County of Los Angeles - Department ofPublic Works
Construction Division'; COR~I~~ l''~,~, FQ~~ ~ ~. C ,~~~~, ~~+~GN
I Y Y
~~
fr ` t-
`~'~ " ~ .:~ ~ b T L ~, ~.' ~ 4 ~ ~h'~ . ~ ~' ~ ,hail':+
02(21112 03120112RDC0015463 Buelah Circle Drainage Improvements
TSM0010049 San Gabriel Boulevard - Sierra Madre 02121/12 03120112Boulevard TSSP
FCC0001209 Alamitos Bay & Claretta Drain Pump 03/06/12 04110112Station Upgrades includes:
1) Alamitos Bay Pump Station
2) Claretta Drain Pump Station
SMDAC00132 Calabasas Sewer Upgrade 03106/12 04103/12 AAA
RDC0015526 Holliston Avenue, et al. 03106112 04103112
RDC0015500 Mulholland HighwaylNewton Canyon 03/06112 04103112Road, et al. includes:
(RDC0014070) 1. Mulholland Highway at C.M. 15.47,et al.
(RDC0014798) 2. Newton Canyon Road, et al.
SLT0000004 Workman Mill Road Between Valley 03106112 04103112Blvd &San Jose Creek
RDC0015137 Admiralty Way at Palawan Way, et al. 3113/12 04110/12 Pending MDR Ph - IIWaterline Schedule
FCC0001198 Alamitos Barrier Project New 03120112 04117112Observation Wells
RDC0014151 Slauson Avenue - Compton 03120/12 04117112 Start construction after
AvenuelAlameda Street completion of Randolph St.(RDC0014410)
LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS
CAPITAL PROJECTS
ESTIMATED ADVERTISINGPROJECT DESCRIPTION LOCATION COST DATE
Fire Station 69 Septic Tank The proposed new septic system will replace the Topanga, CA
Replacement existing failing system which will cAnsist of a 1,500-gallon main processing tank, filter pods, a
distribution box, and three seepage pits.
Manhattan Beach Library The project consists of demolition of a 12,118 Manhattan Beach
square-feet existing library and the construction of a CA
21,500 square-feet library facility on the same site.
The project will be designed and built to LEED GoldCertification level.
OVMC Can Sterilizer Bldg The building is a single story concrete masonry Sylmar, CA
Replacement block, 800 square feet in area, with steel sash
windows, steel door frames and composition
shingled roof.
Bald Mountain New The project will consist of aself-supporting steel Gorman, CA
CommunicationTower lattice communications antenna tower that will be150 feet in height and will be equipped with all the
necessary mounts and accessories.
Barton Fuel System The scope of work is to remove and replace six Pacoima, CA
Refurbishment fueling locations and all piping from existing
underground tank, add a seventh fueling location,
add a 10,000 gallon above ground fuel tank, add two
canopies and new fuel pumps, and remove and
replace two existing 500 gallon waste oil tanks.Upgrade all electrical components and add a new
electrical service.
Hauser Peak New Tower The project will consist of aself-supporting steel Palmdale, CA
lattice communications antenna tower that will be150 feet in height and will be equipped with all the
necessary mounts and accessories.
KH Eastern Ridgeline Project LANDSCAPE: The project is located within the Baldwin Hills, CA
Kenneth Hahn State Recreational Area. The projectproposes to construct four fitness areas along a
proposed and approximate 1l2 mile nature walking
trail.
Puente Hls New Communication The project will consist of one communications Rowland Heights,
Tower building (approximately 422 square feet), one CA
equipment building (approximately 999 square feet),
and aself-supporting steel lattice communications
antenna tower that will be 150 feet in height and will
be equipped with all the necessary mounts andaccessories.
Rio Hondo New Communication The project will consist of a communications building Whittier, CA
Tower (approximately 999 square feet) and a self-
supporting steel lattice communications antennatower that will be 150 feet in height and will be
equipped with all the necessary mounts and
accessories.
Santa Monica Canyon Rubber The Santa Monica Canyon Channel Rubber Dam Santa Monica
Dam Project will use an inflatable rubber dam installed in Canyon Channel
the Santa Monica Channel to divert winter low water
flows to the City of L. A.'s water treatment plant.
$360,000 Jan-12
$14,500,000 Jan-12
$187,500 Jan-12
$682,000 Feb-12
$1,988,800 Feb-12
$682,000 Feb-12
$1,460,000 Feb-12
$1,656,000 Feb-12
$1,483,500 Feb-12
$1,007,500 Feb-12
01/12/2012 Page 1 of 3
LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS
CAPITAL PROJECTS
ESTIMATED ADVERTISINGPROJECT DESCRIPTION LQCATION
COST DATE.
Lennox Library and Community The project will renovate the 3,000-square-foot Inglewood, CA $4,410,000 Mar-12
Center existing library, construct a new 5,400-square-footaddition to the library, and renovate the remaining11,000 square feet for a community center.
OVMC Child Care The project scope involves the design and re- Sylmar, CA $2,909,500 Apr-12
construction of approximately 5,200 sf. Day CareFacility within the Olive View Medical CenterCampus.
Eastern Ave Hill and Blanchard This project consists of addressing the slope erosion Los Angeles, CA $14,066,000 May-12
Slope and storm water drainage issues on the EasternAvenue Hill including the temporary repairs to beimplemented at the Blanchard East Slope erosion.
Los Angeles River Headwaters The proposed project consists of design and Canoga Park, CA $6,700,000 Jun-12
construction of a trail path along both side of the LosAngeles River from the confluence of Bell Creek andCalabasas Creek to the confluence of Los AngelesRiver and Browns Creek. The project includeslandscaping, interpretive signage, decorativefencing, and a pedestrian bridge across BrownsCreek.
Los Angeles River-North The proposed project consists of construction of a Studio City/Sherman $1,824,100 Jun-12
Valleyheart pedestrian trail along north sides of the Los Angeles Oaks, CARiver adjacent to Valleyheart Drive between Fultonand Coldwater Canyon Avenues.
Will Rogers Coastline Pkg Proposed improvements consist of reconstruction Malibu, CA
LoWiew and reinforcement of the existing eroding asphaltconcrete parking lot adjacent to the beach bluff witha new 15ft high and approx. 600 LF Seawall tostabilize the slope. Also to be constructed will be anew concrete view deck on a pile foundation systemwith an accessible pedestrian walkway to the beach,landscaping and irrigation improvements.
Camp Glenn Rockey - Modular Procure and install one (1) new modular living San Dimas, CAUnit quarter (3,600 sq. ft.). Develop site (i.e., ADA
compliant path of travel, utilities POC, etc.) asrequired for the use of new modular living quarter.
Oxford Retention Basin Project This project is to improve the capacity and water Marina Del Rey, CAquality in the O~ord Retention Basin by dredgingthe basin and adding a berm in the basin torecirculate water.
County Data Center The project consists of constructing a new data Downey, CAcenter for the County of Los Angeles. The facilitywill include approximately 30,000 square feet ofraised floor data center. Atwo-story, 27,000 squarefoot annex building with two floors of undergroundparking will also be constructed.
The facility is an essential facility, and as such, allmain and support services must be designed andconstructed to provide continuous service.
$6,700,000 Jun-12
$629,000 Aug-12
$8,800,000 Aug-12
$110,000,000 Sep-12
01/12/2012 Page 2 of 3
LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS
CAPITAL PROJECTS
ESTIMATED ADVERTISING'PROJECT DESCRIPTION LQCATION
COST DATE
RLANRC North Campus The North Campus Consolidation project includes Downey, CA $30,590,000 Sep-12
Consolidation renovation of the inpatient acute care rehabilitationservices JPI building, construction of a new inpatientacute care rehabilitation services addition to thenorth of the JPI building, demolition of some existing
buildings, and relocation of the outpatient services
and construction of new outpatient facilities.
Castaic Animal Shltr SN Clinc The Project will consist of construction of a new Castaic, CA $800,000 Oct-12
and HQ approximately 1,600-square-foot spay/neuter clinicwith proper evaluation, presurgery, and post-surgeryrooms, and a customer service area. In addition, theProject will include installation of a new 1,440-
square-foot modular administration building.
Dan Blocker Beach General improvements includes a parking lot, picnic Malibu, CA $1,276,000 Oct-12
area with protective railing, restroom facilities,planting erosion control landscape for the beach.
TOTAL $27 2,711,900