Mark Neubauer University of Illinois at Urbana-Champaign ( for the ATLAS Collaboration )
Mark Neubauer University of Illinois at Urbana-Champaign Chicagoland LHC Workshop University of...
-
Upload
rosamund-austin -
Category
Documents
-
view
215 -
download
2
Transcript of Mark Neubauer University of Illinois at Urbana-Champaign Chicagoland LHC Workshop University of...
![Page 1: Mark Neubauer University of Illinois at Urbana-Champaign Chicagoland LHC Workshop University of Illinois (UIUC) Feb 11, 2015 LHC (and ATLAS) Status and.](https://reader036.fdocuments.in/reader036/viewer/2022062720/56649f155503460f94c2b340/html5/thumbnails/1.jpg)
Mark NeubauerUniversity of Illinois at Urbana-
Champaign
Chicagoland LHC WorkshopUniversity of Illinois (UIUC)
Feb 11, 2015
LHC (and ATLAS) Status and Plans
![Page 2: Mark Neubauer University of Illinois at Urbana-Champaign Chicagoland LHC Workshop University of Illinois (UIUC) Feb 11, 2015 LHC (and ATLAS) Status and.](https://reader036.fdocuments.in/reader036/viewer/2022062720/56649f155503460f94c2b340/html5/thumbnails/2.jpg)
2
University of Illinois
Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015
From Dusk Till Dawn…
…
Run 1 Dusk Run 2 Dawn
Present state
![Page 3: Mark Neubauer University of Illinois at Urbana-Champaign Chicagoland LHC Workshop University of Illinois (UIUC) Feb 11, 2015 LHC (and ATLAS) Status and.](https://reader036.fdocuments.in/reader036/viewer/2022062720/56649f155503460f94c2b340/html5/thumbnails/3.jpg)
3
University of Illinois
Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015
LHC Status / Plans
![Page 4: Mark Neubauer University of Illinois at Urbana-Champaign Chicagoland LHC Workshop University of Illinois (UIUC) Feb 11, 2015 LHC (and ATLAS) Status and.](https://reader036.fdocuments.in/reader036/viewer/2022062720/56649f155503460f94c2b340/html5/thumbnails/4.jpg)
4
University of Illinois
• LS = Long Shutdown
Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015
LHC Schedule: The Big Picture
• The HL-LHC running starts in 2025 and continues beyond LS4 until 2035
Phase-I Install
![Page 5: Mark Neubauer University of Illinois at Urbana-Champaign Chicagoland LHC Workshop University of Illinois (UIUC) Feb 11, 2015 LHC (and ATLAS) Status and.](https://reader036.fdocuments.in/reader036/viewer/2022062720/56649f155503460f94c2b340/html5/thumbnails/5.jpg)
5
University of Illinois
Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015
LHC Schedule through 2015
Physics
2 week slip
• Expect 1st beam in the week starting March 23!
2015 LHC Schedule
![Page 6: Mark Neubauer University of Illinois at Urbana-Champaign Chicagoland LHC Workshop University of Illinois (UIUC) Feb 11, 2015 LHC (and ATLAS) Status and.](https://reader036.fdocuments.in/reader036/viewer/2022062720/56649f155503460f94c2b340/html5/thumbnails/6.jpg)
6
University of Illinois
Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015
LHC Schedule through 2015
Physics
2015 LHC Schedule (cont.)
![Page 7: Mark Neubauer University of Illinois at Urbana-Champaign Chicagoland LHC Workshop University of Illinois (UIUC) Feb 11, 2015 LHC (and ATLAS) Status and.](https://reader036.fdocuments.in/reader036/viewer/2022062720/56649f155503460f94c2b340/html5/thumbnails/7.jpg)
7
University of Illinois
Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015
LHC Magnet Powering Tests
NOT STARTEDNOT STARTEDNOT STARTED
NOT STARTED
![Page 8: Mark Neubauer University of Illinois at Urbana-Champaign Chicagoland LHC Workshop University of Illinois (UIUC) Feb 11, 2015 LHC (and ATLAS) Status and.](https://reader036.fdocuments.in/reader036/viewer/2022062720/56649f155503460f94c2b340/html5/thumbnails/8.jpg)
8
University of Illinois
Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015
2015 Summary (@13 TeV):• ≤ 1 fb-1 with 50 ns by July 5• ~3 fb-1 with 25 ns by Sept 6• ~12 fb-1 with 25 ns by Nov 3
EPS LP, LHCP Council Moriond
Q: How much and when?
![Page 9: Mark Neubauer University of Illinois at Urbana-Champaign Chicagoland LHC Workshop University of Illinois (UIUC) Feb 11, 2015 LHC (and ATLAS) Status and.](https://reader036.fdocuments.in/reader036/viewer/2022062720/56649f155503460f94c2b340/html5/thumbnails/9.jpg)
9
University of Illinois
Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015
ATLAS Status / Plans
![Page 10: Mark Neubauer University of Illinois at Urbana-Champaign Chicagoland LHC Workshop University of Illinois (UIUC) Feb 11, 2015 LHC (and ATLAS) Status and.](https://reader036.fdocuments.in/reader036/viewer/2022062720/56649f155503460f94c2b340/html5/thumbnails/10.jpg)
10
University of Illinois
Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015
![Page 11: Mark Neubauer University of Illinois at Urbana-Champaign Chicagoland LHC Workshop University of Illinois (UIUC) Feb 11, 2015 LHC (and ATLAS) Status and.](https://reader036.fdocuments.in/reader036/viewer/2022062720/56649f155503460f94c2b340/html5/thumbnails/11.jpg)
11
University of Illinois
Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015
ATLAS Run I Analyses & Publications…
*PC: parachute provided only in exceptional cases
• Run II preparations Trigger menu
development New analysis
framework, MC generation, etc..
FTK ;)
![Page 12: Mark Neubauer University of Illinois at Urbana-Champaign Chicagoland LHC Workshop University of Illinois (UIUC) Feb 11, 2015 LHC (and ATLAS) Status and.](https://reader036.fdocuments.in/reader036/viewer/2022062720/56649f155503460f94c2b340/html5/thumbnails/12.jpg)
12
University of Illinois
Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015
Many Run I results quickly superseded
![Page 13: Mark Neubauer University of Illinois at Urbana-Champaign Chicagoland LHC Workshop University of Illinois (UIUC) Feb 11, 2015 LHC (and ATLAS) Status and.](https://reader036.fdocuments.in/reader036/viewer/2022062720/56649f155503460f94c2b340/html5/thumbnails/13.jpg)
13
University of Illinois
Mark Neubauer Chicagoland LHC Workshop / UIUC / Feb 11, 2015
Summary
0101001011110…
• A feast is coming…• LHC is in the midst of magnet
conditioning for 13 TeV Expect 1st beam at on 23 March
(previously 9 March) “Success-driven schedule”, with ~no
contingency in final powering tests
• ATLAS now in 24/7 shift mode In midst of M8 commissioning work Run I pub Run 2 prep
• Expect ~3 (15) fb-1 early Sep (Nov) Many analyses exceed Run 1
sensitivity with a few fb-1 (or less)
Festina Lente!