Mary Althoff Portfolio
-
Upload
mary-a-gilmore -
Category
Documents
-
view
222 -
download
0
description
Transcript of Mary Althoff Portfolio
mar y ALTHOFF
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
PROJECT: Residential AdditionLOCATION: Kenner, LADESIGNER: Mary AlthoffPROJECT SIZE: 1,400 SFCOMPLETED: Sept, 2011
Prepared complete set of construction documents for residential addition project. Acted as project manager, led meetings with homeowner, drafted design and construction details, completed permitting process.
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
HIS
TO
RIC
RE
NO
VA
TIO
N
PROJECT: Mills Seed RenovationLOCATION: Washington, IADESIGNER: Mary AlthoffPROJECT SIZE: 12,000 SF
Renovation of historic factory building into mixed use retail/condo development. Responsible for schematic design, space planning, and detail development.
SH
OR
ING
DE
SIG
N
PROJECT: Home ElevationLOCATION: Westwego, LAENGINEER: HC EngineeringPROJECT SIZE: 1,200 SF
Shoring design for home elevation. Responsible for pile layout, load calculations, and drafting construction document set.
SIG
NA
TU
RE
AV
IAT
ION
TE
RM
INA
L
PROJECT: Signature Aviation Terminal, Logan AirportLOCATION: Boston, MAARCHITECT: Chan Krieger SieniewiczPROJECT SIZE: 22,000 SFBUDGET: $11,200,000COMPLETED: June 2007
Passenger terminal and service building for Signature Aviation at Logan International Airport. The building is LEED certified, incorporating zinc alloy cladding and sunshades to shield exterior glazing while providing views to the exterior runway. A large zinc canopy also shades the entrance at the south side of the terminal. Produced construction document set, digital model, and renderings. Drafted construction document set, contributed to design development and detail specifications.
Rendering from 3D Model
Photograph of Main Entrance
Site Plan
SIG
NA
TU
RE
AV
IAT
ION
TE
RM
INA
L
SIG
NA
TU
RE
AV
IAT
ION
TE
RM
INA
L
SIG
NA
TU
RE
AV
IAT
ION
TE
RM
INA
L
West Elevation
East Elevation
PA
RK
AT
CE
NT
RA
L W
HA
RF
PROJECT: Park at Central WharfLOCATION: Boston, MAARCHITECT: Chan Krieger SieniewiczPROJECT SIZE: 4,000 SFBUDGET: $4,170,000COMPLETED: July 2007
Urban park and streetscape designed by CKS in collaboration with Reed Hilderbrand Associates. The design creates a gateway between Boston’s downtown historic districts and the New England Aquarium on the water front. Design elements include a trellis structure with integrated benches, outdoor seating, and a densely planted garden. Produced digital model, plans, presentation drawings, and deign specifications.
Rendering from 3D Model Rendering from 3D Model
Photograph of Garden Area
Photograph of Bench Seating
Site Plan
PA
RK
AT
CE
NT
RA
L W
HA
RF
PA
RK
AT
CE
NT
RA
L W
HA
RF
Rendering from 3D Model
Rendering from 3D Model
PA
RK
AT
CE
NT
RA
L W
HA
RF
VIR
IDIA
N C
ON
DO
MIN
IUM
S
PROJECT: Viridian CondominiumsLOCATION: Nashville, TNARCHITECT: Smallwood, Reynolds, Stewart, Stewart, & AssociatesPROJECT SIZE: 552,000 SF
Condominium tower with 31 stories, 305 residential units, exercise room, lobby, and lounge. The condo’s Deco-inspired interior includes uninterrupted views of the city, river, and surrounding neighborhoods. Produced construction document set, presentation drawings, and material specifications.
Rendered Elevation of Lobby Interior
Rendered Elevation of Lobby Interior
Rendered Plan of Lobby Interior
VIR
IDIA
N C
ON
DO
MIN
IUM
S
TH
E P
LA
ZA
CO
ND
OM
INIU
MS
PROJECT: The Plaza, MidtownLOCATION: Atlanta, GAARCHITECT: Smallwood, Reynolds, Stewart, Stewart, & AssociatesPROJECT SIZE: 70,000 SF
Mixed use condominium tower in Midtown Atlanta with 452 residential units. All interior spaces incorporate a clean, contemporary aesthetic with a tasteful use of stone, granite, wood, and custom lighting. Assisted with material selection, finish boards, and design specifications.
Photograph of Model Unit Material Board
Photograph of Model Unit
TH
E P
LA
ZA
CO
ND
OM
INIU
MS
PROJECT: Anavalli Community CenterLOCATION: Tamil Nadu, IndiaARCHITECT: Auroville Earth InstitutePROJECT SIZE: 3,000 SFCOMPLETED: September 2006
Community center sponsored by UNDP (United Nations Development Program) for post-tsunami reconstruction in southeast India. The design of each building incorporates earthquake-resistant technologies and environmentally sustainable materials such as interlocking, compressed earth bricks and ferro-cement roofing. The project also included the training of local masons in sustainable construction techniques and community participation in design and development. Produced drawing set and design specifications and managed construction for all phases of the project.
AU
RO
VIL
LE
CO
MM
UN
ITY
CE
NT
ER
Photograph of Community Center Entrance
Photograph showing completed center
Photograph showing Center Office and Latrines
TO
NG
O P
RE
MIE
R C
YC
LE
SC
HO
OL
PROJECT: Tongo Premier Cycle SchoolLOCATION: Tongo, Mali, West AfricaARCHITECT: Mary AlthoffPROJECT SIZE: 6,000 SFCOMPLETED: November 2010
Premier Cycle School designed and constructed while serving as a Peace Corps volunteer in Mali, West Africa. The design incorporates environmentally sustainable technologies including the use of compressed earth bricks and rainwater harvesting. The corrugated metal roof is raised to increase cross-ventilation and extended overhangs provide shade for walls exposed to the sun. Project emphasizes the use of community participation in design and construction. This is the first work of sustainable architecture to be constructed in the region and will serve as a pilot program for future construction projects. Responsible for project inception, design, fundraising, and construction administration.
Rendering of 3D Computer ModelPhotograph of School Entrance
Round Windows on Back of School
TO
NG
O P
RE
MIE
R C
YC
LE
SC
HO
OL
TO
NG
O P
RE
MIE
R C
YC
LE
SC
HO
OL