Maritime Sector in Brazil Innovation Norway – Rio office
NCE Maritime 04.02 2013
Content
• Market description
• Shipyards – an overview
• Industry numbers
• Opportunities – potential Norwegian suppliers
• Happenings 2013
Market Overview • Brazilian Shipyards order book has 367 orders for
Shipbuilding and Offshore construction.
• The maritime market is experiencing a new booming. After the 70’s, this industry is again on the spot attracting a lot of investments.
• 9 new shipyards under implementation in different regions of the country.
• Brazil is currently the 4th biggest drilling unit builder and the 2nd in production platform construction.
• 28 new drilling units hired by Sete Brasil on behalf of Petrobras.
• Potential Norwegian Expert Contracts: more than USD 7bn.
Source: SINAVAL, ABENAV.
Brazilian Shipbuilding Industry Fact Sheet
• In the 70’s was the 2nd largest in the world
• 14 yards w/ steel processing capacity >30,000tons/year
• 6.9bn DWT order book
• 9 new shipyards under implementation in different regions of the country
• 62,000 workers directly employed. In 2017 the estimate is to reach 100,000
workers.
• 20 offshore oil platforms under construction
• 33 offshore deepwater drilling rigs
• Steel processing total capacity of 562thd tons/year
• 16,8bn BRL of FMM disbursements since 2001
Source: Sinaval
Orderbook
• Production Platforms: 14 will be
built in Brazil and 6 will have the
hulls converted in international
shipyards
• Brazilian orderbook accounts for
8% of the total activity
worldwide
• Investments of 8.7bn BRL will
increase the steel processing
capacity to 950,000 T/year
Source: SINAVAL
Type Quantity
Production platforms 20
Drilling rigs 28
Container ships 7
Bulk carriers 6
Offshore support vessels (OSVs) 70
Products ship 29
Tankers 26
Bunkers 11
Gas tankers 15
River barges 111
River pushers 26
Harbor tugs 18
Total 367
Shipyards in Brazil
Shipyards in Brazil
Source: Sinaval
The shipping industry is concentrated in the extension from Rio de Janeiro to Rio Grande do Sul states.
New Shipyards and Production Capacity
Source: SINAVAL and shipyards
New shipyards State Steel Processing
1000T/year Area
1000km² Dry
dock Carrier Quay
Estaleiro Enseada do Paraguaçu BA 36 1600 1 0 1
Estaleiro Jurong Aracruz ES 48 820 1 0 1
Estaleiros do Brasil RS 30 1500 1 0 1
Estaleiro CMO PE 40 400 0 0 1
Estaleiro OSX RJ 180 2500 1 4 1
Estaleiro Oceana SC 20 310 1 0 1
Estaleiro STX Promar PE 20 400 1 0 1
Estaleiro Rio Tietê SP 5 250 0 1 1
Estaleiro Wilson, Sons Rio Grande RS 13 120 0 1 1
Total 392 7900 6 6 9
Some industry numbers
Petrobras Construction Needs
Source: Petrobras
Production Units Construction, Destinations, Opportunities
Source: Petrobras
Drilling Units Construction, Destinations, Opportunities
Source: Petrobras
Tank Ships (PROMEF Program), Shipyards, Opportunities
Source: Petrobras
PROMEF – Transpetro Fleet Renewal Program
Source: Sinaval
Shipyards Types of Ships 2012 2013 2014 2015 2016 2017 2018
2019 2020
Atlântico Sul 10 Suezmax 1 2 3 2 2
Atlântico Sul 4 Suezmax DP 3 1
Atlântico Sul 5 Aframax 2 2 1
Atlântico Sul 3 Aframax DP 3
Mauá 12 products 2 1 2 3 3
Mauá 4 Panamax 3 1
STX Promar 8 gas tankers 2 3 3
TBD 3 bunkers 1 2
Total: 49 ships 3 3 8 8 8 5 2 5 6
Opportunities – Potential Norwegian Equipment
15
Overview : Setebrasil (www.setebr.com)
16
• Setebrasil is a Brazilian company owned by Petrobras,
Brazilian Pension Funds, Brazilian large banks, etc.
• Sete is to build 28 drilling units in Brazilian shipyards.
Minimum local content requirement: range from 55%
to 65% – more than USB 25 bn.
• Local content requirements increasing progressively
for units under construction at the same shipyard.
• Assets: drillship and semi-subs, 6th generation drilling
units, operating in water depths of 3.000 meters, and
Dynamic Position (DP-3).
• Setebrasil has partnered with reputable operators who
will have minority ownership of their respective units.
Drilling Units Main Characteristics
• Water depth: 3,000 meters
• Drill Pipe: 10,000 meters
• Dynamic Positioning System (DP): IMO Class 3
• Derrick: allows simultaneous operations of pipe assembly and drilling
• Maximum work pressure: 15,000 psi
• Living Quarters: 180 people
• Self propelled, minimum speed 11 knots for Drillship and 7.5 for Semi-Sub
Potential Norwegian Equipment
18
• Main Drilling Systems
• Drilling System Sub Suppliers
Drilling Packages
• Thrusters
• Generators
• Dynamic Positioning
Marine Packages
• Living Quarter
• Drilling Module
• Hull Modules Modules
Potential Norwegian Equipment
19
• Design
• Vessel Classification
• Paint
• Rescue Boats/Lifeboat
• Dehumidifier
• Fire Alarm and Detection System
• Lights
• Consultancy Services
• Screw Air Compressor
• Switchboards
• Gyro Compass
• Integrated Control and Monitoring Systems
• Radar
• Transformer
Additional Equipment/Content
Potential Norwegian Equipment
20
• Vaccum Toilet Systems
• Aluminium Structures, helideck
• Control Systems
• Davits
• Support Systems
• Lanterns
• Life Rafts
• Cranes and Winches
• Burner Booms
• Fire Fighting Systems
• Fendres
• Elevators
• Anti Fouling System/ICCP
• Doors and Hatches
• Furniture
• Wheelhouse Consoles
Additional Equipment/Content
Overview of the SETE yards
Potential Norwegian Equipment
22
• Sete financing will mainly be provided by BNDES (Brazilian Development Bank).
• GIEK/Eksportkreditt will play a very important role in the transaction.
• DNB and Banco Santander are financial advisors for Sete.
• Setebrasil is emphasizing the importance of contracts of Norwegian interest and
production to be structured in a way to maximizes the financing for Sete from
GIEK/Eksportkreditt
• Workshops to present Norwegian suppliers to the shipyards that won the
contracts will be conducted in the beginning of March (week 10 – to be
confirmed)
Events 2013
Happenings 2013
• SETE Brazil workshop – March 4. – 8. (TBC)
• (FINEP O&G industry matchmaking – March 14. – 15.)
• OSV Conference Brazil – May 23. – 24.
• Navalshore (with NME) – August 13. – 15.
• OTC Brazil – October 29. – 31.
Keep in mind
• SETE project: • Singaporean owned yards (Brasfels, Jurong) contracts are
generally handled from Singapore • Norwegian content requirements from GIEK/Eksportkreditt vs.
Local content requirements
• Local content: • New ANP proposal expected soon • Hearing round closes February 14. • No major changes expected
Appendix:
Shipyards in Brazil, description
• Workforce peak: 4000 workers (May/13);
P-58 (LC 63%)
• Whales Park
• Construction of 3 modules and integration;
P-63 (LC 65%)
• Papa-Terra;
• Construction of 7 modules and integration;
Honório Bicalho Shipyard
Source: Petrobras Source: Petrobras
2022
2503
4200
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
O&G Production Curve (kbpd)
P-58 P-63
• Workforce peak (ERS1 and 2): 7750 workers (Jul/15);
P-55 (LC 65%) - Roncador Mod. 3
• Construction of the 7 modules, deckbox and integration;
P-66 Replicant 1 (LC 70%) - Lula High;
• Construction of the Hull;
P-67 Replicant 2 (LC 70%) - Lula Central;
• Construction of the Hull;
P-68 Replicant 3 (LC 70%) - Lula South;
• Construction of the Hull;
P-69 Replicant 4 (LC 70%) - Lula North;
• Construction of the Casco;
P-70 Replicant 5 (LC 70%) - Lula Extreme South;
• Construction of the Hull;
P-71 Replicant 6 (LC 70%) - Iara Horst;
• Construction of the Hull;
P-72 Replicant 7 (LC 70%) - Iara NW;
• Construction of the Hull;
P-73 Replicant 8 (LC 70%) - Carcará;
• Construction of the Hull;
Rio Grande 1 Shipyard (ERG1)
Source: Petrobras Source: Petrobras
2022
2503
4200
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
O&G Production Curve (kbpd)
P-55
P-66, P-67, P-68, P-69
P-70 P-71
P-73
• Workforce peak (ERS1 and 2): 7750 workers (Jul/15);
• 3 drilling rigs:
Cassino (LC 55%) – Lula North
Curumim (LC 60%) – Exploration
Salinas (LC 60%) - Exploration
Rio Grande 2 Shipyard (ERG2)
Source: Petrobras Source: Petrobras
2022
2503
4200
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
O&G Production Curve (kbpd)
Cassino
Salinas
Curumim
• Workforce peak: 7500 workers (Aug/12);
• 6 semi-submersible drilling rigs:
Urca (LC 55%) – Franco East
Frade (LC 55%) – Júpiter
Bracuhy (LC 60%) – Carcará
Portogalo (LC 60%) – Iara Surround
Mangaratiba (LC 65%) – Florim
Botinas (LC 55%) – Florim
P-61 (LC 65%) – Papa-Terra
• Construction of the hull and integration
P-66 (LC 67%) – Lula High
• Construction of 6 modules and integration
P-69 (LC 67%) – Lula North
• Construction of 6 modules and integration
Cidade São Paulo (LC 65%) – Sapinhoá Pilot
• Construction of 4 modules and integration
Cidade Paraty (LC 65%) – Lula NE Pilot
• Construction of 5 modules and integration
Cidade Mangaratiba (LC 65%) – Iracema South
• Construction of 4 modules and integration
Brasfels Shipyard
Source: Petrobras Source: Petrobras
2022
2503
4200
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
O&G Production Curve (kbpd)
Cidade São Paulo Cidade Paraty
P-61
P-66 P-69 Urca
Cidade Mangaratiba
Frade Bracuhy
Mangaratiba Botinas
Portogalo
• Workforce peak: 3000 workers (Aug/12);
P-55 (LC 65%) – Roncador Mod. 3 – modules construction:
• M-07 – Booster Compression and Gas Dehydration
• M-08 – Amines Unit
P-58 (LC 63%) – Whales Park – modules construction:
• M-01 – Gas Dehydration
• M-03 – CO2 and H2S Removal
• M-05/06/07 – Oil Processing
• M-10 – Water Injection
• M-10A – SRU Sulfate Removal
P-62 (LC 63%) – Roncador Mod. 4 – modules construction:
• M-01 – Gas Dehydration and Torch System
• M-03 – CO2 and H2S Removal
• M-05/06/07 – Oil Processing
• M-10 – Water Injection
• M-10A – SRU Sulfate Removal
UTC Engenharia
Source: Petrobras Source: Petrobras
2022
2503
4200
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
O&G Production Curve (kbpd)
P-55
P-58 P-62
• Workforce peak: 1900 workers (Mar/13);
Cidade de Ilhabela (LC 65%) – Sapinhoá North
• Construction of 10 modules and integration of the FPSO
Brasa Shipyard
Source: Petrobras Source: Petrobras
2022
2503
4200
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
O&G Production Curve (kbpd)
Ilhabela
• Workforce peak: 3300 workers (Jul/14);
Celso Furtado (LC 74%) – Product Vessels 48ktpb
Sérgio Buarque de Holanda (LC 73%) – Product Vessel 48ktpb
Rômulo Almeida (65%) – Product Vessel 48ktpb
José Alencar (LC 65%) – Product Vessel 48ktpb
4 Vessels Panamax (LC 65%) 65 a 80ktpb
3 Product Vessels (LC 65%) 48ktpb
5 Product Vessels (LC 65%) 32ktpb
Mauá Shipyard
Source: Petrobras Source: Petrobras
2022
2503
4200
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
O&G Production Curve (kbpd)
JA
1 Panamax 2 Products
CF
SBH, RA
3 Panamax
3 Products
3 Products
• Workforce peak: 2600 workers (Jan/12);
P-58 (LC 63%) – Whales Park – Construction of 5 modules
• M-02 (A/B/C) – Gas compression
• M-09 – Booster compressor
• M-12 – Cargo handling
P-62 (LC63%) – Roncador Mod. 4 - Construction of 5 modules:
• M-02 (A/B/C) – Gas compression
• M-09 – Booster compressor
• M-12 – Cargo handling
Cidade Paraty (LC 65%) – Lula NE Pilot – Construction of 4 modules:
• Module of cargo handling
• Module of manifold
• Module of treatment of gas A
• Module of compression and gas injection
Cidade Ilhabela (LC 65%) – Sapinhoá Norte – Construction of 4 modules:
• TS005 – Injection of chemical products
• TS077 – Flare vases
• TS078 – CO2 Removal
• TS079 – H2S Removal
Cidade Mangaratiba (LC 65%) – Iracema Sul – Construction of 5 modules:
• Module of water and utilities injection
• Module of gas treatment
• Module of electrical equipment
• Module of high and low separation
• Module of flare vases
Nuclep Construction Site
Source: Petrobras
2022
2503
4200
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
O&G Production Curve (kbpd)
Paraty
P-58 P-62 Ilhabela Mangaratiba
• Workforce peak: 8000workers (Aug/16);
• 7 drillships;
Arpoador (LC 55%) – Lula Norte
Copacabana (LC 55%) – Franco NE
Grumari (LC 60%) – Carcará 1
Ipanema (LC 60%) – Júpiter
Leblon (LC 65%) – Franco Leste
Leme (LC 65%) – Franco Leste
Marambaia (LC 65%) – Entorno de Iara
P-55 (LC 65%) – Roncador Mod. 3 – Hull construction
P-62 (LC 63%) – Roncador Mod. 4 – Conversion, construction of 3 modules and integration
João Cândido (LC 70%) – Suezmax – 158ktpb
Zumbi dos Palmares (LC 65%) – Suezmax – 158ktpb
8 Suezmax ships (LC 65%) – 158ktpb
5 Aframax ships (LC 65%) – 80 to 120ktpb
4 Suezmax DP ships (LC 70%) – 140 to 175ktpb
3 Aframax DP ships (LC 70%) – 80 to 120ktpb
Atlântico Sul Shipyard
Source: Petrobras Source: Petrobras
2022
2503
4200
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
O&G Production Curve (kbpd)
2 Suezmax
Ipanema 2 Aframax 2 Aframax
Leme Leblon
1 Suezmax 3 Aframax
JC 1 Suezmax
2 Suezmax
P-62 3 Suezmax
2 Suezmax, Grumari Arpoador Copacabana
3 Suezmax 1 Aframax Marambaia
• Workforce peak: 4200workers (May/16);
• 2 auto-raising drilling rigs;
P-59 (LC 70%) – Peroá
P-60 (LC 70%) – BM-C-27
• 6 drillships:
Ondina (LC 55%) – Iara Horst
Pituba (LC 55%) – Iara NW
Boipeba (LC 60%) – Exploration
Interlagos (LC 60%) – Exploration
Itapema (LC 65%) – Iara NW
Comandatuba (LC 65%) – Exploration
Enseada do Paraguaçú and São Roque Shipyards
Source: Petrobras Source: Petrobras
2022
2503
4200
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
O&G Production Curve (kbpd)
Ondina
Pituba
Boipeba
Interlagos Itapema
Comandatuba
P-59 P-60
• Workforce peak: 6500workers (Apr/15);
• 6 drillships:
Guarapari (LC 55%) – Tupi NE
Camburi (LC 55%) – Guará South
Itaoca (LC 60%) – Iara NW
Itaúnas (LC 60%) – Exploration
Siri (LC 65%) – Exploration
Sahy (LC 65%) – Exploration
P-68 Replicant #3 (LC 67%) – Lula South
• Construction of 6 modules and integration
P-71 Replicant #6 (LC 67%) – Iara Horst
• Construction of 6 modules and integration
Jurong Aracruz Shipyard
Source: Petrobras Source: Petrobras
2022
2503
4200
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
O&G Production Curve (kbpd)
P-68 Guarapari
P-71 Camburi Itaoca
Itaúnas Siri
Sahy
• Workforce peak: 12000workers (Jul/16);
P-67 Replicant #2 (LC 67%) – Lula Central
• Construction of 6 modules and integration
P-70 Replicant #5 (LC 67%) – Lula Extreme South
• Construction of 6 modules and integration
OSX Shipyard
Source: Petrobras Source: Petrobras
2022
2503
4200
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
O&G Production Curve (kbpd)
P-67
P-70