US Army Corps of EngineersBUILDING STRONG®
Mark Twain LakeWater Control Operations
December 16th, 2015
![Page 2: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/2.jpg)
BUILDING STRONG®
Overview
District and Watershed Overview Project Purposes Water Control Plan Minimum Discharge/Water Quality Issues Sedimentation Surveys
![Page 3: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/3.jpg)
BUILDING STRONG®
Lake Shelbyville
Rend Lake
Carlyle Lake
Wappapello Lake
Mark Twain Lake
Illin
ois
Riv
er
St. Louis District
![Page 4: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/4.jpg)
BUILDING STRONG®
Illin
ois
Riv
er
Reservoirs
Mark Twain Lake
Lake Shelbyville
Carlyle Lake
Rend LakeWappapello Lake
![Page 5: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/5.jpg)
BUILDING STRONG®
Salt River Watershed
![Page 6: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/6.jpg)
BUILDING STRONG®
![Page 7: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/7.jpg)
BUILDING STRONG®
Project Purposes
Flood Control Hydroelectric Power Recreation Water Supply Fish and Wildlife
![Page 8: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/8.jpg)
BUILDING STRONG®
Flood Control
►Flood Control provides flood damage reduction along both the Salt and the Mississippi Rivers.
►Releases maybe restricted because of flooding on the Lower Salt River or on the Mississippi River at Louisiana and/or St. Louis.
Project Purposes
![Page 9: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/9.jpg)
BUILDING STRONG®
Hydropower► Objective is to obtain the maximum amount of
hydroelectric power generation revenue the project is capable of producing in conjunction with other project purposes.
► Normal lake drawdown within the joint use pool as a result of hydroelectric power generation will be limited
• 2 foot per calendar week or 4 foot per month during May – October.
• Remainder of the year limited to 2 foot per week with no monthly maximum.
Project Purposes
![Page 10: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/10.jpg)
BUILDING STRONG®
Recreation
►Objective is to provide the best possible water conditions to support recreational activities such as boating, swimming, fishing, hunting, camping, etc. in coordination with other project purposes.
Project Purposes
![Page 11: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/11.jpg)
BUILDING STRONG®
Water Supply
►The State of Missouri and the Federal Government have negotiated the water supply contracts.
Project Purposes
![Page 12: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/12.jpg)
BUILDING STRONG®
Fish and Wildlife
►Objective is to enhance fish and wildlife to as great an extent as possible without conflicting with the achievement of other project purposes.
►Coordination is necessary between the Water Control Office, MDC, SWPA and Mark Twain Lake Project Office.
Project Purposes
![Page 13: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/13.jpg)
BUILDING STRONG®
Fish and Wildlife
Fish Spawn: The pool elevation of Mark Twain Lake will be regulated from April 23rd to June 15th whenever possible so as to minimize the amount of fluctuation during spawn. This effort is in coordination with SWPA, COE and Missouri Department of Conservation. The Chief of Water Control Operations, taking into account all project purposes, hydrologic conditions and weather forecasts may attempt to moderate pool fluctuations during critical fish spawn when the pool elevation is 610.0 feet NGVD or below coordinated with Missouri Department of Conservation and Mark Twain Lake personnel.
Project Purposes
![Page 14: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/14.jpg)
BUILDING STRONG®
![Page 15: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/15.jpg)
BUILDING STRONG®
Water Control Plan
![Page 16: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/16.jpg)
BUILDING STRONG®
Water Control Plan Conservation Pool (<606.0)
►Minimum flow: 50 cfs►Maximum flow (crop season): 10,000 cfs
• Max releases based upon downstream conditions►Maximum flow (dormant season): 12,000 cfs►Drawdown limits (recreation season):
• 2 feet/week, 4 feet/month►Drawdown limits (non-recreation season):
• 2 feet/week
![Page 17: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/17.jpg)
BUILDING STRONG®
Water Control Plan Flood Control Pool (606.0 – 638.0)
►Minimum flow: 50 cfs►Maximum flow (dormant season): 12,000 cfs►Maximum flow (crop/recreation season)
• Pool < 615, No Mississippi River flood: 10,000 cfs Releases are based upon downstream conditions
• Pool < 615, Mississippi River flood: 6,000 cfs Cut back to 2,000 24 hr prior to crest and releases
increased on recession side Releases are based upon downstream conditions
• Pool >615 & < 638.0: 12,000 cfs Releases are based upon downstream conditions
![Page 18: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/18.jpg)
BUILDING STRONG®
Water Control Plan Surcharge Pool (638.0 – 648.0)
►Minimum flow: 12,000 cfs►Maximum flow:
• Determined from surcharge regulation curve Based upon Pool Elevation and Inflow
• If pool elevation is forecasted to reach surcharge (water on the ground), the max discharge may be preempted increased to discharge called for on the surcharge curve for that given elevation and inflow.
►Recession side of Surcharge - Target 1 to 2 foot fall per day not to exceed previous max event release until pool elevation 620.0
![Page 19: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/19.jpg)
BUILDING STRONG®
![Page 20: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/20.jpg)
BUILDING STRONG®
Minimum Releases
![Page 21: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/21.jpg)
BUILDING STRONG®
Sedimentation Report
![Page 22: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/22.jpg)
BUILDING STRONG®
Sedimentation ReportPurpose
►Determine if the reservoir is filling as designed
►Update Reservoir Area and Capacity Curves
![Page 23: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/23.jpg)
BUILDING STRONG®
Sedimentation Report Sediment Ranges
are Surveyed The survey lines
are used to grossly estimate the reservoir volume
Clarence Cannon
Dam
![Page 24: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/24.jpg)
BUILDING STRONG®
Sedimentation Report Sedimentation does not necessarily
occur at the bottom of the reservoir►Sedimentation tends to occur at the
mouth of the tributaries (i.e. the upper end of the reservoir)
Reservoir
Sedimentation
Dam
![Page 25: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/25.jpg)
BUILDING STRONG®
Sedimentation Report Survey Ranges are compared to the
original 1982 survey and other past surveys
![Page 26: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/26.jpg)
BUILDING STRONG®
Sedimentation Report
2010 Findings►The sedimentation rate is as expected
Amount of Sediment
Deposition (ac-ft)
Rate of Deposition
(ac-ft/yr)
Percent of Storage
Lost
Total Reservoir 56,850 2,060 4.0%
![Page 27: Mark Twain Lake Water Control Operations · US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Operations December 16th, 2015](https://reader036.fdocuments.in/reader036/viewer/2022070612/5b49fdea7f8b9a5c278bddfa/html5/thumbnails/27.jpg)
BUILDING STRONG®
Questions