Center (West), Murad Skincare,Room & Board (North) and residents in the community. (Attachment #3).

7. The proposed Lots 2 and 3 are approximately 500 feet off Sepulveda Boulevard and theonly ingress and egress to the street is a cul-de-sac, Fontaine Way. There is no secondaryaccess to a street from these lots. While the unique location of these two lots is ideal fora residential development, it presents limitations for logistics and warehousing spaces andother manufacturing facilities that use large trucks.

8. Storm Properties owned and developed Storm Business Park with offices and warehousesnorth and east of the subject Lots 2 and 3. Storm also is presently building a retail plazasouth of Lots 2 and 3 along Sepulveda Blvd. Storm sold Lots 2 and 3 to Sea Breeze forthe proposed project and kept all the surrounding land due to limitations of land lock andingress and egress of a cul-de-sac. As an experienced developer for businesses, Storm hasin-depth knowledge of knowing that the proposed Lot 2 &3 land is not suitable to buildfor logistics and warehousing (Figure 17).

6

9. Concerning opposition to the added area, Lot 5 is not an issue. Construction in StormPlaza along Sepulveda Blvd — including a CVS (completed in 2013, Figure 18), a WellsFargo, Good Will Store, and other retailers — is expected to be complete in July 2014.The remaining issue would be on Lot 4. Storm's concern is the requirement of aConditional Use Permit (CUP) for a drive-through fast food restaurant as a result of zonechange to C2-1. If a [Q] condition is added to the zone change to waive the CUPrequirement for a drive-through, Storm will have no issues including Lots 4 and 5 in theadded area.

10. In conclusion, this project has gained support from the Councilmember in the 15thDistrict, Neighborhood Council, and the community. More importantly, the proposedhousing will meet the needs and desires of the community.

Why you believe the decision-maker erred or abused their discretion?

The staff report states that the property should not be rezoned because of the Harbor GatewayCommunity Plan which has not been updated in 18 years and the Industrial Land Use Policy(ILUP) which focused on retention of industrial property after studying primarily Downtown andWest Los Angeles areas. Therefore, because of the age of the Community Plan and thepotentially inapplicable policies of the ILUP, the decision reached by the planning staff and thePlanning Commission is capricious and arbitrary.

The City Planning Commission allowed only two pages of hand outs and a 10 minutepresentation by the applicant in the hearing. The applicant was unaware of this limitation prior tothe hearing, and similar restrictions were not imposed during previous hearings such as PonteVista and other projects. As a result, the applicant had insufficient time to provide completeinformation for the commissioners to make an informed decision.

7

Figu

re 1

. Har

bor G

atew

ay is

not

par

t of t

he s

tudy

are

ain

clud

ed in

the

Indu

stria

l Lan

d U

se P

olic

y (IL

UP)

repo

rt

Stu

dy A

rea

Zoni

ng C

lass

CM

. CM

(GM

)

EM

I M

l, M

(PV

)

11

1.

M2.

M2(

PV

)

M3

1111

11 M

R1:

MR

2

City

Bou

ndar

y (P

LN)

Cou

ncil

Dis

tric

t 15

Zer

o ap

artm

ents

Har

bor

Gat

eway

bu

ilt o

n M

-zon

ed la

nd

4,

was

no

t par

t of

the

stud

y ar

ea

""(

Figu

re 2

. Har

bor G

atew

ay C

omm

unity

Pla

n pr

omot

es re

side

ntia

lan

d m

ixed

-use

d de

velo

pmen

ts a

long

com

mer

cial

cor

ridor

s

• S

epul

veda

is a

com

mer

cial

cor

ridor

eve

n th

ough

it is

des

igna

ted

asM

anuf

actu

ring

in th

e C

omm

unity

Pla

n

Wal

gree

ns

Apar

tmen

ts

"Jiff

y I;u

be

;Arb

y.,,

One

eest

8,an

k"1

11.-

'4--S

tiper

dulp

er

Sign

troni

x.

- -.

, 41

1001

1111

'.. -

.....

i

-

War

ehou

se

Lot 1

. •

Mul

ligan

Fam

ily F

un C

ente

r11

0.5

Aim

71.W

All

Acce

ss

•• St

orm

Subj

ect,

Pro

perti

es>

Lot 3

.: .

1441

1111

1CD

Stor

mPr

oper

ties

Figu

re 3

. The

pro

pose

d m

ixed

-use

d na

ture

of t

he to

tal p

roje

ct w

illm

eet t

he o

bjec

tives

of d

evel

opm

ent a

long

com

mer

cial

cor

ridor

s

• Th

e no

rth

side

of S

epul

veda

is a

ctua

lly b

uilt

out a

s a

com

mer

cial

cor

ridor

and

the

Gen

eral

Pla

n is

to b

e up

date

d fro

m b

lue

to re

d•

The

prop

osed

pro

ject

is p

art o

f the

com

mer

cial

cor

ridor

441

Upd

ated

Gen

eral

Pla

n

Exi

sitin

g G

ener

al P

lan

Figure 4

h RN irg Dili rmiMI realvia amiN

II row we to rard a lasa all am ail la ar/Li Jill laid,

Office Building on M3 Land at 1-405 and Vermont Ave.

Office Buildings on M3 Land Along 190th Street Business District

Figure 6

Figure 7

New Warehouse Built on Former Aerospace Manufacturing Sites at 190'Street and Western Ave

Typical Warehouse and Distribution Spaces in Harbor Gateway Built onFormer Manufacturing Sites

Figure 8 New Wal-Mart Store on Rezoned M3 Land at 190th Street and NormandieAve

Figure 9 Hotel Built on Formerly M3 Site West of Wal-Mart

I I4 'T iA FT H i

-.F HFI -

190TH ST

LA City Planning

Figure 10

Figure 11

w

4Background Display: Generalted Zoning

.!toifi

li

0 ', 1,769 Feet

Generalized Zoning▪ °S

A, RA

RE. RS. RI, RU, RE,

R2, RD, RAF 12W2,RAS3, RA, RASA, It

11111 ADP, Cl, CI.5, C2,CS, CR, CW, LASEt

1=1 CHAIR, CM, RI,LAX V3,

▪ P, PB

PFIWW19 HILLSIDE

The Holiday Inn and Wal-Mart Sites Resulting from Rezoning ofIndustrial to Neighbor Commercial Land Use

Aerial View of the Wal-Mart Site Changed from M3 to C2

Figu

re 1

2. H

arbo

r Gat

eway

has

ple

nty

of u

nder

util

ized

M-z

oned

land

-41

% o

f ind

ustr

ial l

and

in H

arbo

r Gat

eway

, com

pare

d to

8%

in th

e C

ity o

fLo

s A

ngel

es.

350

Acr

es M

-Zon

ed

Figu

re 1

3. C

ounc

ilman

Joe

Bus

cain

o at

tend

ed a

gro

und-

brea

king

cer

emon

yto

bui

ld a

90-

unit

apar

tmen

t on

a hi

gh s

choo

l cam

pus

in H

arbo

r Gat

eway

Cou

ncilm

an J

oe B

usca

ino

Ben

efits

of t

he p

ropo

sed

Sea

Bre

eze

Apa

rtmen

ts

• N

eede

d ho

usin

g fo

rte

ache

rs, p

olic

e of

ficer

s,fir

efig

hter

s, n

urse

s, o

ther

prof

essi

onal

s

• W

ill be

com

plet

ed w

ithou

tde

stro

ying

any

exi

stin

gsi

ngle

fam

ily h

omes

• En

viro

nmen

tally

frie

ndly

land

use

com

pare

d w

ithhe

avy

man

ufac

turin

g an

dus

ed c

ar lo

ts

• W

alki

ng d

ista

nce

to s

tore

san

d of

fices

will

redu

ceve

hicu

lar t

rips,

mile

stra

vele

d, a

nd p

ollu

tion

Figu

re 1

4. C

ondo

s bu

ilt o

n M

-Zon

ed la

nd a

re a

sto

ne's

thro

w a

way

from

the

prop

osed

apa

rtmen

ts p

roje

ct

All

Acc

ess

Sta

ging

Sto

rm P

kwy

Sto

rm P

kwy

The

cond

os a

re n

eath

e su

bjec

t pro

perty

,

Sub

ject

kUse

d ca

r auc

tion

lots

IMF

Mru

nirc

ondo

s

Figu

re 1

5. S

old

a 50

' lan

d st

rip to

nei

ghbo

r to

crea

te a

buf

fer;

Uni

tsbu

ilt o

n to

p of

two-

leve

l par

king

cre

ate

a ve

rtica

l sep

arat

ion

78-u

nit N

owC

ondo

s

MARIPOSA AVL

0.04

Mlle

s20

0 Fe

et

ADP,

Cl, C

1.5,

C2

C4,

cs, a

t, CW

.wc CM

, MR,

ccs,

sot a

n,LA

X, M

1, S

L

Figu

re 1

6. N

o jo

bs h

ave

been

at r

isk

sinc

e 78

con

dos

wer

e bu

iltat

the

gate

way

of S

torm

Bus

ines

s P

ark

in 2

009

Figu

re 1

7. S

torm

com

plet

ed a

bus

ines

s pa

rk in

200

8, b

uilt

reta

ils in

2013

; sol

d Lo

ts 2

& 3

due

to la

nd lo

ck (u

nsui

tabl

e fo

r ind

ustr

ial u

se)

Apar

tmen

te.,

blo

ws,

Offi

ce W

areh

ouse

sB

uilt

2008

Offi

ce W

areh

ouse

sB

uilt

2008

• •••

Offi

ce W

areh

ouse

sB

uilt

2008

Mul

ligan

Fam

ily F

un C

ente

r

Sto

rm N

ewO

ffice

reho

use.

- -2

vow

W 22

8tHW

2285

St

Los

Ange

les

Bui

lt 19

89• ..

wir

a ii•v

t,•

411114

110,...

._ .1

111111

0. s•

Ange

les

14‘,

Lo

tr

Bum

2013

r"

t.,41

TM S

W-6 Pl

ow

Stor

mPr

oper

ties

Stor

mIn

dust

ries

- Wel

ls F

argo

--7-

Beth

2014

RCVS

'.:W 22

e5 St ti tit

New

78.

unit

Con

dos

Bui

lt 20

09

,41118

Sto

rm P

laza

Lot 5

Und

erC

onst

ruct

ion

Figu

re 1

8. In

clud

ing

Lot 5

as

adde

d ar

ea w

ill n

ot b

e an

issu

e. S

torm

Pla

zaP

hase

I C

VS a

lread

y co

mpl

eted

; Pha

se II

Wel

ls F

argo

and

oth

ers

are

to b

eco

mpl

eted

in J

uly

2014

; Lot

4 h

as y

et to

sec

ure

a te

nant