MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

26
MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico

Transcript of MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

Page 1: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

MARKET INTERFACE COMMITTEE

OC and PCC Approval Items

March 6-7, 2008

Albuquerque, New Mexico

Page 2: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

OC Approval Items

Revisions to 3 WECC Business Practices

Revisions to 8/7 WECC “Tier 1” Regional Reliability Standards

Page 3: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

BUSINESS PRACTICES for APPROVAL

● Three revisions to WECC Business Practices

INT-BPS-001-2 --- Tagging Protocols

INT-BPS-009-1 --- Capacity Tag Functionality

INT-BPS-011-1 --- Ten Minute Recallable e-Tag Functionality for Reserves

Page 4: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

INT-BPS-001-2 Tagging Protocols

● To identify electronic tagging protocols which are not explicitly addressed in NERC Reliability Standards or NAESB Business Practice Standards

● WR2 – Any Approval Entity who denies an e-tag request without proper justification, which results in a composite status of “denied”, shall take corrective action to assure that the schedule flows with an implemented e-tag.

● Current Business Practices uses the word “dead”

Page 5: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

INT-BPS-009-1 Capacity Tag Functionality

● A Capacity e-tag is intended for use with On-Demand Spinning and Non-spinning Obligation/Resources products only.

● Added Generation Providing Entity to the applicability section and state the GPE is the responsible party for identifying the Energy Product Code.

● Modifies language dealing with adjustments of e-tag to facilitate energy delivery curtailments due to reliability constraints

Page 6: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

INT-BPS-011-1 Ten-Minute Recallable e-Tag Functionality for Reserves

● E-tag as a means to identify Ten Minute Recallable Energy for Reserve products to all associated entities of the transaction and defines the use of Ten Minute Recallable Energy for Reserves as both an energy product and a reserve product.

● Added “Generation Providing Entity” to Applicability section.

● Change in WR1, “Normal” to “Recallable”; WR3, “Sink” to “Source” and “Load Serving Entity” to “Generation Providing Entity”.

Page 7: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

WECC Regional Reliability Standards

● Revisions to WECC Regional Standards VAR-002-WECC-1 -- AVR VAR-501-WECC-1 -- PSS BAL-002-WECC-1 -- Contingency Reserves PRC-004-WECC-1 -- Relays/RAS Misoperation IRO-006-WECC-1 -- Unscheduled Flow FAC-501-WECC-1 -- Transmission Maintenance TOP-007-WECC-1 -- System Operating Limits

Page 8: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

Why so many WECC Reliability Standards being revised?

● Tier One Standards conditionally approved by NERC and FERC Identified changes for permanent replacements

Replace RMS sanction table for enforcement Develop adequate measures for each requirement Add Violation Risk Factors Add Violation Severity Levels

WECC committed to replacements within one year FERC expects WECC to complete replacement

standards “in about a year”

Page 9: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

What happens if we’re not done “in about a year?”

● If we don’t have replacement standards by June 2008, WECC will need to explanation why Possibly no serious consequences if:

Solid reason is provided Plan for timely completion is provided

● Standards will not just “go away” if we vote NO Existing Tier One standards will stay in effect FERC may allow WECC to continue enforcement

via RMS sanction table – UNLIKELY More likely that WECC will be ordered to use the

NERC sanction table for enforcement FERC may impose high VRF/VSL

Page 10: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

What happens if we’re not done “in about a year?”

● If we don’t have replacement standards by June 2008, WECC will need to explanation why Possibly no serious consequences if:

Solid reason is provided Plan for timely completion is provided

● Standards will not just “go away” if we vote NO Existing Tier One standards will stay in effect FERC may allow WECC to continue enforcement

via RMS sanction table – UNLIKELY More likely that WECC will be ordered to use the

NERC sanction table for enforcement FERC may impose high VRF/VSL

Page 11: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

Actions Available to the Operating Committee

● Approve● Amend

Per Step 7 of the Standards Development Process Revisions posted for 10 days Comments posted for 10 days and then re-vote

● Withdraw WECC Board must approve WECC Staff generate Standards Request NERC Procedure for Withdrawal

Page 12: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

VAR-002-WECC-1 Automatic Voltage Regulators

● To ensure that Automatic Voltage Regulators on synchronous generators and condensers shall be kept in service and controlling voltage to help maintain Bulk Electric System reliability.

● In the Western Interconnection, SOL for transmission paths assume that AVR are in service to control voltage to support the transfer capability. The requirements in VAR-002-WECC-1 are to ensure that the generator provides the proper voltage support when generation and transmission outages occur.

Page 13: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

VAR-501-WECC-1 Power System Stabilizers

● To ensure that Power System Stabilizers (PSS) on synchronous generators shall be kept in service.

● In the Western Interconnection, SOL for transmission paths assume that PSS are in service to enhance system damping. The requirements in VAR-501-WECC-1 are to ensure that the generator provides the proper damping to maintain system stability when generation and transmission outages occur.

Page 14: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

BAL-002-WECC-1 Contingency Reserves

You’ll hear all about BAL-002 in about 5 minutes – Patience!!

Page 15: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

PRC-004-WECC-1 Protection System and Remedial Action Scheme Misoperation

● To ensure all transmission and generation Protection System and Remedial Action Scheme (RAS) Misoperations are analyzed and/or mitigated

● More robust requirements for review and analysis of all relay and RAS operations, and

● Timely actions that must be taken to ensure that Misoperations of those elements are not repeated.

Page 16: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

IRO-006-WECC-1 Qualified Path Unscheduled Flow Relief

● Mitigation of transmission overloads due to unscheduled flow on Qualified Transfer Paths

● Reliability Coordinator required to approve or deny request for congestion relief

If the RC approves the congestion relief webSAS automatically issues Tag adjustments

Page 17: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

IRO-006-WECC-1 Qualified Path Unscheduled Flow Relief

● Mitigation of transmission overloads due to unscheduled flow on Qualified Transfer Paths

● Reliability Coordinator required to approve or deny request for congestion relief

If the RC approves the congestion relief webSAS automatically issues Tag adjustments

Page 18: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

FAC-501-WECC-1 Transmission Maintenance

● To ensure the Transmission Owner of a transmission path identified in the table titled Major WECC Transfer Paths including associated facilities has a Transmission Maintenance and Inspection Plan (TMIP); and performs and documents maintenance and inspection activities in accordance with the TMIP.

● The NERC standards do not have any maintenance and test requirements for components such as breakers, reactive devices, transformers and the associated transmission line.

Page 19: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

TOP-007-WECC-1 System Operating Limits

● When actual flows on Major WECC Transfer Paths exceed System Operating Limits (SOL), their associated schedules and actual flows are not exceeded for longer than a specified time.

● Refine R1 to remove the requirement to return a path to within its limit in 20 minute for SOLs based upon Transient Stability and Voltage Stability.

● Refine R2 to limit the compliance period for the Net Scheduled Interchange to the realtime schedules for the next hour.

Page 20: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

TOP-007-WECC-1 System Operating Limits

● When actual flows on Major WECC Transfer Paths exceed System Operating Limits (SOL), their associated schedules and actual flows are not exceeded for longer than a specified time.

● Refine R1 to remove the requirement to return a path to within its limit in 20 minute for SOLs based upon Transient Stability and Voltage Stability.

● Refine R2 to limit the compliance period for the Net Scheduled Interchange to the realtime schedules for the next hour.

Page 21: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

PCC Approval Items

● TPL-001, 002, 003, 004-WECC-1-CR System Performance Criteria

● Performance Category Upgrade Request for Imperial Valley - Miguel 500kV Line and Imperial Valley - Central 500 kV Line

● 2007 Annual Study Report● 2008 Modeling and Validation Work Group

Budget Proposal

Page 22: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

TPL-001, 002, 003, 004-WECC-1-CRSystem Performance Criteria

System simulations and assessments needed periodically to ensure that reliable systems are developed that meet performance requirements with sufficient lead time and to be modified or upgraded as necessary to meet present and future needs Removes requirements in the current NERC/WECC Planning Criteria contained in the NERC Reliability Standards. This regional criteria is to continue the existing WECC planning performance criteria and to define Common Corridor.

Page 23: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

Performance Category Upgrade Request

Performance Category Upgrade Request for Imperial Valley - Miguel 500kV Line and Imperial Valley - Central 500 kV Line

The report presents the seven step process for petitioning for a performance category upgrade request for the double-line outage. SDGE requests that the RPEWG approve the proposed route for the performance category upgrade to Category D with cascading allowed.

Page 24: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

2007 WECC Annual Study Program

The Annual Study Program is conducted to provide base cases for WECC members and staff to use and to provide an ongoing reliability and risk assessment of the Western Interconnected electric system as it exists and as planned over the next ten years.

To achieve this goal, eleven new power flow base cases were compiled and forty-one disturbances were simulated.

Page 25: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

2008 Modeling and Validation Work Group Budget Proposal

The requested items prioritized in the following order:● Composite load model acceptance tests in PSLF

program● Load model system impact studies*● Review of generator model data in WECC

database● Composite load model acceptance tests in PSS/E

program● Load Model Data Tool● Validating SVC models

Page 26: MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.

QUESTIONS???